BIM技術(shù)在施工成本控制中的應(yīng)用分析
本文選題:成本控制 切入點(diǎn):BIM技術(shù) 出處:《廣州大學(xué)》2017年碩士論文
【摘要】:建設(shè)工程項(xiàng)目管理的三大主要任務(wù)是費(fèi)用目標(biāo)、進(jìn)度目標(biāo)、質(zhì)量目標(biāo)。其中建設(shè)工程施工階段的成本控制是重中之重,而我國當(dāng)前施工成本管理存在效率低下,精細(xì)化、智能化和信息化管理不完善的問題。工程施工階段的工程信息種類繁多、數(shù)據(jù)龐雜,而Building Information Modeling(BIM)技術(shù)是對(duì)當(dāng)下施工過程中施工數(shù)據(jù)管理和施工成本控制的一種比較好的解決方案。BIM技術(shù)即CAD技術(shù)之后在建筑行業(yè)的第二次革命——如果說CAD技術(shù)徹底改變了建筑設(shè)計(jì)和施工人為手繪的歷史,將人類帶入了精準(zhǔn)制圖,精準(zhǔn)施工的時(shí)代;那么BIM技術(shù)就是改變了傳統(tǒng)的非智能化施工數(shù)據(jù)管理模式——對(duì)于施工過程中的施工數(shù)據(jù)管理和施工成本控制有著重要的意義。隨著BIM技術(shù)的高速發(fā)展和政府的大力推廣,BIM在建筑行業(yè)的認(rèn)可度及推崇度越來越高,各企業(yè)、機(jī)構(gòu)需抓住機(jī)遇,直面挑戰(zhàn),不斷完善和提高自身以適應(yīng)建筑行業(yè)的大變革。本文通過閱讀大量相關(guān)的參考文獻(xiàn),分析前人的研究成果,結(jié)合本人實(shí)習(xí)期間參與相關(guān)項(xiàng)目的經(jīng)驗(yàn)。在分析建筑工程項(xiàng)目成本的控制方法以及當(dāng)前存在的問題的基礎(chǔ)上,對(duì)項(xiàng)目成本控制的基本理論進(jìn)行了研究;在明確成本概念的前提下,較深入地探究了掙值法的分析方法及其工作機(jī)理。引入基于IFC數(shù)據(jù)標(biāo)準(zhǔn)的BIM技術(shù),構(gòu)建了基于BIM技術(shù)、結(jié)合掙得值法的施工成本控制模型。此模型以BIM 5D模型為數(shù)據(jù)集成庫,結(jié)合掙值法為成本控制的監(jiān)測(cè)、預(yù)警和預(yù)測(cè)功能模塊提供數(shù)據(jù)支持。同時(shí)以某分部工程為例,直觀地分析此模型的工作流程,對(duì)該模型的合理性和可行性進(jìn)行驗(yàn)證。本文試分析了BIM技術(shù)在工程項(xiàng)目施工階段的成本控制方法,加強(qiáng)了BM技術(shù)與工程項(xiàng)目成本控制方法的結(jié)合。建設(shè)工程項(xiàng)目信息的BIM 5D模型的構(gòu)建,為項(xiàng)目的各參與方所使用,實(shí)現(xiàn)工程信息的交流、共享,為促進(jìn)我國建筑行業(yè)大力發(fā)展數(shù)字信息化、制度化及標(biāo)準(zhǔn)化的成本控制提供參考。
[Abstract]:The three main tasks of construction project management are cost target, progress target and quality target. The cost control in construction stage is the most important, but the current construction cost management in our country is inefficient and meticulous. The problems of intelligence and information management are not perfect. There are many kinds of engineering information in the construction stage, and the data are numerous and complicated. And Building Information modeling is a better solution to the current construction data management and construction cost control. BIM technology is the second revolution in the construction industry after the CAD technology-if the CAD technology is completely changed. The history of hand-drawn architectural design and construction, It brings us into the era of precision drawing and precision construction. Then BIM technology has changed the traditional mode of non-intelligent construction data management, which is of great significance to the construction data management and construction cost control in the construction process. With the rapid development of BIM technology and the large government. BIM is becoming more and more recognized and respected in the construction industry. Enterprises and institutions need to seize the opportunity, face up to the challenges, constantly improve and improve themselves to adapt to the great changes in the construction industry. Based on the experience of participating in relevant projects during my internship, this paper studies the basic theory of project cost control on the basis of analyzing the cost control methods of construction projects and the existing problems. On the premise of defining the concept of cost, this paper probes into the analysis method and working mechanism of earned value method, introduces BIM technology based on IFC data standard, and constructs the technology based on BIM. This model takes BIM 5D model as data integration library, combined with earned value method to provide data support for monitoring, warning and forecasting function modules of cost control. At the same time, a partial project is taken as an example. The workflow of the model is analyzed intuitively, and the rationality and feasibility of the model are verified. This paper tries to analyze the cost control method of BIM technology in the construction phase of engineering project. The combination of BM technology and project cost control method is strengthened. The construction of BIM 5D model of construction project information is used by the participants of the project to realize the exchange and sharing of engineering information. To promote the construction industry to develop digital information, institutionalization and standardization of cost control to provide a reference.
【學(xué)位授予單位】:廣州大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TU723.3;TU17
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 許炳;朱海龍;;工程項(xiàng)目施工階段成本控制模式改進(jìn)研究[J];建筑經(jīng)濟(jì);2016年01期
2 何關(guān)培;;施工企業(yè)BIM應(yīng)用技術(shù)路線分析[J];工程管理學(xué)報(bào);2014年02期
3 楊德磊;;國外BIM應(yīng)用現(xiàn)狀綜述[J];土木建筑工程信息技術(shù);2013年06期
4 李靜;方后春;羅春賀;;基于BIM的全過程造價(jià)管理研究[J];建筑經(jīng)濟(jì);2012年09期
5 桑培東;肖立周;李春燕;;BIM在設(shè)計(jì)-施工一體化中的應(yīng)用[J];施工技術(shù);2012年16期
6 王勇;張建平;胡振中;;建筑施工IFC數(shù)據(jù)描述標(biāo)準(zhǔn)的研究[J];土木建筑工程信息技術(shù);2011年04期
7 劉照球;李云貴;呂西林;張漢義;;基于BIM建筑結(jié)構(gòu)設(shè)計(jì)模型集成框架應(yīng)用開發(fā)[J];同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版);2010年07期
8 清華大學(xué)軟件學(xué)院BIM課題組;;中國建筑信息模型標(biāo)準(zhǔn)框架研究[J];土木建筑工程信息技術(shù);2010年02期
9 王廣斌;任文斌;羅廣亮;;建設(shè)工程項(xiàng)目前期策劃新視角——BIM/DSS[J];建筑科學(xué);2010年05期
10 何關(guān)培;;BIM在建筑業(yè)的位置、評(píng)價(jià)體系及可能應(yīng)用[J];土木建筑工程信息技術(shù);2010年01期
相關(guān)博士學(xué)位論文 前1條
1 長青;工程建設(shè)項(xiàng)目成本—進(jìn)度掙值方法的改進(jìn)與應(yīng)用研究[D];天津大學(xué);2007年
相關(guān)碩士學(xué)位論文 前6條
1 劉明;BIM技術(shù)在建筑工程施工質(zhì)量控制中的應(yīng)用研究[D];蘭州交通大學(xué);2016年
2 李強(qiáng);基于BIM技術(shù)全壽命周期成本控制研究[D];武漢工程大學(xué);2015年
3 李春霞;基于BIM與IFC的N維模型研究[D];華中科技大學(xué);2009年
4 婁U,
本文編號(hào):1657134
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/1657134.html