日喀則地區(qū)駕駛?cè)丝荚囍行慕ㄔO(shè)項目的質(zhì)量控制研究

發(fā)布時間:2018-04-21 17:32

  本文選題:項目建設(shè) + 質(zhì)量控制 ; 參考:《吉林大學(xué)》2017年碩士論文


【摘要】:質(zhì)量是項目成敗的關(guān)鍵,日喀則地區(qū)駕駛?cè)丝荚囍行慕ㄔO(shè)項目處于西藏海拔3800米以上,是由吉林省援建的交鑰匙工程,由于項目建設(shè)的質(zhì)量關(guān)乎人民生命財產(chǎn)安全、關(guān)乎民族團結(jié)和吉藏兩地友誼,對質(zhì)量的要求更是非常嚴格。工程未全面驗收時即出現(xiàn)墻磚脫落、樓內(nèi)地面面層出現(xiàn)不規(guī)則的裂縫等問題,對本項目質(zhì)量問題的研究不僅為項目后續(xù)配套工程建設(shè)的質(zhì)量控制提供指導(dǎo)和參考,而且對于其他高海拔地區(qū)同類項目建設(shè)具有重要的借鑒意義。本文運用質(zhì)量管理學(xué)和統(tǒng)計學(xué)等相關(guān)理論與分析方法,對質(zhì)量管理理論和統(tǒng)計結(jié)果進行研究,對項目存在問題運用數(shù)據(jù)統(tǒng)計,運用魚刺圖法針對出現(xiàn)的質(zhì)量問題進行結(jié)果分析,運用項目質(zhì)量管理原理,對發(fā)現(xiàn)的設(shè)備質(zhì)量問題提出控制方案及相關(guān)的保障措施。具體的研究方式方面,本文從現(xiàn)存的質(zhì)量問題入手,對以往存在的問題進行統(tǒng)計、分析,按照質(zhì)量控制的基本原理,將全過程分為三個階段:施工前、施工過程中和施工后期三個階段,形成項目質(zhì)量問題統(tǒng)計表,用數(shù)據(jù)方式對現(xiàn)存在的質(zhì)量問題進行展示和分析,然后利用項目存在問題的五大成因,即“人、機、料、法、環(huán)”對質(zhì)量問題成因進行歸納分析;再次,根據(jù)實際分析結(jié)果制定質(zhì)量控制方案;最后,按照全員、全過程、全企業(yè)的“三全”管理方式,對質(zhì)量控制方案提出質(zhì)量實施保障措施。在研究方法方面,本文綜合運用了調(diào)查法、統(tǒng)計分析法、文件檢索法、魚刺圖法等,來收集現(xiàn)存的質(zhì)量問題相關(guān)信息及數(shù)據(jù),并對其結(jié)果進行量化的統(tǒng)計和整理。采用歷史與實證分析相結(jié)合的方法系統(tǒng)分析項目內(nèi)外部條件及質(zhì)量管理現(xiàn)狀與問題,采用定量與經(jīng)驗分析相結(jié)合的方法提出項目質(zhì)量控制方案,采用規(guī)范與定性分析相結(jié)合的方法提出了實施項目質(zhì)量控制方案的相關(guān)保障措施。
[Abstract]:Quality is the key to the success or failure of the project. The construction project of Xigaze driving Test Center, located above 3800 meters above sea level in Tibet, is a turnkey project supported by Jilin Province. Since the quality of construction of the project is related to the safety of people's lives and property, Related to national unity and friendship between Kyrgyzstan and Tibet, the quality of the requirements are very strict. When the project is not fully accepted, the wall brick falls off, the floor surface of the building appears irregular cracks, and so on. The research on the quality problem of this project not only provides the guidance and reference for the quality control of the subsequent supporting project construction, but also provides a reference for the construction of the project. And for other high-altitude areas similar projects have important reference significance. In this paper, the quality management theory and statistical results are studied by using the relevant theories and analysis methods of quality management and statistics, and the problems existing in the project are analyzed by using data statistics, and the results of the quality problems are analyzed by the fish-prickling method. Based on the principle of project quality management, this paper puts forward the control scheme and relevant safeguard measures for the equipment quality problems found. In terms of specific research methods, this paper starts with the existing quality problems, makes statistics and analyses the existing problems. According to the basic principle of quality control, the whole process is divided into three stages: before construction, In the process of construction and in the later stage of construction, a statistical table of project quality problems is formed, and the existing quality problems are displayed and analyzed by means of data, and then the five main causes of the existing problems of the project are used, that is, "people, machines, materials, methods," Ring "inductive analysis of the causes of quality problems; third, according to the actual analysis of the results of the quality control program; finally, according to the whole staff, the whole process, the whole enterprise's" three complete "management, Put forward quality assurance measures for quality control scheme. In the aspect of research methods, this paper synthetically uses investigation method, statistical analysis method, file retrieval method, fish prickly map method to collect relevant information and data of existing quality problems, and make quantitative statistics and collation of the results. The method of combining history and empirical analysis is used to systematically analyze the internal and external conditions of the project and the present situation and problems of quality management, and the project quality control scheme is put forward by combining quantitative analysis with empirical analysis. Adopting the method of combining the standard and qualitative analysis, this paper puts forward the relevant safeguard measures to implement the project quality control scheme.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TU712.3

【相似文獻】

相關(guān)期刊論文 前3條

1 李文龍;王翠花;;探討建筑工程施工中洞口質(zhì)量控制方案[J];科技傳播;2010年23期

2 師彪;;大型俱樂部中央空調(diào)安裝質(zhì)量控制方案探析[J];信息通信;2012年04期

3 王博;張鵬;王忠明;李雪源;;雙源CT質(zhì)量控制方案技術(shù)初步研究[J];醫(yī)療衛(wèi)生裝備;2014年01期

相關(guān)會議論文 前2條

1 楊麗;趙秀萍;;CTP印版的質(zhì)量控制方案[A];2008印刷版材發(fā)展技術(shù)論壇論文集[C];2008年

2 王云峰;韓月琪;馬剛;劉輝;王雨順;;AIRS資料的QC方案對颶風(fēng)路徑的影響試驗[A];創(chuàng)新驅(qū)動發(fā)展 提高氣象災(zāi)害防御能力——S4衛(wèi)星資料在中小尺度天氣分析中的應(yīng)用[C];2013年

相關(guān)碩士學(xué)位論文 前1條

1 王東平;日喀則地區(qū)駕駛?cè)丝荚囍行慕ㄔO(shè)項目的質(zhì)量控制研究[D];吉林大學(xué);2017年

,

本文編號:1783399

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jianzhugongchenglunwen/1783399.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶68f48***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com