基于和聲搜索算法的船舶分段工程項目工期—成本優(yōu)化
發(fā)布時間:2018-05-20 02:27
本文選題:船舶建造 + 工期—成本優(yōu)化。 參考:《財會月刊》2015年18期
【摘要】:工期—成本優(yōu)化是項目管理的重要內容,對工程項目經(jīng)濟效益的最大化起著至關重要的作用。針對船舶分段工程項目管理中的工期-成本管理問題,將工期-成本優(yōu)化應用于船舶分段工程項目管理領域,結合船舶分段工程項目中工期-成本優(yōu)化問題的特點建立數(shù)學模型,應用MATLAB軟件對算法進行編程,通過實例數(shù)據(jù),采用和聲搜索算法求解,結果表明和聲搜索算法可以比遺傳算法(GA)更加有效地求解該類問題。
[Abstract]:Duration-cost optimization is an important part of project management and plays an important role in maximizing the economic benefits of engineering projects. Aiming at the problem of time-cost management in ship segmented engineering project management, the optimization of time-cost is applied to the field of ship segmented engineering project management. Combined with the characteristics of the time-cost optimization problem in the ship subsection engineering project, the mathematical model is established, and the algorithm is programmed by MATLAB software. The algorithm is solved by using the harmony search algorithm through the example data. The results show that the harmonic search algorithm is more effective than genetic algorithm (GA) in solving this kind of problems.
【作者單位】: 江蘇科技大學經(jīng)濟管理學院;淮陰師范學院經(jīng)濟與管理學院;
【基金】:國家自然科學基金資助項目(項目編號:71203081) 教育部人文社科基金資助項目(項目編號:11YJA630151) 江蘇省社科基金資助項目(項目編號:10GLB011)
【分類號】:F407.474;U673
【參考文獻】
相關期刊論文 前1條
1 劉玉君;李瑞;o跆鋨鈐,
本文編號:1912799
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/1912799.html
教材專著