量化項(xiàng)目管理方法及其在核電站建造中的應(yīng)用
發(fā)布時(shí)間:2019-04-10 14:50
【摘要】:提出了我國核電站建造量化項(xiàng)目管理的概念,并著重介紹了量化項(xiàng)目管理的量化方法及實(shí)現(xiàn)過程。在此基礎(chǔ)上,又給出了核電站建造量化項(xiàng)目管理的簡(jiǎn)單實(shí)例。最后,展望了我國核電建設(shè)中量化管理方法的應(yīng)用前景。
[Abstract]:The concept of quantitative project management for nuclear power plant construction in China is put forward, and the quantization method and realization process of quantitative project management are emphatically introduced. On this basis, a simple example of quantitative project management for nuclear power plant construction is given. Finally, the application prospect of quantitative management method in nuclear power construction in China is prospected.
【作者單位】: 清華大學(xué)核能技術(shù)設(shè)計(jì)研究院 廣東嶺澳核電有限公司
【分類號(hào)】:TM623
本文編號(hào):2455896
[Abstract]:The concept of quantitative project management for nuclear power plant construction in China is put forward, and the quantization method and realization process of quantitative project management are emphatically introduced. On this basis, a simple example of quantitative project management for nuclear power plant construction is given. Finally, the application prospect of quantitative management method in nuclear power construction in China is prospected.
【作者單位】: 清華大學(xué)核能技術(shù)設(shè)計(jì)研究院 廣東嶺澳核電有限公司
【分類號(hào)】:TM623
【相似文獻(xiàn)】
相關(guān)期刊論文 前1條
1 朱巖,徐元輝,鄒來龍;量化項(xiàng)目管理方法及其在核電站建造中的應(yīng)用[J];核動(dòng)力工程;1999年01期
,本文編號(hào):2455896
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2455896.html
最近更新
教材專著