L形平面鋼筋混凝土框架連續(xù)倒塌分析
[Abstract]:In order to study the influence of floor slab on L-shaped plane reinforced concrete frame, taking a primary school building as a background, the finite element model under four working conditions is established based on the method of removing components, and the nonlinear dynamic analysis method is adopted. This paper discusses the continuous collapse resistance of the model without floor and floor under four working conditions. The results show that, for the model without floor slab, the other three conditions will cause the continuous collapse of the structure and the failure of the outer corner column of the bottom floor, except for the inner column of the bottom floor, and for the floor model, the failure of the external corner column of the bottom floor will be more obvious. Only the failure of the outer corner column of the bottom floor will cause the continuous collapse of the structure, which needs to be strengthened. Finally, by analyzing the deformation modes of substructures under the action of beam mechanism and catenary mechanism, a method is proposed to evaluate whether the structure collapses by comparing the work done by unbalanced loads with the energy dissipation of substructures.
【作者單位】: 山東科技大學(xué)山東省土木工程防災(zāi)減災(zāi)重點(diǎn)實(shí)驗(yàn)室;濟(jì)寧市匯恒工程技術(shù)咨詢有限公司;
【基金】:山東省科技發(fā)展計(jì)劃項(xiàng)目(2013YD02043)
【分類號(hào)】:TU375.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 蘇發(fā)慧;;抗連續(xù)倒塌房屋投資數(shù)學(xué)模型研究[J];安徽建筑工業(yè)學(xué)院學(xué)報(bào)(自然科學(xué)版);2010年06期
2 陳俊嶺;馬人樂;何敏娟;;防止建筑物連續(xù)倒塌的措施[J];特種結(jié)構(gòu);2005年04期
3 王怡然;朱博;;淺析建筑物倒塌的原因及防止連續(xù)倒塌的方法[J];山西建筑;2008年07期
4 胡曉斌;錢稼茹;;多層平面鋼框架連續(xù)倒塌仿真分析[J];力學(xué)與實(shí)踐;2008年04期
5 傅學(xué)怡;黃俊海;;結(jié)構(gòu)抗連續(xù)倒塌設(shè)計(jì)分析方法探討[J];建筑結(jié)構(gòu)學(xué)報(bào);2009年S1期
6 侯耿峰;周全武;吳趙強(qiáng);;框架結(jié)構(gòu)連續(xù)倒塌研究現(xiàn)狀[J];山西建筑;2010年14期
7 張堅(jiān);路崗;虞煒;林峰;趙新源;;吊樓結(jié)構(gòu)抗連續(xù)倒塌設(shè)計(jì)[J];建筑結(jié)構(gòu);2010年S2期
8 黃鑫;陳俊嶺;馬人樂;;建筑物抗連續(xù)倒塌研究現(xiàn)狀和亟待解決的問題[J];特種結(jié)構(gòu);2010年03期
9 ;采用優(yōu)化方法進(jìn)行鋼框架抗連續(xù)倒塌設(shè)計(jì)[J];鋼結(jié)構(gòu);2011年03期
10 李輝;趙偉;;結(jié)構(gòu)連續(xù)倒塌分析研究現(xiàn)狀及設(shè)計(jì)方法綜述[J];山西建筑;2011年21期
相關(guān)會(huì)議論文 前10條
1 梁海峰;周恒芳;;結(jié)構(gòu)抗連續(xù)倒塌設(shè)計(jì)規(guī)定及措施[A];土木建筑學(xué)術(shù)文庫(第13卷)[C];2010年
2 梁益;陸新征;繆志偉;葉列平;;結(jié)構(gòu)的連續(xù)倒塌:規(guī)范介紹和比較[A];第六屆全國(guó)工程結(jié)構(gòu)安全防護(hù)學(xué)術(shù)會(huì)議論文集[C];2007年
3 杜義欣;溫凌燕;伍俊;;重要建筑物恐怖襲擊下的防連續(xù)倒塌設(shè)計(jì)[A];第七屆全國(guó)工程結(jié)構(gòu)安全防護(hù)學(xué)術(shù)會(huì)議論文集[C];2009年
4 王鐵成;康健;李志萍;;空間框架抗連續(xù)倒塌分析[A];第19屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(第Ⅲ冊(cè))[C];2010年
5 單亮;汪洋;;現(xiàn)代結(jié)構(gòu)工程中的連續(xù)倒塌研究[A];第七屆全國(guó)現(xiàn)代結(jié)構(gòu)工程學(xué)術(shù)研討會(huì)論文集[C];2007年
6 任沛琪;李易;鄭元帥;陸新征;;某新型鐵路站房連續(xù)倒塌分析[A];第六屆全國(guó)防震減災(zāi)工程學(xué)術(shù)研討會(huì)暨第二屆海峽兩岸地震工程青年學(xué)者研討會(huì)論文集(Ⅱ)[C];2012年
7 張堅(jiān);路崗;虞煒;林峰;趙新源;;吊樓結(jié)構(gòu)抗連續(xù)倒塌設(shè)計(jì)[A];第二屆全國(guó)工程結(jié)構(gòu)抗震加固改造技術(shù)交流會(huì)論文集[C];2010年
8 張建興;施剛;王元清;石永久;;鋼框架抗連續(xù)倒塌研究綜述[A];鋼結(jié)構(gòu)工程研究(九)——中國(guó)鋼結(jié)構(gòu)協(xié)會(huì)結(jié)構(gòu)穩(wěn)定與疲勞分會(huì)第13屆(ISSF-2012)學(xué)術(shù)交流會(huì)暨教學(xué)研討會(huì)論文集[C];2012年
9 潘毅;劉宜豐;秦楠;李玲嬌;;成都市規(guī)劃展覽館輔樓抗連續(xù)倒塌評(píng)估(Ⅰ)——基于概念設(shè)計(jì)的線性靜力分析[A];第六屆全國(guó)防震減災(zāi)工程學(xué)術(shù)研討會(huì)論文集(Ⅰ)[C];2012年
10 鳳俊敏;舒贛平;;連續(xù)倒塌分析方法的比較研究[A];慶祝劉錫良教授八十華誕暨第八屆全國(guó)現(xiàn)代結(jié)構(gòu)工程學(xué)術(shù)研討會(huì)論文集[C];2008年
相關(guān)博士學(xué)位論文 前4條
1 李志萍;基于替代路徑法的結(jié)構(gòu)抗連續(xù)倒塌能力研究[D];天津大學(xué);2014年
2 劉傳卿;框架結(jié)構(gòu)的連續(xù)倒塌分析[D];天津大學(xué);2010年
3 陳曄;爆炸與次生火災(zāi)聯(lián)合作用下鋼結(jié)構(gòu)損傷破壞及連續(xù)倒塌研究[D];天津大學(xué);2016年
4 李鳳武;鋼筋混凝土框架柱突然失效試驗(yàn)研究[D];湖南大學(xué);2014年
相關(guān)碩士學(xué)位論文 前10條
1 呂婷;高層建筑混凝土框架結(jié)構(gòu)雙柱失效的抗連續(xù)倒塌研究[D];山東建筑大學(xué);2015年
2 王寧娟;不規(guī)則框架結(jié)構(gòu)連續(xù)倒塌的動(dòng)力效應(yīng)研究[D];西安建筑科技大學(xué);2015年
3 崔瑞夫;樓板對(duì)RC框架結(jié)構(gòu)抗連續(xù)倒塌性能的影響[D];長(zhǎng)安大學(xué);2015年
4 梁緯球;鋼—混凝土組合梁連續(xù)倒塌性能與倒塌機(jī)理分析[D];廣西大學(xué);2015年
5 廖浚哲;網(wǎng)架結(jié)構(gòu)連續(xù)倒塌動(dòng)力效應(yīng)分析[D];南昌大學(xué);2015年
6 趙同陽;鋼框架抗連續(xù)倒塌設(shè)計(jì)方法研究[D];大連理工大學(xué);2015年
7 李寰;考慮抗震設(shè)計(jì)與填充墻影響的R.C.框架抗連續(xù)倒塌性能仿真分析[D];南昌大學(xué);2015年
8 姜晨玉;多層RC框架結(jié)構(gòu)抗連續(xù)倒塌實(shí)用分析方法研究[D];石家莊鐵道大學(xué);2014年
9 姚宇飛;爆炸荷載作用下鋼筋混凝土框架結(jié)構(gòu)連續(xù)倒塌分析方法比較研究[D];天津大學(xué);2014年
10 孫倩倩;預(yù)壓裝配式預(yù)應(yīng)力混凝土框架抗連續(xù)倒塌設(shè)計(jì)方法研究[D];合肥工業(yè)大學(xué);2015年
,本文編號(hào):2122598
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2122598.html