P6項(xiàng)目管理平臺在大崗山水電站大壩工程中的應(yīng)用
發(fā)布時間:2018-08-13 20:15
【摘要】:基于大崗山水電站大壩工程的概況和管理模式,闡述了P6項(xiàng)目管理平臺的系統(tǒng)構(gòu)架及其在進(jìn)度管理、贏得值管理等方面的應(yīng)用情況,并對進(jìn)度計(jì)劃的分級管理、動態(tài)管理及實(shí)現(xiàn)贏得值曲線的方法、步驟及其他難點(diǎn)等問題進(jìn)行了分析。結(jié)果表明,基于P6項(xiàng)目管理平臺的多級進(jìn)度管理方法對水電站大壩施工進(jìn)度管理具有參考性和移植性;贏得值法實(shí)現(xiàn)了進(jìn)度與費(fèi)用控制的動態(tài)、綜合監(jiān)控,對提高項(xiàng)目效益和管理水平具有重要的應(yīng)用價(jià)值和推廣意義。
[Abstract]:Based on the general situation and management mode of dam project of Dagangshan Hydropower Station, this paper expounds the system framework of P6 project management platform and its application in schedule management, earned value management, and the hierarchical management of schedule plan. The methods, steps and other difficulties of dynamic management and realization of earned value curve are analyzed. The results show that the multi-stage schedule management method based on P6 project management platform has reference and transplantability for dam construction schedule management of hydropower station, and the method of winning value realizes the dynamic and comprehensive monitoring of progress and cost control. It has important application value and popularization significance to improve project benefit and management level.
【作者單位】: 長江勘測規(guī)劃設(shè)計(jì)研究有限責(zé)任公司工程建設(shè)咨詢總承包公司;
【分類號】:TV51
[Abstract]:Based on the general situation and management mode of dam project of Dagangshan Hydropower Station, this paper expounds the system framework of P6 project management platform and its application in schedule management, earned value management, and the hierarchical management of schedule plan. The methods, steps and other difficulties of dynamic management and realization of earned value curve are analyzed. The results show that the multi-stage schedule management method based on P6 project management platform has reference and transplantability for dam construction schedule management of hydropower station, and the method of winning value realizes the dynamic and comprehensive monitoring of progress and cost control. It has important application value and popularization significance to improve project benefit and management level.
【作者單位】: 長江勘測規(guī)劃設(shè)計(jì)研究有限責(zé)任公司工程建設(shè)咨詢總承包公司;
【分類號】:TV51
【參考文獻(xiàn)】
相關(guān)期刊論文 前3條
1 劉貴勝;宋丹舉;;P6軟件在國際工程項(xiàng)目投標(biāo)中的應(yīng)用[J];河南科學(xué);2013年11期
2 程可;;水電站建設(shè)進(jìn)度管理模式探索[J];人民長江;2010年18期
3 蔣家杰;;掙值管理及其在P6軟件中的應(yīng)用探討[J];項(xiàng)目管理技術(shù);2011年05期
【共引文獻(xiàn)】
相關(guān)期刊論文 前3條
1 劉穎;孫晶晶;;GIS項(xiàng)目管理中引入掙值分析方法[J];城市勘測;2012年06期
2 王歡;張偉;段瑋瑤;;潘口水電站工程建設(shè)管理簡述[J];人民長江;2012年16期
3 李世,
本文編號:2182062
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2182062.html
最近更新
教材專著