福建閩侯青林風(fēng)電場建設(shè)項目施工質(zhì)量控制研究
[Abstract]:With the urgent need of green economy in economic development and social production, the development of clean energy has become an inevitable trend in the development of electric power industry. Wind power industry has the characteristics of large reserves, wide distribution, reliable technology, and has become an important direction of clean energy development in China. However, with the rapid development of wind power engineering construction projects, more and more engineering construction projects, participating in the quality management of construction units are also different, so how to ensure the construction quality of wind farms has become an urgent problem to be solved. The construction quality of wind turbine is not only related to the investment cost and operation cost, but also to the life and property safety of the people. Therefore, how to manage the construction quality of wind power project, in the investment cost and construction period, Under the restriction of natural environment and other factors, it is a very important task for us to improve the construction quality of the whole project. Since the construction of wind farms involves many and miscellaneous tasks, not only houses but also roads are laid; there are not only large lifting installations, but also commissioning of weak electricity control systems; not only are there overhead lines, but also buried cables are laid, not to mention them. In this paper, by selecting three main projects of large concrete pouring, blower hoisting, substation installation and commissioning, and applying the principle of quality control, combined with the characteristics of the construction project of Minhou Qinglin wind farm in Datang, The evaluation and management of construction quality of key construction projects of wind farm engineering are studied. The quality problems such as cold joint, abrasive surface, honeycomb and so on, which appear in concrete pouring in the construction process of the project, are deeply analyzed. In the process of wind turbine hoisting, the dangerous situation is summed up, combined with the content of the wind turbine in power system, the analysis is carried out pertinently, aiming at the relevant cables of substation system and control system, Collecting and analyzing the problems in the installation and commissioning of cabinets, finding out the causes of these problems, formulating relevant plans and measures to further improve the construction quality, in order to consolidate the achievements of quality control, from the system, standards, Process and other aspects, strengthen implementation, ensure quality control to achieve practical results. This paper is divided into four chapters. The first chapter briefly introduces the background and significance of wind farm construction quality control research, the second chapter introduces the general situation of Fujian Minhou Qinglin wind farm, using fish burr diagram, histogram analysis of people, machinery, materials, technology, The influence of environment on the quality of construction is discussed, and the key factors affecting the quality of concrete pouring, blower hoisting and substation installation are found out. In the third chapter, according to the reasons of the analysis, the construction scheme of the three main works is formulated and the process control of the project construction is done well. The fourth chapter puts forward the guarantee measures to ensure the reliable construction of the construction scheme. Finally, it is concluded that the construction quality of the wind farm construction project can be effectively guaranteed by refining the construction scheme and perfecting the quality assurance measures.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TM614
【相似文獻】
相關(guān)期刊論文 前10條
1 孫濤,越海翔,申洪,王偉勝,戴慧珠,楊以涵;全國風(fēng)電場建設(shè)投資構(gòu)成與分析[J];中國電力;2003年04期
2 ;國家對風(fēng)電場建設(shè)的扶持辦法[J];能源工程;1997年03期
3 胡衛(wèi)紅;王鴻元;王瑋;;風(fēng)電場建設(shè)與運行中若干關(guān)鍵問題的探討[J];華北電力技術(shù);2007年09期
4 吳光軍;楊學(xué)軍;;風(fēng)電場建設(shè)小常識(下)[J];太陽能;2007年12期
5 ;上海電力設(shè)計院等3家單位為風(fēng)電場建設(shè)提供技術(shù)支撐[J];上海電力;2009年04期
6 ;酒泉千萬千瓦級風(fēng)電場建設(shè)啟動[J];云南電力技術(shù);2009年04期
7 吳啟仁;鄭主平;孫向東;;風(fēng)電場建設(shè)風(fēng)險管理[J];水利水電技術(shù);2009年09期
8 崔洪遠;;南方山地風(fēng)電場建設(shè)探討[J];能源研究與管理;2009年04期
9 本刊編輯部;;六鰲風(fēng)電場建設(shè)工程通過環(huán)境保護竣工驗收[J];華北電力技術(shù);2012年01期
10 洪波;;風(fēng)電場建設(shè)管理初探[J];風(fēng)能;2012年04期
相關(guān)會議論文 前7條
1 白文娟;李志強;姚立英;;淺析風(fēng)電場建設(shè)對鳥類的影響及對策建議[A];2013中國環(huán)境科學(xué)學(xué)會學(xué)術(shù)年會論文集(第六卷)[C];2013年
2 王振宇;劉國華;蔣建群;;海上風(fēng)電場建設(shè)的發(fā)展及關(guān)鍵技術(shù)問題探討[A];2008中國海洋論壇論文集[C];2008年
3 柴亞凡;周波;李欣娟;周建海;楊靖文;;戈壁荒漠區(qū)風(fēng)電場建設(shè)的水土流失特征分析及預(yù)測[A];首屆干旱半干旱區(qū)域水土保持生態(tài)保護論壇論文選編[C];2013年
4 ;風(fēng)電場建設(shè)[A];中國農(nóng)機工業(yè)協(xié)會風(fēng)能設(shè)備分會《風(fēng)能產(chǎn)業(yè)》(2014年第8期)[C];2014年
5 ;大唐新能源陜西分公司風(fēng)電場建設(shè)雙喜臨門捷報頻傳[A];《風(fēng)電技術(shù)》2013年06月第3期(總第39期)[C];2013年
6 孫浩;;分布式風(fēng)電場項目建設(shè)、運行分析及經(jīng)驗總結(jié)[A];中國農(nóng)業(yè)機械工業(yè)協(xié)會風(fēng)能設(shè)備分會2013年度論文集(上)[C];2013年
7 ;福建省新規(guī)劃196個陸上風(fēng)電場[A];《風(fēng)電技術(shù)》2013年02月第1期(總第37期)[C];2013年
相關(guān)重要報紙文章 前10條
1 通訊員 芮春生;法國開發(fā)署專家組考察者摩山風(fēng)電場建設(shè)[N];大理日報(漢);2007年
2 記者 趙鋒;酒泉千萬千瓦級風(fēng)電場建設(shè)啟動[N];人民日報;2009年
3 記者 李濟超 通訊員 許寶梓;甲東風(fēng)電場建設(shè)順利效益明顯[N];汕尾日報;2008年
4 記者 鄭有勝;阜新風(fēng)電場建設(shè)連刷兩項紀錄[N];遼寧日報;2009年
5 本報評論員;揚起風(fēng)電場建設(shè)的“龍頭”[N];酒泉日報;2009年
6 記者 韓然;加快推進重點項目 確保實現(xiàn)“兩個5000億”目標[N];沈陽日報;2010年
7 本報記者 孔慶軍;進一步加強風(fēng)電場建設(shè)前期工作[N];中國電力報;2003年
8 通訊員 曾波;瀘西:李子箐風(fēng)電場建設(shè)進展順利[N];紅河日報;2010年
9 代瓊芬 曹麗;全州首個風(fēng)電場建設(shè)項目加速推進[N];楚雄日報(漢);2011年
10 本報記者 楊蘊慧;洮南風(fēng)電場建設(shè)通過審查[N];東北電力報;2004年
相關(guān)碩士學(xué)位論文 前10條
1 楊云濤;風(fēng)電場建設(shè)項目風(fēng)險評價研究[D];華北電力大學(xué);2015年
2 王青;黑龍江省依蘭風(fēng)電場建設(shè)項目投資效益研究[D];吉林大學(xué);2016年
3 王q平;風(fēng)電場建設(shè)對區(qū)域環(huán)境影響及生態(tài)修復(fù)對策研究[D];遼寧工程技術(shù)大學(xué);2015年
4 趙忠煥;福建閩侯青林風(fēng)電場建設(shè)項目施工質(zhì)量控制研究[D];吉林大學(xué);2017年
5 張爽爽;風(fēng)電場建設(shè)對生態(tài)環(huán)境影響的研究[D];內(nèi)蒙古大學(xué);2012年
6 武超;烏拉特中旗風(fēng)電場建設(shè)項目前評估研究[D];華北電力大學(xué);2014年
7 張旭樂;風(fēng)力機優(yōu)化選型在風(fēng)電場建設(shè)中的經(jīng)濟性研究[D];湖南大學(xué);2011年
8 胡菊;大型風(fēng)電場建設(shè)對區(qū)域氣候影響的數(shù)值模擬研究[D];蘭州大學(xué);2012年
9 黃志偉;EPC模式下風(fēng)電場建設(shè)項目風(fēng)險管理研究[D];華北電力大學(xué);2013年
10 郝守禮;內(nèi)蒙古商都地區(qū)風(fēng)電場建設(shè)研究[D];天津大學(xué);2010年