本文選題:城市隧道 + 減震爆破; 參考:《科技通報》2017年12期
【摘要】:為了研究如何降低城市地下隧道施工的爆破震動效應,本文以某個城市隧道掘進工程為背景,設計了下導洞超前微差爆破方案,并進行現場試驗,利用測震儀對爆破振動進行監(jiān)測分析,發(fā)現下導洞超前微差爆破方案雖然一定程度上降低了爆破震動,但是下導洞爆破時,震動速度為1.735 cm/s,沒有達到建筑物安全控制標準,為此,在原方案基礎上提出了超前非爆+擴挖層控制爆破方案,成功地把爆破震動速度降低在1.5 cm/s以內,在保證隧道掘進效率的同時又保障了建筑物的安全,實現了城市隧道的安全、高效掘進。
[Abstract]:In order to study how to reduce the blasting vibration effect in the construction of urban underground tunnel, this paper designs the advanced millisecond blasting scheme of the lower guide tunnel and carries out the field test, based on the background of a city tunnel tunneling project. The blasting vibration was monitored and analyzed by using the seismograph. It was found that although the blasting vibration was reduced to a certain extent by the advanced millisecond blasting scheme of the lower guide tunnel, the vibration velocity was 1.735 cm / s during the lower guide hole blasting, which did not meet the safety control standard of the building. For this reason, based on the original plan, the paper puts forward the control blasting scheme of advanced non-explosive expanding layer, which successfully reduces the blasting vibration speed to less than 1.5 cm/s, which ensures the tunneling efficiency and the safety of the building. The safety and efficiency of tunneling are realized.
【作者單位】: 貴州省都勻公路管理局;
【分類號】:U455.6
【相似文獻】
相關期刊論文 前10條
1 劉國良,李治國,方俊波,金強國;圓梁山隧道穿越粉細砂層注漿加固體的減震爆破技術[J];鐵道建筑;2004年09期
2 王會平;高陡邊坡的減震爆破措施[J];采礦技術;2004年02期
3 王鑫;;某增建二線鐵路隧道減震爆破技術[J];國防交通工程與技術;2010年03期
4 彭永毅;;城市隧道下穿別墅群的減震爆破控制技術[J];福建建筑;2010年06期
5 張鵬;劉振耀;;大灣鋅鉬礦減震爆破對長城安全保護的研究[J];河北冶金;2010年05期
6 阮清林;;長洪嶺隧道近距下穿江池鎮(zhèn)高效減震爆破技術試驗[J];隧道建設;2012年03期
7 邢光武;鄭炳旭;魏曉林;;延時起爆干擾減震爆破技術的發(fā)展與創(chuàng)新[J];礦業(yè)研究與開發(fā);2009年04期
8 邢光武;陳清平;鄭炳旭;;精確延時干擾減震爆破網路的試驗研究[J];合肥工業(yè)大學學報(自然科學版);2009年10期
9 劉為洲;南山礦凹山采場減震爆破試驗研究[J];金屬礦山;2004年06期
10 劉賢鋒;臨近井巷的露天減震爆破[J];工程爆破;2002年04期