天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 建筑工程論文 >

VRV系統(tǒng)在高速公路沿線(xiàn)某房建設(shè)施應(yīng)用研究

發(fā)布時(shí)間:2018-07-07 19:21

  本文選題:IPLV + 能效仿真; 參考:《西安建筑科技大學(xué)》2017年碩士論文


【摘要】:近年來(lái),我國(guó)高速公路發(fā)展迅猛,高速公路沿線(xiàn)房建設(shè)施為高速公路的正常運(yùn)行提供一系列功能,其空調(diào)系統(tǒng)是否合理、可靠直接影響著高速公路沿線(xiàn)房建設(shè)施功能的發(fā)揮。VRV系統(tǒng)因具有使用范圍寬廣、設(shè)計(jì)使用靈活、能效比較高等優(yōu)點(diǎn),但能否在高速公路沿線(xiàn)合理應(yīng)用值得研究。一直以來(lái),熱泵機(jī)組的能效比備受關(guān)注,在VRV被廣泛應(yīng)用的今天,如何正確評(píng)價(jià)其運(yùn)行能效顯得十分重要。我國(guó)采用IPLV評(píng)價(jià)VRV的能效水平,應(yīng)該在35℃、31.5℃、28℃、24.5℃的室外溫度下,通過(guò)控制室內(nèi)機(jī)的開(kāi)機(jī)率使機(jī)組分別達(dá)到100%、(75±10)%、(50±10)%、(25±10)%的負(fù)荷率,用得到的EER計(jì)算IPLV(C)。本文利用Energy Plus軟件中的VRV模型對(duì)IPLV進(jìn)行模擬研究,將變室外溫度下的得到結(jié)果與整個(gè)供冷季節(jié)能機(jī)組EER平均值對(duì)比,結(jié)果相差10.6%。與定室外溫度下得到的結(jié)果相比,變室外溫度條件下得到結(jié)果更接近真實(shí)值。另外,模擬結(jié)果顯示整個(gè)供熱季節(jié)機(jī)組平均COP為3.41,分析其原因?yàn)槭彝鈸Q熱器結(jié)霜影響了機(jī)組的制熱性能。雖然VRV系統(tǒng)優(yōu)點(diǎn)突出,但其在冬季制熱運(yùn)行時(shí)存在著結(jié)霜的技術(shù)障礙。本文對(duì)應(yīng)用于寶漢高速南鄭收費(fèi)站辦公樓的一套VRV系統(tǒng)進(jìn)行現(xiàn)場(chǎng)測(cè)試,分析了機(jī)組結(jié)霜、除霜過(guò)程中各參數(shù)的變化規(guī)律,以室外換熱器蒸發(fā)溫度為依據(jù),將結(jié)霜周期進(jìn)行細(xì)化,指出各參數(shù)在各細(xì)化時(shí)期內(nèi)的變化規(guī)律。有關(guān)除霜起始點(diǎn)的設(shè)定,提出設(shè)定最小結(jié)霜時(shí)間,并基于實(shí)驗(yàn)數(shù)據(jù)提出以制熱量為控制目標(biāo),當(dāng)大氣干球溫度與室外換熱器底部盤(pán)管表面溫度滿(mǎn)足T_e=KT_a-α,機(jī)組開(kāi)始除霜。
[Abstract]:In recent years, the expressway in China has developed rapidly. The construction of the buildings along the highway provides a series of functions for the normal operation of the expressway. Whether the air-conditioning system is reasonable and reliable, it directly affects the function of the construction of the buildings along the highway. The.VRV system has the advantages of wide use, flexible design and higher energy efficiency. The energy efficiency ratio of the heat pump unit has been paid much attention. Today, how to evaluate the energy efficiency of the VRV is very important. In our country, the IPLV evaluation of the energy efficiency of VRV should be under the control room at 35, 31.5, 28, 24.5. The opening rate of the inner machine makes the unit reach 100%, (75 + 10)%, (50 + 10)%, (25 + 10)% and IPLV (C) calculated with the obtained EER. In this paper, the VRV model in Energy Plus software is used to simulate IPLV, and the results are compared with the EER average of the whole cooling season, and the result is a difference of 10.6%. and room setting. Compared with the external temperature, the results obtained under the variable outdoor temperature are closer to the real value. In addition, the simulation results show that the average COP of the unit in the whole heating season is 3.41. The reason is that the frost formation of the outdoor heat exchanger affects the thermal performance of the unit. Although the advantages of the VRV system are outgoing, it has frosting in the winter heating operation. In this paper, a set of VRV system used in the office building of the Nanzheng toll station in Bao Han expressway is tested in this paper. The changes of the parameters in defrosting and defrosting are analyzed. The frost cycle is refined on the basis of the evaporation temperature of the outdoor heat exchanger, and the change rules of each parameter in each period are pointed out. The setting of the starting point of frost is set up, and the minimum frosting time is set up. Based on the experimental data, it is proposed to control the heat as the control target. When the air dry ball temperature and the surface temperature of the bottom coil surface of the outdoor heat exchanger meet T_e=KT_a- a, the unit starts defrosting.
【學(xué)位授予單位】:西安建筑科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:TU83

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 朱丹丹;燕達(dá);王闖;洪天真;;建筑能耗模擬軟件對(duì)比:DeST、EnergyPlus and DOE-2[J];建筑科學(xué);2012年S2期

2 肖婧;王偉;郭慶慈;路偉鵬;趙耀華;;空氣源熱泵在北京低溫環(huán)境下運(yùn)行性能的現(xiàn)場(chǎng)實(shí)測(cè)研究[J];建筑科學(xué);2010年10期

3 肖彪;;風(fēng)冷熱泵商用空調(diào)除霜控制理論分析[J];家電科技;2010年03期

4 江樂(lè)新;張學(xué)文;何俊杰;黎恢山;;空氣源熱泵熱水機(jī)組模糊除霜控制器的研究[J];制冷空調(diào)與電力機(jī)械;2008年02期

5 葛住軍;許文斌;付彬;田立強(qiáng);;最大平均制熱量控制除霜方法的實(shí)驗(yàn)研究[J];制冷;2007年02期

6 王洋;江輝民;馬最良;姜益強(qiáng);姚楊;;增大蒸發(fā)器面積對(duì)延緩空氣源熱泵冷熱水機(jī)組結(jié)霜的實(shí)驗(yàn)與分析[J];暖通空調(diào);2006年07期

7 程衛(wèi)紅;姚楊;馬最良;;空氣源熱泵空氣側(cè)換熱器結(jié)構(gòu)參數(shù)對(duì)結(jié)霜特性的影響[J];沈陽(yáng)建筑大學(xué)學(xué)報(bào)(自然科學(xué)版);2006年03期

8 劉斌,楊永安,楊昭;低溫結(jié)霜模型及影響因素的分析[J];制冷學(xué)報(bào);2004年04期

9 王鐵軍,唐景春,劉向農(nóng),倪宜華;風(fēng)源熱泵空調(diào)器除霜技術(shù)實(shí)驗(yàn)研究[J];低溫與超導(dǎo);2003年04期

10 馬最良,楊自強(qiáng),姚楊,喻銀平;空氣源熱泵冷熱水機(jī)組在寒冷地區(qū)應(yīng)用的分析[J];暖通空調(diào);2001年03期

相關(guān)會(huì)議論文 前2條

1 夏建軍;張曉亮;江億;;VRF系統(tǒng)室內(nèi)機(jī)通斷運(yùn)行控制下系統(tǒng)運(yùn)行狀態(tài)分析[A];全國(guó)暖通空調(diào)制冷2006年學(xué)術(shù)年會(huì)文集[C];2006年

2 黃虎;李志浩;束鵬程;;提高風(fēng)冷熱泵冷熱水機(jī)組結(jié)霜工況下性能的途徑[A];1999年全國(guó)空調(diào)新技術(shù)交流會(huì)論文集[C];1999年

相關(guān)博士學(xué)位論文 前1條

1 董建鍇;空氣源熱泵延緩結(jié)霜及除霜方法研究[D];哈爾濱工業(yè)大學(xué);2012年

相關(guān)碩士學(xué)位論文 前1條

1 朱佳鶴;基于分區(qū)域結(jié)霜圖譜的新型THT除霜控制方法的研究與開(kāi)發(fā)[D];北京工業(yè)大學(xué);2015年

,

本文編號(hào):2105994

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2105994.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶(hù)c20f9***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com