情事變更原則在建設工程施工合同中的適用
[Abstract]:In recent years, under the influence of the urbanization process, China's construction industry has developed rapidly. At the same time, there are many destabilizing factors in the economic market, so that the objective basis of the contract formation tends to change significantly during the performance of the contract, and the contract may result in a serious imbalance between the parties. Under this background, the principle of change change is established in the form of judicial interpretation in our country. The principle of non-event change is highly abstract, and the foundation of the application of different types of contract is not the same, and only one kind of contract is selected in this paper, i.e. the construction contract of construction project is studied. This paper starts with the particularity and complexity of the construction contract itself, and analyzes the necessity of applying the change principle in this kind of contract. List the type of risk applicable to the principle of change of circumstances that may be caused in the construction contract of the construction project. This paper analyzes the possibility of applying the change principle of the construction contract applicable to different valuation methods. The paper focuses on the plight of the principle of the change of key research in the process of application and puts forward a solution. The principle and standard of application of the principle of change change in the construction contract of construction project. In addition to the introduction, the article consists of four parts: the necessity of application of the principle of change of the first part in the construction contract of the construction project. The establishment of the principle of the change of the event has its inevitability, as a specific legal principle, which is developed by the principle of good faith and is a supplement to the principle of strict adherence to the contract. As the contract performance time of the construction project is long, the contract performance process is easy to be influenced by external factors, the market instability and the weak risk tolerance of the construction enterprises, so that the foundation of the construction contract changes frequently during the performance of the contract, The principle of application change is very necessary. The second part analyzes the risk that may cause the foundation change of the construction contract of the construction project. Through this analysis, it can be found that the concept of event change and force majeure, commercial risk and obvious distortion is similar, and it is easy to be confused. thus further analyzing the differences between them. Because construction contracts often use different valuation methods, this will also affect the application of the principle of change change, and the analysis is also part of the analysis. The types of risks that may exist in the construction contract of the construction project include force majeure, changes in raw materials prices and labor costs, abnormal conditions of the construction site, and changes in policies and laws and regulations. The key to the difference between the change of the event and the force majeure is that the result of the force majeure is different. The risks that are not foreseeable and cannot be borne and the risks that can be foreseen but not borne shall be subject to change of circumstances, unforeseen but affordable risks and foreseeable and foreseeable risks are commercial risks. The difference between the change of the event and the fair is mainly due to the subjective attitude of the parties. The construction contract with different valuation methods has the space applicable to the change principle, but the fixed price contract is the main contract. The third part analyzes the dilemma of the principle of the change of the application of the construction contract from six aspects, including: the application of the principle of change in the judicial practice should not be too conservative; The invalid construction contract cannot apply the change principle; because of the particularity of the bidding and bidding procedures, the principle of change in the application of construction contract shall be based on the determination of the contract content, not the contract establishment; In the event of losses arising from the principle of change of applicable circumstances, the actual losses and benefits of both parties shall be taken into account; and the change of circumstances shall constitute a subject matter of exemption. The fourth part is based on the previous part of the analysis, and the application standard of the principle of the change of the change in the construction contract of the construction project: First, the occurrence of the circumstance of the change of the event is necessary, and in the construction contract of the construction mainly refers to the price of the goods, the increase in the labor cost and the change of the policy; and the second, Due to the particularity of the bidding and bidding procedures, the change of the circumstances occurs before the construction contract content is determined (i.e. the deadline for submission of the bidding document as stipulated in the Bidding Document); and thirdly, the occurrence of the event change cannot be imputed to any party, If the construction delay is caused by one party, the change of the circumstances during the delay period shall not apply the principle; and fourthly, the change of the event is not met when the party determines it in the contract content; and the fifth continuation of the contract will result in the consequences of fair and unfair.
【學位授予單位】:西南政法大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:D923.6
【相似文獻】
相關(guān)期刊論文 前10條
1 耿軍;情事變更原則存在之必要性淺析[J];北京化工大學學報(社會科學版);2002年04期
2 段艷紅;淺析情事變更原則[J];滁州師專學報;2002年03期
3 周茂青;適用情事變更原則的要件[J];福州師專學報;2002年04期
4 李蓮葉;略論情事變更原則[J];河南廣播電視大學學報;2002年03期
5 朱呈義,蔡穎雯;也談情事變更原則[J];煙臺師范學院學報(哲學社會科學版);2002年01期
6 廖斌;張曦;;情事變更原則之芻議[J];西南政法大學學報;2002年05期
7 孫勝玉,楊勇駿;論情事變更原則[J];丹東師專學報;2003年02期
8 馬育紅,呂建國;情事變更原則比較研究——關(guān)于我國情事變更原則立法的思考[J];甘肅政法學院學報;2003年03期
9 萬金湖;論情事變更原則的法理依據(jù)[J];佛山科學技術(shù)學院學報(社會科學版);2004年01期
10 易航帆;;試論情事變更原則[J];警官教育論壇;2006年01期
相關(guān)會議論文 前1條
1 張照東;郭小東;;我國民法典情事變更立法選擇分析[A];中國律師2000年大會論文精選(上卷)[C];2000年
相關(guān)重要報紙文章 前10條
1 張琴;誠實信用與情事變更原則的具體運用[N];江蘇法制報;2005年
2 陳林芳;債法中情事變更原則的法律思考[N];人民法院報;2000年
3 北京市第一中級人民法院 劉海濤;論情事變更原則[N];中華建筑報;2010年
4 陶劍涵;情事變更原則的適用[N];江蘇法制報;2012年
5 郭雪平 王英;情事變更原則實務解析[N];中國礦業(yè)報;2011年
6 胥忠明 王芳;閉口合同與情事變更原則[N];江蘇經(jīng)濟報;2011年
7 本報記者 郭士輝 李云超 本報通訊員 朱世貴 實習生 張沛;嚴格適用情事變更 妥善把握裁判尺度[N];人民法院報;2009年
8 唐寧;法律應戰(zhàn)“非典”[N];科技日報;2003年
9 記者 胥會云 陰雪;“情事變更”將被嚴格適用 退房官司或更難打贏[N];第一財經(jīng)日報;2012年
10 高翔;從非典對相關(guān)產(chǎn)業(yè)的影響談情事變原則的適用[N];江蘇經(jīng)濟報;2003年
相關(guān)碩士學位論文 前10條
1 李俏婷;論情事變更原則及其適用[D];中國政法大學;2007年
2 章丹青;論情事變更原則[D];中國政法大學;2007年
3 唐梨芳;情事變更原則的適用[D];揚州大學;2009年
4 鐘貴榮;情事變更原則研究[D];華中科技大學;2008年
5 唐國明;情事變更原則研究[D];西南政法大學;2010年
6 任靜;情事變更原則認定標準研究[D];內(nèi)蒙古大學;2010年
7 張昕;比較法視野下的情事變更原則考察[D];中國政法大學;2009年
8 熊雪瑩;情事變更原則的適用研究[D];鄭州大學;2010年
9 卜范杰;論情事變更原則[D];內(nèi)蒙古大學;2011年
10 周茂青;情事變更原則研究[D];廈門大學;2001年
,本文編號:2278152
本文鏈接:http://sikaile.net/falvlunwen/minfalunwen/2278152.html