EPC模式下授權氛圍對建筑供應鏈信任的影響研究
[Abstract]:In the face of the fierce competition in the construction market, the introduction of supply chain management in the construction industry has gradually attracted the attention of scholars and construction institutions. Under the EPC model, the supply chain management system can be constructed by using this supply chain management idea for reference. Empowerment (empowerment) is one of the effective means to enable organizations to obtain sustainable competitive advantage. It is a multi-level concept. The importance of delegation atmosphere in enhancing organizational flexibility and promoting trust among organizations is increasing. Trust among organizations is one of the important prerequisites for the establishment of a successful supply chain. It is also the basis for the further improvement and sustainable development of the construction market. However, trust among organizations in the construction supply chain is not satisfactory. This paper takes the construction supply chain contractor and sub-contractor as the research object, discusses the factors of the authorization atmosphere and the mechanism of the authorization atmosphere acting on the trust between the organizations of the construction supply chain. In this paper, the related concepts of authorization atmosphere and inter-organizational trust are studied. Based on the theory of social exchange and the characteristics of architectural supply chain, the theoretical model and research hypothesis are put forward. Secondly, based on the mature questionnaire at home and abroad, the stability and applicability of the questionnaire are further verified according to the actual situation of construction engineering. Then, in the form of paper and electronic version, the general contractor and the middle and senior management in the subcontractor organization under the EPC mode are given the questionnaire. A total of 315 questionnaires are distributed, and 219 valid questionnaires are returned. Finally, by using SPSS17.0 software and factor analysis, it is concluded that there are three dimensions of authorization atmosphere in building supply chain mode: information sharing (information sharing), cross boundary autonomy (autonomy through boundaries), replaces hierarchical (team accountability). With team Through the correlation analysis and regression analysis, the following conclusions are drawn: the positive influence of authorization atmosphere on inter-organizational trust, the positive effect of each dimension of authorization atmosphere on relational trust; Information sharing has a positive effect on computational trust, while cross-boundary autonomy and team substitution level have no significant effect on computational trust. This paper highlights the research on the empowerment between the general contractor and the subcontractor of the construction supply chain, expands the research on the organizational level of the authorization, and improves the empirical research on the trust of the authorization atmosphere in the construction supply chain. It verifies the influence of various factors of authorization atmosphere on inter-organizational trust, and to some extent makes up for the lack of empirical research on authorization atmosphere and trust, and provides a useful reference for the further establishment and improvement of engineering trust theory system. In the practical process of the project, the general contractor can share the information platform, negotiate with the subcontractor to set common goals, and expand the authorization to the subcontractor within a certain scope, which can effectively promote the mutual trust between the two parties. In order to improve the operation efficiency of the whole supply chain.
【學位授予單位】:天津理工大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:F426.92;F224
【相似文獻】
相關期刊論文 前10條
1 艾耕云;陳俊芳;;供應鏈風險擴散收斂模型與風險管理機制[J];武漢理工大學學報(信息與管理工程版);2009年03期
2 楊承梁;;淺談建筑供應鏈中的風險管理[J];現(xiàn)代工業(yè)經(jīng)濟和信息化;2012年10期
3 韓東東,施國洪,馬漢武;供應鏈管理中的風險防范[J];工業(yè)工程;2002年03期
4 徐天發(fā);現(xiàn)代企業(yè)供應鏈管理及其優(yōu)化[J];武漢理工大學學報;2002年04期
5 倪燕翎,李海嬰,燕翔;供應鏈風險管理與企業(yè)風險管理之比較[J];物流技術;2004年12期
6 劉秋庭,嚴偉;中小企業(yè)的供應鏈——風險形成與化解[J];物流技術;2005年09期
7 劉冬林;王春香;;供應鏈多風險組合的綜合評估及風險管理[J];武漢理工大學學報(信息與管理工程版);2006年08期
8 韓景豐;丁建時;;基于系統(tǒng)分析的供應鏈風險識別與控制[J];鐵道運輸與經(jīng)濟;2006年10期
9 傅克俊;耿殿明;;如何構建應對突發(fā)事件的供應鏈策略體系[J];鐵道運輸與經(jīng)濟;2008年02期
10 張以彬;陳俊芳;;供應鏈的風險識別框架及其柔性控制策略[J];工業(yè)工程與管理;2008年01期
相關會議論文 前10條
1 王世良;李艷;;供應鏈控制對供應鏈能力風險的影響研究[A];第五屆(2010)中國管理學年會——運作管理分會場論文集[C];2010年
2 鄧小軍;;三角模糊數(shù)評價法與集群供應鏈風險評估、控制研究[A];中國會計學會第八屆全國會計信息化年會論文集[C];2009年
3 王海林;;企業(yè)供應鏈的風險與控制分析[A];第九屆全國會計信息化年會論文集(下)[C];2010年
4 李歡;陳宏;;供應鏈風險探討[A];第六屆中國青年運籌與管理學者大會論文集[C];2004年
5 盧卓;陳智民;;供應鏈風險管理的投入權重分析[A];信息經(jīng)濟與國民經(jīng)濟增長方式的轉(zhuǎn)變——中國信息經(jīng)濟學會2006年學術年會論文集[C];2006年
6 劉家國;李俊;趙金樓;;兩階段供應鏈風險傳遞機制研究[A];第十二屆中國管理科學學術年會論文集[C];2010年
7 晚春東;;供應鏈系統(tǒng)運行整體風險評估指標體系[A];當代中國遼寧發(fā)展·創(chuàng)新·和諧——遼寧省第二屆哲學社會科學學術年會獲獎成果文集[C];2009年
8 葉成利;蒙少東;;農(nóng)產(chǎn)品(食品)供應鏈風險管理文獻綜述[A];第四屆農(nóng)業(yè)政策理論與實踐研討會——農(nóng)民專業(yè)合作組織發(fā)展與制度建設論文集[C];2007年
9 沈默;;“三鹿奶粉”供應鏈管理缺失和優(yōu)化對策[A];國家教師科研基金十一五階段性成果集(江蘇卷)[C];2010年
10 施國洪;陳敬賢;程發(fā)新;;供應鏈風險的隨機估計模型研究[A];和諧發(fā)展與系統(tǒng)工程——中國系統(tǒng)工程學會第十五屆年會論文集[C];2008年
相關重要報紙文章 前10條
1 張榮忠;供應鏈需要誠信[N];國際商報;2004年
2 徐娟 劉志學;牢牢把握供應鏈風險[N];中國石化報;2007年
3 張榮忠;彈性供應鏈:創(chuàng)造高價值[N];國際商報;2007年
4 宋華;供應鏈管理之道:如何在平的世界中競爭[N];中國商報;2009年
5 丁俊發(fā);“2012年中國供應鏈管理調(diào)查”告訴我們什么[N];現(xiàn)代物流報;2013年
6 ;供應鏈管控“攻心戰(zhàn)”[N];現(xiàn)代物流報;2014年
7 丁俊發(fā);向“中國供應鏈管理示范企業(yè)”學習什么[N];現(xiàn)代物流報;2014年
8 榮德;供應鏈如何經(jīng)得起風暴[N];國際商報;2006年
9 王國文 博士;全球物流與供應鏈最新趨勢與動態(tài)[N];現(xiàn)代物流報;2006年
10 興業(yè)全球基金 徐天舒 甘雨;供應鏈責任 企業(yè)社會責任被忽視的一環(huán)[N];中國證券報;2011年
相關博士學位論文 前10條
1 邱映貴;供應鏈風險傳遞及其控制研究[D];武漢理工大學;2010年
2 艾耕云;基于分形理論的供應鏈風險結(jié)構及管理機制研究[D];上海交通大學;2008年
3 許樹輝;基于供應鏈嵌入視角的企業(yè)空間組織研究[D];華東師范大學;2009年
4 鄭詩田;供應鏈中若干關鍵決策與協(xié)調(diào)問題的研究[D];天津大學;2010年
5 舒良友;制造商為核心的供應鏈風險形成機理與訂單完成優(yōu)化模型研究[D];西南交通大學;2009年
6 劉家國;基于突發(fā)事件風險的供應鏈利益分配與行為決策研究[D];哈爾濱工程大學;2010年
7 易海燕;供應鏈風險的管理與控制研究[D];西南交通大學;2007年
8 辛玉紅;供應鏈系統(tǒng)魯棒性研究[D];中國航天第二研究院;2008年
9 張令榮;供應鏈協(xié)同度評價模型研究[D];大連理工大學;2011年
10 李廣;供應鏈系統(tǒng)演化的動力機制、模式及其特征研究[D];天津大學;2011年
相關碩士學位論文 前10條
1 張鵬;基于委托代理關系的供應鏈風險研究[D];西北大學;2009年
2 高瑞甫;我國電信運營商供應鏈風險預警研究[D];中國地質(zhì)大學(北京);2009年
3 朱彩虹;基于突發(fā)事件的供應鏈應急管理研究[D];廈門大學;2008年
4 李守勇;企業(yè)風險管理視角的供應鏈風險管理研究[D];江蘇大學;2009年
5 胡媛;供應鏈突發(fā)事件的應急管理研究[D];重慶交通大學;2008年
6 黃會軍;E公司供應鏈管理改革案例研究[D];電子科技大學;2009年
7 曹仲秋;A公司的產(chǎn)品與供應鏈匹配策略研究[D];廈門大學;2008年
8 徐磊;基于供應鏈管理的魯能物資集團運營模式[D];華北電力大學(北京);2009年
9 殷書波;青島汽車廠供應鏈管理的改進[D];北京交通大學;2009年
10 曹薇;基于粒子群的供應鏈認知圖預警方法研究[D];上海交通大學;2009年
本文編號:2418403
本文鏈接:http://sikaile.net/guanlilunwen/gongyinglianguanli/2418403.html