天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

XX市電業(yè)局集控設(shè)施改造工程項(xiàng)目管理研究

發(fā)布時(shí)間:2018-05-07 18:58

  本文選題:工程項(xiàng)目管理 + 項(xiàng)目管理體系。 參考:《吉林大學(xué)》2015年碩士論文


【摘要】:1998年,國(guó)務(wù)院下發(fā)“兩改一同價(jià)”即農(nóng)村電網(wǎng)改造、農(nóng)村電力管理體制改革和城鄉(xiāng)用電同網(wǎng)同價(jià)政策;2002年,國(guó)務(wù)院下發(fā)《電力體制改革方案》,提出“廠網(wǎng)分開(kāi)、主輔分離、輸配分開(kāi)、競(jìng)價(jià)上網(wǎng)”的四大改革任務(wù);2009年,國(guó)家電網(wǎng)公司提出智能電網(wǎng)發(fā)展計(jì)劃,哈爾濱地區(qū)電網(wǎng)的智能化改造工作開(kāi)始實(shí)施。截止到2014年,縣級(jí)電業(yè)局基本將“兩改一同價(jià)”貫徹實(shí)施,“廠網(wǎng)分開(kāi)”未能實(shí)現(xiàn),至于智能電網(wǎng)工作,部分地區(qū)已經(jīng)實(shí)現(xiàn)。由此,可以分析出電力行業(yè)改革的困難重重,但是,近年來(lái),呼聲越來(lái)越高,2014年3月的“兩會(huì)”也提出要“加快電力、油氣等體制改革。多渠道解決企業(yè)辦社會(huì)負(fù)擔(dān)和歷史遺留問(wèn)題,保障職工合法權(quán)益。完善現(xiàn)代企業(yè)制度,改革和健全企業(yè)經(jīng)營(yíng)者激勵(lì)約束機(jī)制”。電力企業(yè)改革迫在眉睫。隨著電力行業(yè)改革的深化,縣級(jí)供電企業(yè)面臨的壓力巨大,由自然壟斷轉(zhuǎn)向市場(chǎng)競(jìng)爭(zhēng)的形勢(shì)迫在眉睫,盡快加強(qiáng)企業(yè)的綜合實(shí)力是必然之路?h級(jí)供電企業(yè)必須考慮到在脫離了管控后,怎么實(shí)現(xiàn)自身的市場(chǎng)化,因此,供電企業(yè)自身企業(yè)管理能力的提高尤為重要。 本文以“XX市電業(yè)局集控設(shè)施改造工程”作為研究的對(duì)象,對(duì)項(xiàng)目的整體情況進(jìn)行較為詳細(xì)的分析,構(gòu)建了分析體系,作者結(jié)合了所學(xué)的工程管理相關(guān)理論和工作實(shí)踐,通過(guò)工程項(xiàng)目管理中的項(xiàng)目組織協(xié)調(diào)、合同管理、進(jìn)度管理、成本管理、質(zhì)量管理、風(fēng)險(xiǎn)管理、信息管理和環(huán)境保護(hù)八個(gè)方面研究了集控設(shè)施改造工程管理的體系。隨后,評(píng)價(jià)分析了已完工的營(yíng)城子和雙橋子工程帶來(lái)的社會(huì)經(jīng)濟(jì)效益,并對(duì)項(xiàng)目中存在都問(wèn)題進(jìn)行了描述,提出了相對(duì)應(yīng)的策略。 作者通過(guò)對(duì)集控設(shè)施改造工程的分析,進(jìn)一步提升縣級(jí)電力企業(yè)的管理能力。目前,,多數(shù)工程管理的研究都集中在工程管理的某一項(xiàng)的研究,例如,專(zhuān)門(mén)研究成本管理的文章,或者以質(zhì)量管理為主題的文章。本文作者主要是結(jié)合自己的實(shí)踐,通過(guò)對(duì)整個(gè)集控設(shè)施改造工程的整體項(xiàng)目管理體系的研究來(lái)全面提升管理技能,同時(shí)也結(jié)合自己的理論體系學(xué)習(xí)提高實(shí)踐能力。本文對(duì)于后續(xù)的集控設(shè)施改造工程有較大的實(shí)踐意義,同時(shí)也提供給很多電力工程項(xiàng)目全面管理提供了借鑒意義。
[Abstract]:In 1998, the State Council issued "two changes at the same price", that is, the reform of the rural power network, the reform of the rural electric power management system and the policy of the same price for urban and rural electricity use. In 2009, the State Grid Company put forward the smart grid development plan, and the intelligent transformation of the power grid in Harbin area began to be implemented. By 2014, the county electric power bureau will basically carry out "two changes to the same price", "plant and network separation" failed to achieve, as for the smart grid work, some regions have already achieved. Therefore, it is possible to analyze the difficulties in the reform of the power industry. However, in recent years, the voice is getting higher and higher. In March 2014, the "two sessions" also proposed to "accelerate the reform of power, oil and gas systems." Multiple channels to solve social burdens and historical legacy problems, to protect the legitimate rights and interests of workers. Improve the modern enterprise system, reform and improve the enterprise managers incentive and restraint mechanism. The reform of electric power enterprises is imminent. With the deepening of the reform of the electric power industry, the county-level power supply enterprises are facing enormous pressure. It is urgent to change the situation from natural monopoly to market competition. It is inevitable to strengthen the comprehensive strength of the enterprises as soon as possible. The county-level power supply enterprises must consider how to realize their own marketization after being out of control. Therefore, it is very important to improve the management ability of the power supply enterprises themselves. In this paper, "XX City Electric Power Bureau centralized control facility renovation project" as the object of study, the overall situation of the project is analyzed in detail, and the analysis system is constructed. The author combines the relevant theory and work practice of engineering management. Through the project organization coordination, contract management, schedule management, cost management, quality management, risk management, information management and environmental protection, the project management system of centralized control facility transformation is studied. Then, the social and economic benefits brought by the completed Yingcheng and Shuangqiao projects are analyzed, and the existing problems in the project are described, and the corresponding strategies are put forward. By analyzing the reconstruction project of centralized control facilities, the author further improves the management ability of county-level electric power enterprises. At present, most of the research on project management is focused on one item of project management, for example, articles specializing in cost management, or articles focused on quality management. The author of this paper mainly combines his own practice, through the study of the whole project management system of the central control facility transformation project, to improve the management skills, and at the same time, to improve the practical ability with the study of his own theory system. This paper is of great practical significance for the subsequent centralized control facility reconstruction project, and also provides a reference for the overall management of many electric power engineering projects.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:TM727

【引證文獻(xiàn)】

相關(guān)期刊論文 前1條

1 楊家正;;基于“5S”管理在電力工程施工的應(yīng)用探討[J];低碳世界;2016年01期



本文編號(hào):1858083

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/1858083.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶e06e3***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com