對(duì)河南職業(yè)技術(shù)學(xué)院新校區(qū)建設(shè)項(xiàng)目實(shí)施跟蹤審計(jì)的研究
[Abstract]:In accordance with the spirit of the Ministry of Education's "opinions on strengthening and standardizing the whole process Audit of Construction projects", all colleges and universities are required to gradually increase investment estimates, survey and design estimates, construction budgets, and completion and settlement of capital construction projects. Financial accounts and other links of the audit. In the process of auditing capital construction projects and repair projects, the internal audit departments of colleges and universities use the following audit mode to form a whole process, omnidirectional, regular supervision and restriction mechanism to standardize construction investment management, save money, and prevent the gradual development of investment. Clean government construction and so on all have the positive significance. Based on the in-depth analysis of the main contents of the tracking audit of the construction project in the new campus of Henan Vocational and Technical College, this paper emphasizes that the traditional "post audit" cannot achieve the ultimate goal of the construction project audit-prevention, benefit and appreciation. On this basis, it is emphasized that the audit of construction projects should move forward, guard against it, monitor the whole process of the operation of the construction projects, give full play to the preventive functions of the "immune system", expose the functions and resist the functions, and then reduce the construction costs of the projects. We will improve the efficiency of investment and improve the management of capital construction projects. Based on the practical experience of participating in the construction project tracking audit for many years, this paper makes a thorough and empirical study on the construction project tracking audit, which aims at exploring the contents, methods and procedures of the construction project tracking audit. And how to implement the construction project tracking audit for the sustainable development of colleges and universities, how to effectively achieve the function of internal audit, and promote the transformation and development of internal audit. In this paper, in the practice research of implementing the track audit of the new campus construction project, taking the whole progress process of the project as the main line, taking the important control link as the carrier, the paper analyzes the establishment of the risk control azimuth point. Use theory to combine with practice to carry on research and exploration. This paper expounds the audit procedure of the project, including the total process and the sub-flow of the tracking audit. In view of the problems found in the tracking audit of the project, this paper puts forward the corresponding countermeasures, and puts forward the general countermeasures of standardizing the tracking audit, which can accelerate the track audit mode to step into the development track of scientific and reasonable procedure and perfect system.
【學(xué)位授予單位】:南京理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2011
【分類號(hào)】:F239.63
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 董士波;全過程工程造價(jià)管理與全生命周期工程造價(jià)管理之比較[J];經(jīng)濟(jì)師;2003年12期
2 劉罡;建設(shè)項(xiàng)目跟蹤審計(jì)的定位與協(xié)調(diào)[J];中國(guó)審計(jì);2005年12期
3 趙永新;;高校建設(shè)項(xiàng)目全過程內(nèi)部審計(jì)方式的研究[J];科技管理研究;2009年04期
4 曾令如;;論高校開展建設(shè)工程全過程管理審計(jì)效益的實(shí)現(xiàn)[J];財(cái)務(wù)與金融;2010年04期
5 王芬;;淺議新形勢(shì)下高校內(nèi)部審計(jì)問題[J];財(cái)務(wù)與金融;2010年04期
6 王揚(yáng);;淺析建設(shè)項(xiàng)目跟蹤審計(jì)的重點(diǎn)[J];現(xiàn)代物業(yè)(中旬刊);2010年04期
7 張美蘭;;高校新校區(qū)建設(shè)項(xiàng)目跟蹤審計(jì)之思考[J];揚(yáng)州大學(xué)學(xué)報(bào)(高教研究版);2008年01期
8 何海梅;;規(guī)避全過程跟蹤審計(jì)風(fēng)險(xiǎn)的三種方法[J];中國(guó)內(nèi)部審計(jì);2010年01期
9 樊樹興;武斌;李宏;;創(chuàng)新工程結(jié)算審計(jì)模式[J];中國(guó)內(nèi)部審計(jì);2011年05期
10 羅荷英;溫彩秀;;健全高職院校內(nèi)部控制制度措施探析[J];知識(shí)經(jīng)濟(jì);2010年06期
相關(guān)碩士學(xué)位論文 前6條
1 石力;高校新校區(qū)建設(shè)多項(xiàng)目管理研究[D];西南交通大學(xué);2008年
2 徐小鋒;高;üこ添(xiàng)目管理模式研究與應(yīng)用[D];西安建筑科技大學(xué);2009年
3 姚維剛;河北金融學(xué)院新校區(qū)建設(shè)項(xiàng)目后評(píng)價(jià)研究[D];華北電力大學(xué)(河北);2008年
4 趙春江;中油長(zhǎng)城能源事業(yè)部?jī)?nèi)部工程項(xiàng)目審計(jì)的研究[D];大連理工大學(xué);2009年
5 郭智輝;高校新校區(qū)建設(shè)項(xiàng)目實(shí)施階段質(zhì)量管理研究[D];長(zhǎng)安大學(xué);2010年
6 解建新;某學(xué)院新校區(qū)建設(shè)存在的問題及對(duì)策[D];鄭州大學(xué);2010年
,本文編號(hào):2169062
本文鏈接:http://sikaile.net/guanlilunwen/shenjigli/2169062.html