吉林省政府采購(gòu)績(jī)效評(píng)價(jià)體系建設(shè)研究
[Abstract]:In the early 1990s, Chinese scholars began to study government performance related issues, and a large number of research results have emerged. With the implementation of our government procurement law in 2003, the performance of government procurement has been paid more and more attention. At present, the performance of government procurement has become an important subtopic in the field of government performance research. This paper combines project management theory with performance management theory and government procurement theory to study the construction of Jilin provincial government procurement performance evaluation system. It not only embodies the innovation of this paper, but also reflects the cross-and-fusion of multi-disciplinary. The application of project management in government procurement performance evaluation provides a new idea for government procurement performance evaluation. The main content of this paper consists of six chapters, each of which is summarized as follows. The first chapter is the introduction, in which the background and significance of the performance evaluation of government procurement are discussed. Focus on the evaluation of the performance of government procurement research. The domestic related research begins with the government performance, and the government procurement performance gradually attracts the attention of the domestic scholars with the research of the government performance. The second chapter discusses government procurement theory, performance management theory and project management theory. The theme of this paper is the performance evaluation of government procurement. The discussion of the theory of government procurement and the theory of performance management lay the foundation for the later research. In addition, the innovation of this paper is to apply the idea of project management to the performance evaluation of government procurement. Based on this, this part also briefly describes the content of project management theory. The third chapter presents the organization structure, procurement method and procurement process of Jilin provincial government procurement center in detail, and analyzes the overall situation of Jilin provincial government procurement performance management according to the theory of performance management. The fourth chapter expounds the main body and object of Jilin provincial government purchasing performance evaluation system, the content of index system and the evaluation procedure. On this basis, the existing problems of the current performance evaluation system and the causes of the problems are analyzed. The fifth chapter is the core content of this paper. In this part, the index system is constructed from the perspective of performance evaluation system optimization, objectives and influencing factors, and the weight of the index is determined by the analytic hierarchy process (AHP). Then, this paper expounds the main body of performance evaluation and optimizes the evaluation process from the internal and external dimensions. After constructing the index system and determining the subject of bid evaluation, this paper constructs the performance evaluation model and optimizes the evaluation criteria. The sixth chapter mainly discusses the safeguard measures of optimizing the program construction. In this part, the author puts forward five safeguard measures from two aspects of system construction and management mechanism.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:F812.45
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 胡稅根;金玲玲;;我國(guó)政府績(jī)效管理和評(píng)估法制化問(wèn)題研究[J];公共管理學(xué)報(bào);2007年01期
2 周志忍;;我國(guó)政府績(jī)效管理研究的回顧與反思[J];公共行政評(píng)論;2009年01期
3 雷戰(zhàn)波;周博寧;;基于平衡計(jì)分卡的政府采購(gòu)績(jī)效評(píng)價(jià)研究——以陜西省某縣政府采購(gòu)中心為例[J];工業(yè)技術(shù)經(jīng)濟(jì);2007年02期
4 齊國(guó)生;美國(guó)績(jī)效審計(jì)的現(xiàn)狀與發(fā)展[J];中國(guó)審計(jì);2001年01期
5 包國(guó)憲;曹西安;;我國(guó)地方政府績(jī)效評(píng)價(jià)的回顧與模式分析[J];蘭州大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2007年01期
6 藍(lán)志勇;胡稅根;;中國(guó)政府績(jī)效評(píng)估:理論與實(shí)踐[J];政治學(xué)研究;2008年03期
7 蔡立輝;西方國(guó)家政府績(jī)效評(píng)估的理念及其啟示[J];清華大學(xué)學(xué)報(bào)(哲學(xué)社會(huì)科學(xué)版);2003年01期
8 盛運(yùn)華,趙宏中;績(jī)效管理作用及績(jī)效考核體系研究[J];武漢理工大學(xué)學(xué)報(bào);2002年02期
9 周國(guó)強(qiáng),雷羽;中國(guó)政府采購(gòu)績(jī)效評(píng)估現(xiàn)狀及其完善[J];武漢理工大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2004年06期
10 吳建南,李貴寧;教育財(cái)政支出績(jī)效評(píng)價(jià):模型及其通用指標(biāo)體系構(gòu)建[J];西安交通大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2004年02期
本文編號(hào):2418591
本文鏈接:http://sikaile.net/guanlilunwen/shuishoucaizhenglunwen/2418591.html