滬昆客專12標(biāo)段工程施工組織與過程管理研究
[Abstract]:China is forming a national high-speed railway network, Shanghai-Kunming passenger College has passed through six provincial capitals, it is an important high-speed artery connecting the east, the middle and the west. The No. 12 section of Shanghai-Kunming passenger College is mainly located in Panxian County, Guizhou Province. The geological situation of this section is complex, so it is necessary to carry out the research on the management of the construction process. Construction organization design is an important technical document for guiding and organizing construction. It is also a program for carrying out supervision and inspection and directing production construction. It is also of great significance for quality assurance and time limit assurance. In this paper, the theory of railway construction project management is reviewed firstly, which provides a theoretical basis for the construction management of the 12-tendered section of Hukun passenger College developed in this paper. On this basis, this paper discusses the actual situation of the 12 bid section of Hukun passenger College, designs the characteristics of the project and determines the construction organization structure according to the actual situation of the 12 bid section of the Shanghai-Kunming passenger College, and discusses in detail the deployment of the team and the division of the tasks. Then the key management content of Shanghai-Kunming 12 section project is analyzed and specific management measures are formulated to ensure the smooth development of the project and to achieve the established goal. And the process management of the spoiled is analyzed in detail. Finally, the detailed analysis and formulation of the Shanghai-Kunming passenger College 12 construction management measures. According to the quality management, safety management, time limit control management and summer rainy season construction management, the corresponding measures are formulated to ensure the smooth development of the project. And set up the relevant early warning mechanism. The research in this paper provides specific guidance measures for the construction of the 12th section of Shanghai-Kunming passenger College, and also provides relevant reference experience for the construction of passenger railway in this area and under the same geological conditions.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:U215.1
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 郭峰;李體存;;鐵路建設(shè)項(xiàng)目管理中的利益沖突與協(xié)調(diào)管理研究[J];鐵道科學(xué)與工程學(xué)報(bào);2008年06期
2 曹小琳,韓冰;工程項(xiàng)目管理目標(biāo)系統(tǒng)的建立與控制[J];重慶大學(xué)學(xué)報(bào)(自然科學(xué)版);2002年07期
3 方圓;;我國公路工程、鐵路工程及市政工程項(xiàng)目管理模式的對比分析[J];廣東交通職業(yè)技術(shù)學(xué)院學(xué)報(bào);2011年02期
4 馬光遠(yuǎn);;談工程項(xiàng)目管理模式的應(yīng)用[J];改革與開放;2010年24期
5 楊丁穎;黃建陵;;鐵路工程項(xiàng)目管理體系框架模型研究[J];科技進(jìn)步與對策;2011年13期
6 陸永堅(jiān);;工程項(xiàng)目管理模式發(fā)展探討[J];科技信息(科學(xué)教研);2007年36期
7 李靜;;就加強(qiáng)鐵路橋梁施工項(xiàng)目管理的措施分析[J];科技與企業(yè);2014年08期
8 周春清;周志東;;建立高效精干的工程指揮部,規(guī)范項(xiàng)目管理——青藏鐵路19標(biāo)段工程管理模式的探討[J];四川水力發(fā)電;2005年S1期
9 嚴(yán)建淵,李林茂,毛存林;項(xiàng)目管理的基本理論與方法的應(yīng)用研究[J];鐵路計(jì)算機(jī)應(yīng)用;2002年01期
10 安國棟;;中國高速鐵路建設(shè)項(xiàng)目管理[J];中國鐵路;2010年12期
,本文編號:2472782
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2472782.html