X研究所軟件測評(píng)中心MIS系統(tǒng)設(shè)計(jì)
[Abstract]:Software testing is a hot topic in the field of software engineering in recent years, and the organization and management of software testing at all levels is also a hot research issue in software enterprise management in recent years. The author first describes the development of software testing industry and MIS system, and analyzes the role of MIS system in enterprise management. Then, aiming at x software evaluation center, the author analyzes the function of software evaluation center as an organization in the process of software development, and describes the main work flow of software evaluation center in practice Combined with the practice of the work, the paper draws out the management problems in the process of operation and management: 1) the waste of human resources in the testing process 2) the high communication cost 3) the complexity of personal workload statistics these problems have certain universality. It is not a problem unique to x, but a common problem in the industry. Therefore, the author's research content can not only improve the management level of the software evaluation center of 脳 Institute, but also have great help to the software quality improvement of the 脳 Institute, and the research results are also very instructive and referential to other enterprises in the current software industry. Using MIS system to optimize the management of software evaluation center needs to solve the design problem of MIS system. At present, there are some problems in the design of information management system, such as insufficient understanding, insufficient design work, etc. In recent years, UML is a kind of fine modeling technology, which is widely used in the field of computer. It uses the form of graphics to accurately describe the various departments of the target system. Based on the idea of fine management and the method of UML modeling, this paper analyzes the existing management mode and process, and puts forward the concrete analysis method of how the new system should embed the existing process. By using the method of model optimization, the design requirements of MIS system are deduced, and the functional design model of the management information system is derived. Through the analysis of the existing management methods, the author puts forward the method of using Gantt chart for project management and the method of automatically processing project data by using data to improve the existing management efficiency. The two methods are integrated into the design of MIS system. After that, the hardware and software design requirements and the approximate design framework of the system are analyzed. Finally, the author summarizes the research, analyzes the main innovation points and breakthrough points, and analyzes the shortcomings and future efforts.
【學(xué)位授予單位】:鄭州大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TP311.53
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳文海,秦曉;軟件測試管理的網(wǎng)絡(luò)解決方案[J];計(jì)算機(jī)工程與應(yīng)用;2003年10期
2 葉言苓,崔彥軍;軟件測試管理的研究與應(yīng)用[J];計(jì)算機(jī)應(yīng)用與軟件;2003年09期
3 aken;;軟件測試管理的自動(dòng)化[J];程序員;2005年03期
4 王立娟;;基于過程的軟件測試管理系統(tǒng)的研究與應(yīng)用[J];電腦知識(shí)與技術(shù);2008年22期
5 王可平;陳陽;柳園園;;軟件測試管理自動(dòng)化解決方案與實(shí)踐[J];指揮信息系統(tǒng)與技術(shù);2010年04期
6 梁禮方;;軟件測試管理(上)[J];金融科技時(shí)代;2013年11期
7 孫志恒;運(yùn)用面向?qū)ο蟮姆椒ǚ治鲕浖䴗y試管理流程[J];北京機(jī)械工業(yè)學(xué)院學(xué)報(bào);2002年04期
8 王用杰,楊紅雨,王玲,梁波;實(shí)時(shí)軟件測試管理的設(shè)計(jì)與實(shí)踐[J];中國民航飛行學(xué)院學(xué)報(bào);2005年01期
9 李曉麗;;軟件測試管理初探[J];湖北函授大學(xué)學(xué)報(bào);2007年04期
10 黨杰;;軟件測試管理及其工程應(yīng)用[J];硅谷;2011年10期
相關(guān)會(huì)議論文 前2條
1 王用杰;楊紅雨;韓學(xué)為;曾俊;;軟件測試管理的設(shè)計(jì)與實(shí)踐[A];中國自動(dòng)化學(xué)會(huì)、中國儀器儀表學(xué)會(huì)2004年西南三省一市自動(dòng)化與儀器儀表學(xué)術(shù)年會(huì)論文集[C];2004年
2 李玉芬;;Quality Center在軟件測試管理中的應(yīng)用[A];創(chuàng)新驅(qū)動(dòng),,加快戰(zhàn)略性新興產(chǎn)業(yè)發(fā)展——吉林省第七屆科學(xué)技術(shù)學(xué)術(shù)年會(huì)論文集(上)[C];2012年
相關(guān)重要報(bào)紙文章 前3條
1 李娜 韓麗;軟件領(lǐng)域演繹“硬”實(shí)力[N];中國航天報(bào);2011年
2 相春雷;軟件測試管理好助手[N];中國計(jì)算機(jī)報(bào);2002年
3 戴金龍;如何測試高可靠性軟件[N];計(jì)算機(jī)世界;2005年
相關(guān)碩士學(xué)位論文 前10條
1 黃曉琳;中小型軟件企業(yè)項(xiàng)目進(jìn)度管理系統(tǒng)研究與實(shí)現(xiàn)[D];電子科技大學(xué);2015年
2 趙星漢;X研究所軟件測評(píng)中心MIS系統(tǒng)設(shè)計(jì)[D];鄭州大學(xué);2015年
3 劉建國;軟件項(xiàng)目國際化和本地化的研究[D];華北電力大學(xué);2013年
4 高經(jīng)府;軟件測試管理系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];天津大學(xué);2007年
5 魯世雯;軟件工程項(xiàng)目中的軟件測試管理的研究與實(shí)踐[D];復(fù)旦大學(xué);2010年
6 趙楓;銀行軟件測試管理平臺(tái)的設(shè)計(jì)與實(shí)現(xiàn)[D];上海交通大學(xué);2012年
7 許文瑛;協(xié)同軟件測試管理模型及其平臺(tái)架構(gòu)的研究與應(yīng)用[D];北京工業(yè)大學(xué);2012年
8 唐天琪;軟件測試管理系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];華中科技大學(xué);2009年
9 王立娟;基于過程的軟件測試管理中關(guān)鍵技術(shù)的研究[D];大連海事大學(xué);2006年
10 張華龍;軟件測試管理支持系統(tǒng)研究與應(yīng)用[D];合肥工業(yè)大學(xué);2008年
本文編號(hào):2331190
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2331190.html