隆泰運(yùn)煤鐵路專用線項(xiàng)目投資分析與控制研究
[Abstract]:Special railway is an important part of railway network in China. As a basic production unit of railway freight transport organization, it plays an active role in promoting the development of freight transportation in the surrounding areas along the railway line. Different from the long trunk railway of the national capital construction, the capital source of the special railway is generally self-financing by the large and medium enterprises, and the investment control in the construction process is easy to be ignored. The investment of the railway construction project is high, and the effective control of the investment is an important part of the project management. The project has a long route, wide area, long construction period, from construction planning, design, implementation to completion, there are a variety of risk problems, the use of scientific management methods reasonable prevention and transfer of risks, It is a necessary factor for the smooth construction and implementation of the project. It is necessary to analyze the factors of this project in order to achieve the purpose of reasonable investment control. This paper takes the special railway line project of Longtai Coal Transport Railway, which is located at the junction of Shanxi, Shaanxi and Inner Mongolia, as the research goal. Firstly, according to the demand of the project and the transportation condition of the surrounding railway, the necessity of the construction of the project is analyzed. Then the whole process of the project is analyzed and studied from the aspects of the main technical standard, the route scheme and the operation mode after the completion of the project. According to the investment estimation and expected income of the project, the financial evaluation and national economic evaluation of the project are carried out, and the feasibility of the construction of the project is verified. Finally, according to the theory of project cost management, the common problems in investment control are analyzed, and the corresponding control measures are put forward. Based on the knowledge of construction project risk management, this paper analyzes the possible problems of each risk element, and puts forward the prevention and countermeasures of risk from the point of view of implementation. The study of investment control and risk control of Longtai coal transport line is more valuable than that of other small private railway lines. The research results of this paper have some reference significance for similar railway construction projects.
【學(xué)位授予單位】:哈爾濱理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:U215.1
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 季文;項(xiàng)目成功的12個關(guān)鍵原則[J];技術(shù)與市場.園林工程;2004年06期
2 梁松波;項(xiàng)目管理專業(yè)基礎(chǔ)概述[J];上海標(biāo)準(zhǔn)化;2005年10期
3 張海東;;“法人管項(xiàng)目”下的人資管理[J];施工企業(yè)管理;2012年05期
4 徐亮輝;;汽車零部件企業(yè)的項(xiàng)目管理成熟度模型研究[J];上海汽車;2012年12期
5 和宏明;論西方項(xiàng)目范疇[J];基建優(yōu)化;1998年03期
6 賽云秀;;項(xiàng)目三大目標(biāo)相互作用分析[J];建筑經(jīng)濟(jì);2008年08期
7 利鎮(zhèn)有;何繼善;;項(xiàng)目業(yè)績系統(tǒng)評價模型及其改良研究[J];中國工程科學(xué);2011年08期
8 盧錫雷;;“法人管項(xiàng)目”利弊何在[J];施工企業(yè)管理;2012年05期
9 許心華,崔婷;前進(jìn)中的中德合作山東糧援項(xiàng)目[J];山東水利科技;1998年03期
10 秦剛;;成功的項(xiàng)目管理事業(yè)[J];江西建材;2014年07期
相關(guān)會議論文 前10條
1 ;征集項(xiàng)目一覽表[A];2010’第五屆綠色財富(中國)論壇會刊[C];2010年
2 趙彬;焦書長;;“三次會議”制度推進(jìn)項(xiàng)目穩(wěn)步持續(xù)發(fā)展[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2010)[C];2010年
3 劉中平;周甄;李亞玲;馬韜;;項(xiàng)目團(tuán)隊(duì)組織、分工與工作模式[A];2013年中國航空學(xué)會管理科學(xué)分會學(xué)術(shù)會議論文集[C];2013年
4 陳登慧;郭紅梅;;水土保持執(zhí)法項(xiàng)目目標(biāo)競爭崗位責(zé)任制的形成與效益分析[A];水土保持監(jiān)督管理論文選編[C];2003年
5 馮亮;;用項(xiàng)目管理模式開展ICT外包服務(wù)項(xiàng)目[A];海南省通信學(xué)會學(xué)術(shù)年會論文集(2006)[C];2006年
6 盛漢濱;樊軍;王紀(jì)泉;;杭甬高速公路項(xiàng)目目標(biāo)可持續(xù)發(fā)展評價[A];第一屆全國公路科技創(chuàng)新高層論壇論文集環(huán)保與可持續(xù)發(fā)展卷[C];2002年
7 紀(jì)存興;;項(xiàng)目管理在原子能院核電項(xiàng)目中的應(yīng)用研究[A];中國核科學(xué)技術(shù)進(jìn)展報告(第二卷)——中國核學(xué)會2011年學(xué)術(shù)年會論文集第10冊(核情報(含計算機(jī)技術(shù))分卷、核技術(shù)經(jīng)濟(jì)與管理現(xiàn)代化分卷)[C];2011年
8 楊來成;唐慧中;;改革管理機(jī)制 搞好藉河項(xiàng)目建設(shè)[A];中國水土保持探索與實(shí)踐——小流域可持續(xù)發(fā)展研討會論文集[C];2005年
9 王作功;賈元華;李素芬;;高速公路項(xiàng)目目標(biāo)持續(xù)性評價指標(biāo)體系及方法研究[A];可持續(xù)發(fā)展的中國交通——2005全國博士生學(xué)術(shù)論壇(交通運(yùn)輸工程學(xué)科)論文集(上冊)[C];2005年
10 袁偉峰;;基于WBS的項(xiàng)目掙值分析及其應(yīng)用[A];2011年中國航空學(xué)會管理科學(xué)分會學(xué)術(shù)交流會議論文集[C];2011年
相關(guān)重要報紙文章 前10條
1 崔晶煒;如何確定項(xiàng)目目標(biāo)?[N];中國計算機(jī)報;2004年
2 記者 莊啟e,
本文編號:2379423
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2379423.html