[Abstract]:With the rapid development of China's economic construction and the implementation of the national macroeconomic regulation and control policy, the basic investment in infrastructure investment, especially the capital of highway engineering, has been impacted unprecedentedly. How to raise the construction funds has become the key to the highway construction. The BT item in this paper belongs to one of the upgrading projects in Chancheng district. It is the first time in Chancheng district to adopt BT mode for transportation infrastructure construction.
The BT project in this paper is made up of two different traffic construction projects. The content of BT financing is not only included in the construction of security, but also includes land expropriation and demolition fees. It has a certain reference significance for the development of similar project financing work in the future. This paper introduces and compares the project financing model and project construction management model and makes a comparative analysis. The analysis shows that BT model is suitable for non profit infrastructure construction. Through the introduction of the basic situation of the project, the analysis of the financing process of project bidding and competitive negotiation, and the analysis of financing risk, it is found that under the condition of high credit degree of local government, under the condition of no fixed assets mortgage, the project with land expropriation and demolition is used BT. The financing of the model is also feasible; at the same time, the risks of BT projects include bidding, financing, construction, repurchase, and legal risk. The prevention of these risks is mainly in the early stages of the project, especially in the process of bidding for BT projects, and the selection of high quality investment and construction parties.
At the same time, this paper puts forward the necessary content in policy and implementation, such as BT model related laws and regulations and BT model tax system, and points out the shortcomings of the article, such as this article mainly stands in the position of the government, and does not make a detailed analysis of the risks and profitability of the BT investment and construction parties.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2012
【分類號(hào)】:F832.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李剛;;BT模式風(fēng)險(xiǎn)及防范[J];城鄉(xiāng)建設(shè);2006年01期
2 王闖;;關(guān)于BT投資模式的探討[J];財(cái)政研究;2005年11期
3 王永新;呂高峰;;國內(nèi)工程建設(shè)項(xiàng)目BT方式的優(yōu)劣探討[J];都市快軌交通;2006年05期
4 魏伶俐;;淺談BT投融資模式的利與弊[J];中國工程咨詢;2009年08期
5 吳鳴;陳瑩瑩;;城市基礎(chǔ)設(shè)施項(xiàng)目融資模式的探討[J];工業(yè)技術(shù)經(jīng)濟(jì);2010年02期
6 黃歌;楊高升;;BT模式下融資風(fēng)險(xiǎn)管理[J];建筑管理現(xiàn)代化;2009年06期
7 姜炳麟,牛大勇;利用民營資本進(jìn)行項(xiàng)目融資的研究[J];經(jīng)濟(jì)師;2002年12期
8 何壽奎;BT模式投資項(xiàng)目的招標(biāo)合同籌劃[J];經(jīng)濟(jì)師;2005年04期
9 席敏;張婉君;;我國基礎(chǔ)設(shè)施建設(shè)中BT模式研究[J];經(jīng)濟(jì)縱橫;2005年11期
10 肖春華;上海市軌道交通建設(shè)BT模式初探[J];隧道建設(shè);2002年02期
相關(guān)碩士學(xué)位論文 前5條
1 童琳;公共基礎(chǔ)設(shè)施的BT模式運(yùn)用研究[D];同濟(jì)大學(xué);2007年
2 周剛;重大交通基礎(chǔ)設(shè)施建設(shè)BT融資的應(yīng)用研究[D];重慶交通大學(xué);2007年
3 王宇;BT模式下項(xiàng)目發(fā)起人對(duì)基礎(chǔ)設(shè)施建設(shè)的管理研究[D];重慶大學(xué);2008年
4 李磊;城市軌道交通BT工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];北京交通大學(xué);2009年
5 左國勝;BT模式在基礎(chǔ)設(shè)施項(xiàng)目中的應(yīng)用研究[D];山東大學(xué);2010年
本文編號(hào):2161331
本文鏈接:http://sikaile.net/guanlilunwen/huobilw/2161331.html