高等院校世行貸款項目管理中存在的問題不容忽視
[Abstract]:First, the construction of the project has not strictly complied with the procedures of capital construction. For example, for a university's World Bank loan project-the scientific research building, the feasibility study report approved by the State Planning Commission is 5500 square meters in size and 5 million yuan in investment in construction, and the school adjusts its own construction scale to 6800 square meters according to its own needs. Total investment of 8.5 million yuan, and the actual construction scale of 7800 square meters, complete investment of 11 million yuan. Second, the arrangement of local matching funds is slow, the rate of capital arrival is low, and the progress of the project is slow. Fo
【作者單位】: 鄭州特派辦 鄭州特派辦
【分類號】:F239.22
【相似文獻】
相關(guān)期刊論文 前10條
1 ;第五講 貸款項目管理[J];投資研究;1986年09期
2 ;更改貸款項目管理的幾點做法和體會[J];投資研究;1986年S2期
3 ;加強貸款項目管理 提高投資效益[J];中國金融;1986年08期
4 張國瑾;改革技改貸款項目管理的幾點意見[J];武漢金融;1988年06期
5 方綱;技術(shù)改造貸款項目管理責(zé)任制初探[J];中國城市金融;1989年02期
6 張純德;加強基層行處技改信貸管理之我見[J];中國城市金融;1989年12期
7 張敏生;;開展技改項目“三算”審查 提高貸款投資效益[J];金融與經(jīng)濟;1989年04期
8 金波;;項目評估中的八大問題及解決途徑[J];現(xiàn)代金融;1989年07期
9 陳榕;要加強專項貸款管理[J];福建金融;1990年06期
10 陳石興,劉登興;調(diào)整信貸力度 增強應(yīng)變能力[J];福建金融;1990年10期
相關(guān)重要報紙文章 前10條
1 國家開發(fā)銀行昆明分行 馬欣 趙銓;構(gòu)筑投資銀行業(yè)務(wù)體系[N];中國信息報;2001年
2 記者 嚴小娟;在我區(qū)建立高效流域管理組織[N];新疆日報(漢);2004年
3 ;富陽市積極探索政府負債管理[N];中國審計報;2005年
4 魏鑫;發(fā)揮金融職能作用 促農(nóng)村經(jīng)濟發(fā)展[N];安徽經(jīng)濟報;2006年
5 王振湖 辛宏彪;咸安區(qū)強化世行貸款項目管理[N];中國審計報;2006年
6 本報記者 費楊生 申屠青南;外國政府貸款項目管理有新規(guī)[N];中國證券報;2006年
7 本報記者 王靜琳 孫太e,
本文編號:2455726
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2455726.html