市政燃?xì)夤こ添?xiàng)目進(jìn)度管理研究
[Abstract]:With the rapid development of China's economy, the environmental deterioration is becoming more and more serious. In 2012, the Ministry of Environmental Protection brought the PM2.5 standard into the "Environmental Air quality Standard", forcing local government departments to put environmental protection issues on the agenda. As a high-calorific environmental energy, natural gas is widely used by local governments. The construction of gas pipeline project has also entered the construction period in full swing. However, the construction management of urban gas engineering is still in the way of headquarters, which can not effectively control the progress of municipal gas pipeline construction. Municipal gas pipeline project schedule control has been puzzling the gas operating units and construction units. The reasonable and effective control and management of the progress of the gas engineering project is conducive to giving full play to the input-output ratio of the investors as soon as possible, to the good maintenance of the economic order and to the improvement of the benefit of the enterprise. By analyzing the progress control of municipal natural gas pipeline construction in an industrial park, this paper provides a template for finding out the main reasons that affect the progress of the project. In the process of project construction, the urban gas operation unit can find out the main factors that affect the progress of the project and take effective measures in time. For people to further understand the gas project schedule management and other related knowledge, project managers can effectively control the progress of municipal gas pipeline construction has a great reference value and guiding significance. This paper takes the municipal natural gas pipeline project of a certain industrial park as the research object, adopts the WBS project decomposition method, carries on the layer by layer decomposition to the municipal gas pipeline project construction project, decomposes the project into the construction drawing design, the material equipment purchase, The 19 steps of project construction, acceptance and so on. The Gantt chart of construction schedule is compiled with MICROSOFT PROJECT software for each subproject, and the schedule of each construction section or construction procedure is planned in detail. According to the factors existing in the construction process of municipal gas pipeline engineering, the factors affecting the construction progress are found out according to the Gantt diagram of the schedule plan. The number of factors affecting construction progress is counted, six main factors affecting the progress of municipal gas pipeline project are determined by ABC classification, and the key factors influencing construction progress are analyzed in combination with actual projects. From the aspects of project schedule management control procedure, project planning implementation, active participation in design, communication and coordination management with relevant parties, the best solution for each factor is obtained. It provides an optimal model for the construction progress control of municipal gas pipeline engineering. Through the effective control of the progress of the municipal gas pipeline project, the management of the project can be realized in all directions and the whole process can be controlled, so that all the objectives of the construction project can be achieved smoothly, the construction period is optimal, and the cost can be saved. Improve efficiency and enhance the competitiveness of enterprises.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TU996;TU722
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 梁禮方;;項(xiàng)目進(jìn)度管理(下)[J];金融科技時(shí)代;2013年10期
2 劉耕,王學(xué)軍;國(guó)內(nèi)外項(xiàng)目進(jìn)度管理的比較及建議[J];重慶交通學(xué)院學(xué)報(bào);2003年S1期
3 章勇武,尤建新,黃力 ,馬國(guó)豐;高速公路項(xiàng)目進(jìn)度管理信息系統(tǒng)設(shè)計(jì)研究[J];上海管理科學(xué);2005年05期
4 田豐春;;項(xiàng)目進(jìn)度管理研究[J];中國(guó)科技信息;2008年14期
5 聶淑萍;高建民;;項(xiàng)目進(jìn)度管理在國(guó)防科研項(xiàng)目管理中的應(yīng)用探析[J];國(guó)防技術(shù)基礎(chǔ);2008年07期
6 劉曉東;;基于知識(shí)管理的工程項(xiàng)目進(jìn)度管理持續(xù)改進(jìn)研究[J];建筑經(jīng)濟(jì);2009年05期
7 林進(jìn)峰;;工程項(xiàng)目進(jìn)度管理[J];廣東建材;2009年11期
8 楊紅霞;;項(xiàng)目進(jìn)度管理方法研究[J];山西建筑;2010年29期
9 杜建峰;江文杰;;項(xiàng)目進(jìn)度管理在公路施工建設(shè)中的意義及應(yīng)用[J];中國(guó)新技術(shù)新產(chǎn)品;2010年21期
10 楊振鵬;;工程項(xiàng)目進(jìn)度管理相關(guān)問(wèn)題探討[J];東北水利水電;2011年12期
相關(guān)會(huì)議論文 前3條
1 楊正茂;;維生素C質(zhì)量升級(jí)項(xiàng)目進(jìn)度管理研究[A];第十屆沈陽(yáng)科學(xué)學(xué)術(shù)年會(huì)論文集(農(nóng)業(yè)科學(xué)與醫(yī)藥科學(xué)分冊(cè))[C];2013年
2 高華北;張花玲;周湘暉;黃曦;丁霞;王麗;鄢旭輝;嚴(yán)國(guó)興;;甘特圖在職業(yè)病危害評(píng)價(jià)項(xiàng)目進(jìn)度管理中的應(yīng)用[A];湖南省預(yù)防醫(yī)學(xué)會(huì)勞動(dòng)衛(wèi)生專業(yè)委員會(huì)2008年學(xué)術(shù)交流會(huì)議論文集[C];2008年
3 孫慧;王麗華;;多層次模糊控制在工程項(xiàng)目進(jìn)度管理中的應(yīng)用[A];2005年中國(guó)機(jī)械工程學(xué)會(huì)年會(huì)論文集[C];2005年
相關(guān)重要報(bào)紙文章 前7條
1 彭潔;昆明辦審計(jì)項(xiàng)目進(jìn)度管理實(shí)現(xiàn)規(guī)范化[N];中國(guó)審計(jì)報(bào);2013年
2 ;遼寧審計(jì)廳出臺(tái)審計(jì)項(xiàng)目進(jìn)度管理辦法[N];財(cái)會(huì)信報(bào);2010年
3 曹忻;云南省審計(jì)廳實(shí)行項(xiàng)目進(jìn)度管理[N];中國(guó)審計(jì)報(bào);2010年
4 項(xiàng)榮;深圳辦加強(qiáng)審計(jì)項(xiàng)目進(jìn)度管理[N];中國(guó)審計(jì)報(bào);2012年
5 小城;遼寧出臺(tái)審計(jì)項(xiàng)目進(jìn)度管理辦法[N];中國(guó)稅務(wù)報(bào);2010年
6 記者 李穎;增強(qiáng)藏區(qū)自我造血能力 助推藏區(qū)跨越發(fā)展[N];成都日?qǐng)?bào);2014年
7 通訊員 劉永良;雙永高速永定段完成投資15億元[N];閩西日?qǐng)?bào);2010年
相關(guān)博士學(xué)位論文 前2條
1 魏從剛;網(wǎng)絡(luò)化協(xié)同制造項(xiàng)目進(jìn)度管理技術(shù)研究[D];西北工業(yè)大學(xué);2006年
2 張敏;項(xiàng)目進(jìn)度管理的行為不確定性及其控制策略研究[D];華中科技大學(xué);2011年
,本文編號(hào):2339740
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2339740.html