超高路塹邊坡治理工程案例研究Ⅱ:治理對策及其過程控制
本文選題:邊坡工程 切入點:高邊坡 出處:《巖石力學(xué)與工程學(xué)報》2017年05期
【摘要】:概述了K227滑坡治理工程方案,對該滑坡分"上、中、下"三段進行施工的全過程開展數(shù)值模擬與優(yōu)化分析,并與監(jiān)測反饋信息相互印證,指導(dǎo)了邊坡施工的過程控制,達到了超高路塹邊坡治理"一次規(guī)劃、分步推進、安全實施、不留后患"的工程控制目標(biāo),并得到以下結(jié)論:(1)將綜合工況下邊坡整體穩(wěn)定系數(shù)F_s=1.10作為施工過程穩(wěn)態(tài)控制的標(biāo)準(zhǔn),以實現(xiàn)超高路塹邊坡穩(wěn)態(tài)控制,保證施工安全及其支護結(jié)構(gòu)的耐久性;(2)坡腳反壓是超高路塹邊坡施工過程中確保其具備臨時穩(wěn)定的必要條件,應(yīng)謹(jǐn)慎選擇對此類臨時安全措施調(diào)整的時機和節(jié)奏;(3)雙排錨索抗滑樁方案的預(yù)先規(guī)劃和及時生效,對于控制施工期間后山牽引變形發(fā)展和邊坡穩(wěn)定條件弱化,保證施工過程安全及成功治理具有重要的作用;(4)超高路塹邊坡治理過程中存在多種潛在失穩(wěn)機制,以及局部和整體變形相互轉(zhuǎn)化的問題,需要進行多方案模擬優(yōu)化,實現(xiàn)局部和整體變形的協(xié)調(diào)控制;(5)路塹高邊坡動態(tài)設(shè)計與信息化施工需要由邊坡變形破壞驅(qū)動設(shè)計調(diào)整的被動模式,轉(zhuǎn)化為模擬及預(yù)測邊坡變形發(fā)展規(guī)律,實現(xiàn)施工次生病害的主動控制。
[Abstract]:Overview of the project K227 of the landslide, landslide ", and" three section of numerical simulation and optimization analysis of the whole process in construction, and corroborated the monitoring and feedback information, guide the process of construction of slope control, reached a high cutting slope governance "a plan, step by step. The implementation of security control, the target leaving troubles" project, and get the following conclusions: (1) the comprehensive slope overall stability coefficient F_s=1.10 as the construction process of steady state control standards, to achieve ultra high slope steady control, ensure the construction safety and supporting structure durability; (2) the slope of back pressure is a necessary condition to ensure the temporary stability of high cutting slope in the construction process, should be careful to choose the timing and pace of adjustment of such temporary security measures; (3) double row anti slide pile with anchor cable scheme for pre planning and timely effective control During the construction of the mountain for traction and stability of slope deformation development conditions weakening, to ensure construction safety and successful governance plays an important role; (4) a variety of potential instability mechanism of high cutting slope in the process of governance, transformation and partial and overall deformation problem, need to simulate the optimization scheme, implementation of local and global the deformation of the coordinated control; (5) failure of passive mode driven design adjustment by slope deformation need high slope dynamic design and information construction, into the simulation and prediction of slope deformation, active control to realize the construction of secondary disease.
【作者單位】: 福州大學(xué)環(huán)境與資源學(xué)院;地質(zhì)工程福建省高校工程研究中心;中國公路工程咨詢集團有限公司中咨華科交通建設(shè)技術(shù)有限公司;
【基金】:國家自然科學(xué)基金資助項目(41002127) 交通運輸部建設(shè)科技項目(201331849A130) 福建省交通運輸科技項目(201242)~~
【分類號】:P642.22;U418.5
【相似文獻】
相關(guān)期刊論文 前8條
1 王繼光;;鐵道新線黃土路塹邊坡的地質(zhì)特點及對黃土區(qū)鐵道工程地質(zhì)勘測的初步意見[J];水文地質(zhì)工程地質(zhì);1957年05期
2 馮連昌;;試論黃土路塹邊坡形式[J];水文地質(zhì)工程地質(zhì);1960年05期
3 白濤;牛同輝;黃世長;;路塹邊坡地震響應(yīng)及抗震設(shè)防研究[J];四川建筑;2013年06期
4 許國昌;強震區(qū)人工巖質(zhì)路塹邊坡的破壞及穩(wěn)定性評價[J];西北地震學(xué)報;1981年03期
5 李水平;;益湛線某路塹邊坡滑動變形分析[J];土工基礎(chǔ);2014年03期
6 陳波;;黃土路塹邊坡的失穩(wěn)破壞因素與變形模式分析[J];地下水;2011年04期
7 張曉平;吳順川;王思敬;;類土質(zhì)路塹邊坡動態(tài)監(jiān)測及數(shù)值模擬分析[J];巖石力學(xué)與工程學(xué)報;2008年S2期
8 ;[J];;年期
相關(guān)會議論文 前2條
1 游其勇;陳仕剛;;雨水入滲下膨脹土路塹邊坡穩(wěn)定性數(shù)值分析[A];中國力學(xué)學(xué)會學(xué)術(shù)大會'2009論文摘要集[C];2009年
2 張衛(wèi)中;尹光志;康欽容;余果;;向家坡滑坡綜合治理研究[A];第一屆中國水利水電巖土力學(xué)與工程學(xué)術(shù)討論會論文集(上冊)[C];2006年