遼陽(yáng)市湯河溫泉?jiǎng)谀P摒B(yǎng)樓裝修工程進(jìn)度及質(zhì)量管理
[Abstract]:Project schedule management and quality management is the management of the progress, completion deadline and quality of each stage in the implementation of the project by applying the method of project management. The model building decoration project is built by investment of Tanghe spa sanatorium in Liaoyang city. It has high requirements, short construction period, many kinds of professional and technical work, close relationship between each working procedure, short interval period, Basic features such as cross-matching are required. In this paper, the advanced concepts and methods of project schedule and quality management in the theory of project management are applied to scientifically control the progress and quality of the project. According to the characteristics of the project, the design stage, purchasing stage and construction stage in the process of construction are comprehensively analyzed. According to the progress and quality target, parallel construction, "fast path" method, flow construction and other methods are adopted to complete the plan. The use of organizational measures, technical measures, economic measures, contract measures and other means for decorative construction projects progress control and quality management to provide active and effective help, In order to explore an effective decorative engineering project progress and quality control approach.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2010
【分類號(hào)】:F284
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉宏;全凌云;;項(xiàng)目質(zhì)量管理[J];電子質(zhì)量;2008年10期
2 竇曉銳;;監(jiān)理工程師對(duì)施工進(jìn)度的控制[J];黑龍江交通科技;2007年02期
3 陳章六;張愛(ài)花;鐘振華;;企業(yè)與項(xiàng)目的質(zhì)量管理[J];中國(guó)建材科技;2008年04期
4 孫姝芳;淺談監(jiān)理工程師應(yīng)如何抓好施工質(zhì)量的事前控制[J];建設(shè)監(jiān)理;2003年06期
5 宋震;;監(jiān)理工程師在施工進(jìn)度控制中的作用[J];建設(shè)監(jiān)理;2006年05期
6 龍振華;董文平;趙培景;劉宏雷;;淺談施工過(guò)程中監(jiān)理工程計(jì)量中的幾個(gè)問(wèn)題[J];建設(shè)監(jiān)理;2008年03期
7 徐廣;霍巖;高瑩;;建筑工程項(xiàng)目管理中的合同管理[J];建筑設(shè)計(jì)管理;2006年02期
8 白喜平;;談施工項(xiàng)目質(zhì)量管理[J];內(nèi)蒙古科技與經(jīng)濟(jì);2007年20期
9 錢(qián)達(dá)友;;工程項(xiàng)目進(jìn)度管理中的時(shí)間觀[J];四川建筑;2007年03期
10 吉守信;張旭明;;加強(qiáng)全面管理 提高工程質(zhì)量[J];四川建筑;2007年03期
,本文編號(hào):2259036
本文鏈接:http://sikaile.net/wenyilunwen/shinazhuanghuangshejilunwen/2259036.html