新疆哈密地區(qū)風(fēng)電項目管理研究
[Abstract]:With the increasingly serious environmental and energy problems, especially in recent years, the frequency of haze weather has been increasing, replacing organic fossil energy with clean environmental protection and renewable energy, and increasing the proportion of clean environmental protection and renewable energy. Is the current energy industry in China's development ideas. Wind power resources in China have great potential for development, and with the rapid development of industrialization, the demand for wind power resources is becoming more and more intense, and the current wind power project management mode restricts the rapid development of wind power industry. Therefore, it is urgent to carry out systematic research on wind power project management in China, summarize advanced project management methods and improve the level of wind power project management in China. This article takes Hami area wind power project as the research object, unifies the actual case, from to the project management present situation analysis, based on the project management process survey design, the construction, the installation, the acceptance, the operation and so on several stages, Focusing on the problems in the aspects of construction quality, construction safety, schedule planning, risk control and talent management in the process of project management, this paper deepens the analysis of the subjective and objective causes of related problems, and probes into the measures and improvement schemes of wind power project management and control. Based on the research principles of adapting to local conditions and seeking truth from facts, combined with the research methods of combining theory with practice, this paper aims at the problems of wind power project management in Hami area on the basis of the advanced management experience at home and abroad. From the point of view of realizing scientific, standardized, fine and dynamic project management, this paper puts forward some countermeasures and improvement schemes. Finally, by analyzing the effect of improved wind power project management and control in Hami area, Xinjiang, the comprehensive evaluation is carried out from many aspects, such as economic benefit, social benefit, construction quality, construction safety and demonstration effect brought by wind power industry in Xinjiang. Explain the effect of the improvement of the integrated control of the project. The purpose of this paper is to guide the technical activities in the process of wind power project management through the management theory and method of wind power project management, and to provide some theoretical research materials for improving the management level of wind power project in China.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F426.61;TU71
【參考文獻】
相關(guān)期刊論文 前10條
1 韋彬;;基于關(guān)鍵線路法的項目進度管理與控制研究[J];財經(jīng)問題研究;2014年S2期
2 呂艷偉;孫紅麗;;電力企業(yè)人力資源管理的現(xiàn)狀及解決對策分析[J];企業(yè)研究;2014年08期
3 喬宏江;;電力企業(yè)人力資源開發(fā)與管理的戰(zhàn)略意義[J];經(jīng)營管理者;2014年04期
4 梁小瑩;;電力企業(yè)人力資源管理問題及對策探析[J];科學(xué)之友;2013年11期
5 王淼;蘇萌;任遠;;關(guān)于風(fēng)電場項目工程驗收探討[J];工程質(zhì)量;2013年02期
6 張紹君;;施工企業(yè)項目管理組織機構(gòu)形式的發(fā)展分析[J];科技與企業(yè);2012年21期
7 陳勇強;顧偉;;工程項目風(fēng)險管理研究綜述[J];科技進步與對策;2012年18期
8 陳雯;;我國風(fēng)力發(fā)電的現(xiàn)狀與展望[J];應(yīng)用能源技術(shù);2010年08期
9 高陽;;風(fēng)電工程施工組織管理[J];黑龍江科技信息;2010年05期
10 李文清;鐘成;;風(fēng)電開發(fā)中存在問題的探討[J];浙江電力;2010年01期
相關(guān)碩士學(xué)位論文 前4條
1 丁曉峰;風(fēng)電項目決策影響因素及經(jīng)濟評價分析[D];華北電力大學(xué);2012年
2 楊柳;基于集成管理的建設(shè)項目成本控制的應(yīng)用研究[D];武漢理工大學(xué);2011年
3 蔡茜;中國風(fēng)力發(fā)電產(chǎn)業(yè)的技術(shù)創(chuàng)新戰(zhàn)略研究[D];華中科技大學(xué);2008年
4 丁芹;中國200MW風(fēng)能項目的開發(fā)與實施[D];華中科技大學(xué);2005年
,本文編號:2362854
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2362854.html