基于層次分析法的高層建筑垂直運輸機械優(yōu)化配置方法研究
[Abstract]:The development of urban architecture to high altitude has become the main direction of the development of social architecture today. The high-rise building developing to the high altitude is huge in scale, requires a large number of building materials to be transported, and the construction personnel are concentrated in commuting to and from work. Construction process produces a lot of construction waste, at present, a large number of vertical transport machinery for transport. The construction speed of high-rise building depends to a certain extent on the vertical transportation speed of the materials required for construction. Therefore, the configuration of vertical transport machinery plays an important role in the construction organization. Domestic and foreign scholars have done a lot of research on the selection of vertical transport machinery, rent-purchase decision and safety construction. However, due to the diversity of factors affecting the allocation of vertical transport machinery, there are still some problems that need to be further studied. Aiming at the problem of vertical transport machinery configuration, this paper investigates the types, parameters, characteristics and so on of all kinds of vertical transport machinery, collects a large amount of data, and adopts the theory of analytic hierarchy process (AHP) according to the configuration principle, as well as the advantages and disadvantages of various configuration schemes. The analytic hierarchy process (AHP) structure model is established, which is solved by quotient method and difference method respectively. The results of quotient method and difference method are compared, and the reasons for the difference between the two methods are analyzed. On this basis, the collected data is modified, and the judgment matrix is constructed by using the quotient method and the difference method again. The weight ranking of the influencing factors of each level and the comprehensive evaluation coefficient of each configuration scheme are calculated by using the data processing software Matlab. This paper provides a method for the optimization of vertical transport machinery configuration scheme in high-rise buildings. The main research contents are as follows: 1. This paper summarizes the research status of vertical transport machinery at home and abroad, summarizes the commonly used methods of decision-making analysis, and puts forward the research contents and methods of this paper according to the previous research results. 2. This paper introduces the main types of vertical transport machinery at present, analyzes the advantages and disadvantages of all kinds of vertical transport machinery, and analyzes the main configuration principles that should be taken into account in choosing the vertical transport machinery configuration scheme in the construction of high-rise buildings. And the main configuration scheme at this stage. 3. The basic principle of analytic hierarchy process (AHP) and the basic steps of decision-making by AHP are summarized. According to the analysis principle of vertical transport machinery configuration, the factors that influence the decision-making of vertical transport machinery configuration scheme are analyzed. The hierarchical structure model was established by 12 influencing factors, and the data were collected by questionnaire, the collected data were processed by quotient method and difference method, and the pairwise comparison matrix was constructed respectively. The Matlab software is used to solve the comparison matrix, and the results are in good agreement with the actual engineering examples. It is verified that the established hierarchical structure model is effective. 4. comparing the results of the quotient method and the difference method, analyzing the reason of the difference between the two calculation methods, modifying the collected data, re-using the quotient method and the difference method to solve the hierarchical structure model Some reasonable suggestions are put forward for the reference of construction units.
【學(xué)位授予單位】:湘潭大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU976.3
【參考文獻】
相關(guān)期刊論文 前10條
1 李慧云,劉百善;層次分析法在企業(yè)籌資決策中的應(yīng)用研究[J];北京理工大學(xué)學(xué)報(社會科學(xué)版);2004年01期
2 駱正清;層次分析法中判斷矩陣構(gòu)造的新方法[J];電子科技大學(xué)學(xué)報;1999年05期
3 龔志平,李鋼強,劉毅,杜培榮;層次分析法中判斷矩陣的調(diào)查表問卷設(shè)計[J];中國公共衛(wèi)生管理;1995年01期
4 鄧鎖,風(fēng)笑天;問卷調(diào)查研究:第二個10年的發(fā)展與分析[J];華中理工大學(xué)學(xué)報(社會科學(xué)版);2000年03期
5 趙大友,黃明知,肖煥雄;工程施工機械設(shè)備租買決策模型與準則[J];基建優(yōu)化;2002年06期
6 劉佩衡;我國塔式起重機行業(yè)發(fā)展歷程(一)[J];建筑機械化;2003年10期
7 何振礎(chǔ);施工升降機的發(fā)展及設(shè)計參數(shù)的適應(yīng)性調(diào)整[J];建筑機械;1998年07期
8 胡玉銀;;第四講:超高層建筑施工垂直運輸體系的構(gòu)成與配置(一)[J];建筑施工;2007年08期
9 胡玉銀;;第四講:超高層建筑施工垂直運輸體系的構(gòu)成與配置(二)[J];建筑施工;2007年09期
10 胡玉銀;;第四講:超高層建筑施工垂直運輸體系的構(gòu)成與配置(三)[J];建筑施工;2007年10期
本文編號:2442075
本文鏈接:http://sikaile.net/falvlunwen/sflw/2442075.html