大亞灣核電站18個月?lián)Q料工程及其項目管理
發(fā)布時間:2018-09-04 15:26
【摘要】:介紹了大亞灣核電廠在實施18個月?lián)Q料改造中涉及到的各個方面,包括工程方案的確定、承包商的選定、項目的分解及實施情況、項目管理及風險控制方面的經(jīng)驗等等。并介紹了通過該項目成功實施技術引進,促進了長周期換料工程設計技術自主化和AFA 3G核燃料制造國產化。
[Abstract]:This paper introduces various aspects of Daya Bay Nuclear Power Plant in the course of 18 months remolding, including the determination of project plan, the selection of contractor, the decomposition and implementation of the project, the experience of project management and risk control, etc. The successful implementation of the technology through this project has promoted the automation of long cycle refueling engineering design and the localization of AFA 3G nuclear fuel manufacture.
【作者單位】: 廣東核電合營有限公司 中國核動力研究設計院 宜賓核燃料元件廠 廣東核電合營有限公司
【分類號】:TM623
[Abstract]:This paper introduces various aspects of Daya Bay Nuclear Power Plant in the course of 18 months remolding, including the determination of project plan, the selection of contractor, the decomposition and implementation of the project, the experience of project management and risk control, etc. The successful implementation of the technology through this project has promoted the automation of long cycle refueling engineering design and the localization of AFA 3G nuclear fuel manufacture.
【作者單位】: 廣東核電合營有限公司 中國核動力研究設計院 宜賓核燃料元件廠 廣東核電合營有限公司
【分類號】:TM623
【相似文獻】
相關期刊論文 前10條
1 沈抗;大亞灣核電站實施18個月?lián)Q料項目的可行性研究[J];核動力工程;2002年05期
2 崔懷明;大亞灣核電站18個月?lián)Q料對流體系統(tǒng)的影響分析和論證[J];核動力工程;2002年05期
3 黃文有,朱閩宏,廖業(yè)宏,劉力,王斐,李偉才,徐樹文,徐詠梅;大亞灣核電站18個月?lián)Q料的現(xiàn)場技術改造[J];核動力工程;2002年05期
4 章宗耀,傅先剛;大亞灣核電站18個月?lián)Q料設計論證[J];核動力工程;2002年05期
5 上官志洪,楊忠勤,楊洪潤,趙鋒;大亞灣核電站實施18個月?lián)Q料的放射性后果評估[J];核動力工程;2003年01期
6 張洪,李雷,李慶,梁薇,肖岷,傅先剛;大亞灣核電站18個月?lián)Q料燃料管理研究[J];核動力工程;2002年05期
7 張虹,劉昌文,蔣曉華,周洲,盧毅力;大亞灣核電站18個月?lián)Q料非失水事故分析[J];核動力工程;2002年05期
8 孫吉良,王榮忠;大亞灣核電站18個月?lián)Q料大破口失水事故的計算分析[J];核動力工程;2002年05期
9 廉志坤,芮e,
本文編號:2222579
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2222579.html
教材專著