創(chuàng)芯公司集成電路廠房項(xiàng)目的質(zhì)量管理研究
[Abstract]:In recent years, with information technology increasingly related to national security and people's lives, the core integrated circuit industry, as the information technology industry, has been developed by leaps and bounds, and the state has also issued relevant industrial policies to support it. Integrated circuit plant project in all parts of the country have started. The importance of quality management in the process of project construction is determined by the characteristics of complex production process, various specialties, precise technical requirements, extensive application of new technology and new technology, and numerous participating units in the construction of integrated circuit plant. However, at present, the project quality management mode commonly used in the construction of integrated circuit factory buildings in China is still relatively old, and lack of application experience to the new advanced project management mode. Difficult to apply to the current integrated circuit plant project construction quality requirements. At the same time, some quality hidden troubles are exposed to the stage of production commissioning and running, which has a very bad effect on the smooth production and long-term operation of the project. Therefore, it is of great practical significance to study the quality management in the construction process of integrated circuit factory building and put forward some countermeasures. This paper takes the process quality management of the integrated circuit factory building of Chuangxin Company as an example. Firstly, through analyzing the present situation of the project quality management, it starts from the aspects of project organization mode, participating units quality management, implementing process quality control and so on. Analyze the quality management relationship among the project owners, management companies, design, EPC contractors, construction, supervision and external supervision agencies, etc., and apply relevant theoretical knowledge such as total quality management, quality management trilogy, etc. The problems in quality management system, project management system and responsibility, construction process quality control and so on are found out. Then, using the methods of correlation analysis and causality analysis to analyze the problems existing in the quality management of project construction, from the benefit game among the participating units, the influence of the external environment of the project on the construction quality, the internal management of the contracting unit. In the aspects of quality management in the process of project construction, the owner summed up the problems and shortcomings in the construction quality management of Chuangxin IC factory building project, and put forward the corresponding solutions and management countermeasures in view of these problems and deficiencies. This paper breaks through the current situation of integrated circuit factory building project construction quality management, which used to be based on separate management in stages, but according to the concept of total quality management, takes the whole process quality management of the existing project in the whole project construction cycle as the research object. A thorough and comprehensive analysis was carried out. This paper puts forward some management methods and countermeasures, such as clear project quality management goal, strengthening environmental management and prevention plan, perfecting project organization structure system and responsibility, strengthening owner's process quality control and quality effect incentive. It effectively guarantees the overall quality of the integrated circuit factory building project of Chuangchong Company, and provides reference and reference for the construction quality management of other similar projects.
【學(xué)位授予單位】:蘭州大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:TU712.3
【共引文獻(xiàn)】
相關(guān)博士學(xué)位論文 前10條
1 劉向東;基于利益相關(guān)者的土地整理項(xiàng)目共同治理模式研究[D];中國(guó)地質(zhì)大學(xué)(北京);2011年
2 劉興智;項(xiàng)目治理社會(huì)網(wǎng)絡(luò)風(fēng)險(xiǎn)分析方法研究[D];山東大學(xué);2011年
3 樓海軍;國(guó)際EPC水泥工程風(fēng)險(xiǎn)管理研究[D];武漢理工大學(xué);2011年
4 郭漢丁;建設(shè)工程質(zhì)量政府監(jiān)督管理研究[D];天津大學(xué);2003年
5 王乾坤;建設(shè)項(xiàng)目集成管理研究[D];武漢理工大學(xué);2006年
6 曹容寧;營(yíng)林項(xiàng)目風(fēng)險(xiǎn)評(píng)估、決策與防范體系研究[D];南京林業(yè)大學(xué);2007年
7 長(zhǎng)青;工程建設(shè)項(xiàng)目成本—進(jìn)度掙值方法的改進(jìn)與應(yīng)用研究[D];天津大學(xué);2007年
8 梁永寬;項(xiàng)目管理中的合同治理與關(guān)系治理[D];中山大學(xué);2008年
9 賀全龍;基于熵的建筑工程項(xiàng)目沖突事件互適性研究[D];天津大學(xué);2007年
10 楊建平;政府投資項(xiàng)目協(xié)同治理機(jī)制及其支撐平臺(tái)研究[D];中國(guó)礦業(yè)大學(xué);2009年
,本文編號(hào):2264173
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2264173.html