中國(guó)廣核集團(tuán)備品備件采購(gòu)管理改進(jìn)研究
發(fā)布時(shí)間:2018-04-26 03:24
本文選題:備品備件 + 庫(kù)存管理; 參考:《大連理工大學(xué)》2014年碩士論文
【摘要】:電力工業(yè)是國(guó)民經(jīng)濟(jì)的基礎(chǔ)產(chǎn)業(yè),也是關(guān)系國(guó)計(jì)民生的公共事業(yè),是國(guó)民經(jīng)濟(jì)發(fā)展的重要支撐。電力的生產(chǎn)、輸送、使用一次完成,電能無(wú)法儲(chǔ)存,其特點(diǎn)決定了發(fā)電企業(yè)設(shè)備維修用備品備件及時(shí)可靠供應(yīng)的重要性。相比于火電站,核電站的系統(tǒng)設(shè)備更加高、精、尖,前期建造成本更高。想要取得良好的經(jīng)濟(jì)效益,核電站必須在確保核安全的前提下努力提高機(jī)組的可用率,因此對(duì)備品備件及時(shí)、可靠和穩(wěn)定供應(yīng)的要求更高。 本文首先提出了論文的選題背景、研究的目的與意義以及研究的思路和方法。然后綜述了國(guó)內(nèi)外核電行業(yè)的發(fā)展及中國(guó)廣核集團(tuán)概況,介紹了電力企業(yè)備品備件供應(yīng)的特點(diǎn)。隨后以中國(guó)廣核集團(tuán)和其下屬核電企業(yè)的備品備件采購(gòu)管理作為研究對(duì)象,本章節(jié)在總結(jié)大亞灣、嶺澳一期核電站四臺(tái)核電機(jī)組備品備件采購(gòu)管理經(jīng)驗(yàn)和不足的基礎(chǔ)上,尋找出孤立核電站備品備件采購(gòu)管理存在的問(wèn)題。接著引入并介紹了采購(gòu)計(jì)劃相關(guān)理論、庫(kù)存管理相關(guān)理論、供應(yīng)鏈管理相關(guān)理論,并借助這些理論對(duì)相關(guān)問(wèn)題存在的原因進(jìn)行了深入分析。最后,結(jié)合企業(yè)實(shí)際情況,探索解決問(wèn)題的途徑,提出解決問(wèn)題的切實(shí)可行方案,包括實(shí)施統(tǒng)一的備品備件采購(gòu)計(jì)劃,實(shí)施多電站備品備件聯(lián)合儲(chǔ)備以及優(yōu)化備品備件采購(gòu)體系實(shí)現(xiàn)聯(lián)合采購(gòu),并在上述具體措施基礎(chǔ)上提出建立備品備件采購(gòu)平臺(tái)實(shí)現(xiàn)集中采購(gòu)的設(shè)想。結(jié)語(yǔ)部分,對(duì)論文研究成果應(yīng)用效果進(jìn)行了展望,并提出了進(jìn)一步研究的方向。
[Abstract]:Electric power industry is the basic industry of the national economy, is also the public enterprise which relates to the national economy and the people's livelihood, is the important support of the national economy development. The production, transmission and use of electric power are completed once, and the electric energy can not be stored. Its characteristics determine the importance of timely and reliable supply of spare parts for equipment maintenance in power generation enterprises. Nuclear power plant systems are more expensive, sophisticated, sophisticated, and expensive to build than thermal power plants. In order to achieve good economic benefits, nuclear power plants must work hard to improve the availability of units under the premise of ensuring nuclear safety. Therefore, the requirements for timely, reliable and stable supply of spare parts are higher. In this paper, the background, the purpose and significance of the research, as well as the ideas and methods of the research are put forward. Then, the development of nuclear power industry at home and abroad and the general situation of China Guangzhou Nuclear Power Group are summarized, and the characteristics of spare parts supply in power enterprises are introduced. Then taking the procurement management of spare parts of China Guangzhou Nuclear Power Group and its affiliated nuclear power enterprises as the research object, this chapter summarizes the experiences and deficiencies of the procurement management of spare parts for the four nuclear power units in Daya Bay and Lingao nuclear power plants. To find out the isolated nuclear power plant spare parts procurement management problems. Then it introduces and introduces the relevant theories of purchasing plan, inventory management and supply chain management, and analyzes the causes of the related problems with the help of these theories. Finally, according to the actual situation of the enterprise, to explore the ways to solve the problem, put forward a practical solution to the problem, including the implementation of a unified spare parts procurement plan, The joint storage of spare parts for multi-power stations and the optimization of purchasing system for spare parts are carried out. Based on the above measures, the assumption of establishing a platform for purchasing spare parts to realize centralized procurement is put forward. In the conclusion part, the application effect of the research results is prospected, and the direction of further research is put forward.
【學(xué)位授予單位】:大連理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:F274;F426.23
【參考文獻(xiàn)】
相關(guān)期刊論文 前8條
1 趙曉敏,馮之浚,黃培清;基于產(chǎn)品的供應(yīng)鏈選擇策略[J];商業(yè)研究;2004年16期
2 ;Research on Selection of Equipment Maintenance Modes[J];International Journal of Plant Engineering and Management;2006年03期
3 李曉明,景建國(guó),陳世均;以可靠性為中心的維修在大亞灣核電站的應(yīng)用及其推廣[J];核科學(xué)與工程;2001年S1期
4 林勇,馬士華;供應(yīng)鏈管理的戰(zhàn)略管理策略[J];機(jī)械管理開(kāi)發(fā);1998年02期
5 胡從旭;;ABC分類(lèi)法在庫(kù)存管理中的實(shí)施及改進(jìn)[J];物流工程與管理;2010年09期
6 梁積江;;供應(yīng)鏈企業(yè)戰(zhàn)略合作伙伴關(guān)系探討[J];職業(yè)時(shí)空;2008年02期
7 王永剛;張龍江;;核電站與供應(yīng)商力量博弈[J];中國(guó)物流與采購(gòu);2006年15期
8 張秋妙;;從安全角度看核電發(fā)展[J];現(xiàn)代物理知識(shí);2009年01期
,本文編號(hào):1804286
本文鏈接:http://sikaile.net/guanlilunwen/gongyinglianguanli/1804286.html
最近更新
教材專(zhuān)著