天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 碩博論文 > 工程博士論文 >

軟弱覆巖強含水層下綜放開采覆巖運移規(guī)律及水砂防控技術研究

發(fā)布時間:2018-05-23 18:27

  本文選題:含水層 + 綜放開采 ; 參考:《中國礦業(yè)大學》2017年博士論文


【摘要】:敏東一礦首采盤區(qū)覆巖性質及含水層形態(tài)特殊,覆巖偏軟,且含水層多、含水性強,針對性開展軟弱覆巖強含水層下綜放開采覆巖運移規(guī)律及水砂防控技術研究對于保障礦井安全生產、降低開采活動對地表生態(tài)環(huán)境的破壞極為重要。本文在對首采盤區(qū)覆巖含水層富水性評價、覆巖運移規(guī)律及含水層對工作面充水潰砂影響等內容研究的基礎上,建立了適用于敏東一礦及類似條件下礦井工作面的水砂防控技術體系。論文主要研究工作及成果如下:(1)根據地質勘探數(shù)據,評價分析了礦井首采盤區(qū)開采充水水源及含水層富水性,綜合利用地面電法和礦井直流電法對受開采影響的主要含水地層的富水情況進行探測,揭示了敏東一礦強含水層的賦存特征。物探所得結果與實際情況較吻合。(2)運用鉆孔注水法實測得到了敏東一礦首采盤區(qū)覆巖“兩帶”高度,結果表明:垮落帶高度為36.65 m,垮采比為4.76;導水裂縫帶高度為83.78 m,裂采比為10.88。利用實驗室力學性質測試和現(xiàn)場實測數(shù)據對離散元程序UDEC模擬參數(shù)進行校核,反演不同采高時覆巖運移特征及兩帶高度,所得垮采比最大和最小值分別為4.25和3.5,平均3.9;裂采比最大和最小值分別為11和8.1,平均9.3,與現(xiàn)場實測結果較為接近。綜合鉆孔實測和數(shù)值計算分析了敏東一礦軟弱覆巖強含水層下綜放開采覆巖破壞規(guī)律。(3)通過實驗室相似模擬,得到了工作面覆巖導水裂隙發(fā)育規(guī)律,相似模擬所得直接頂初次垮落步距大于現(xiàn)場實測結果,而老頂周期來壓步距與現(xiàn)場實測結果相近。由于相似模型中垮落帶覆巖呈層狀充填采空區(qū),其所得垮落帶和裂隙帶高度均比現(xiàn)場實測結果偏大,通過鋪設散體砂石、預制節(jié)理及增加直接頂強度等方法預處理模型垮落帶內巖層,可有效提高相似模擬結果的可靠性。(4)針對敏東一礦地層巖性及強度特征,開展了0-0.5 mm和0.5-1 mm兩種砂徑骨料的相似模擬試驗,得到了覆巖導水裂隙演化對模型骨料粒徑變化的敏感程度,揭示了軟弱覆巖綜放開采裂隙及應力演化規(guī)律。結果表明,相似材料骨料砂徑越小,其強度越大,隨砂徑增大,相似材料試件破壞由剪切主導型逐漸轉變?yōu)閺埨鲗?砂徑越大,相似模擬中覆巖斷裂步距越小,覆巖裂隙發(fā)育越充分,過小的砂徑反而不利于覆巖導水裂隙演化。(5)構建了敏東一礦軟弱覆巖強含水層及類似條件下綜放開采防治水體系。首先防止含水層潰水、潰砂,其次避免工作面涌水量超限,最后補充頂板水疏降技術;提出了“頂水開采與疏干或疏降開采相結合、先疏后采與邊采邊疏相結合、鉆孔疏干或疏降與回采疏干或疏降相結合、分段控制開采厚度”的防治水總方案,有效保證了礦井的安全綜放開采。
[Abstract]:In Mindong No. 1 Mine, the overlying rock and aquifer form are special, the overburden is soft, the aquifer is abundant, and the water content is strong. It is very important to carry out the study of overburden migration law and water and sand prevention and control technology of fully mechanized caving mining under the strong aquifer of weak overburden rock in order to ensure the safety of mine production and reduce the damage to the surface ecological environment caused by mining activities. Based on the study of the water-rich evaluation of overburden aquifer in the first mining area, the law of overburden rock migration and the influence of the aquifer on the water filling and sand collapsing in the working face, etc. The technical system of water and sand prevention and control is established for Mindong No.1 Mine and similar mining face. The main research work and results are as follows: (1) based on the geological exploration data, this paper evaluates and analyzes the water-filled water source and the water-rich aquifer in the first mining area of the mine. The surface electric method and the mine direct current method are used to detect the water-rich condition of the main water-bearing strata affected by the mining, and the occurrence characteristics of the strong aquifer in Mindong No. 1 Mine are revealed. The geophysical exploration results are in good agreement with the actual situation. (2) the height of overlying rock in the first mining area of Mindong No. 1 Mine has been obtained by using borehole water injection method. The results show that the height of caving zone is 36.65 m, the ratio of collapse to production is 4.76, the height of water-conducting fracture zone is 83.78 m, and the ratio of fracture to production is 10.88. The parameters of discrete element program (UDEC) simulation are checked by laboratory mechanical property test and field measurement data, and the characteristics of overlying rock migration and the height of two zones are inversed when mining height is different. The maximum and minimum ratio of collapse and production are 4.25 and 3.5, respectively, with an average of 3.9, and the maximum and minimum of fracture-production ratio are 11 and 8.1, respectively, with an average of 9.3, which is close to the field measured results. The failure law of overburden rock in fully mechanized caving mining under strong aquifer of weak overburden in Mindong No. 1 Mine is analyzed by comprehensive borehole measurement and numerical calculation. The initial collapse step distance obtained by similar simulation is larger than that of field measurement, but the pressure step distance of main roof cycle is close to that of field measurement. Because the overburden of the caving zone in the similar model is layered filled with goaf, the height of the caving zone and the fissure zone is higher than that of the field measurement. The preprocessing methods such as precast joints and increasing direct top strength can effectively improve the reliability of the similar simulation results in the rock strata in the caving zone.) aiming at the lithology and strength characteristics of Mindong No. 1 mine, the prefabricated joints and other methods can effectively improve the reliability of the similar simulation results. The similarity simulation tests of 0-0.5 mm and 0.5-1 mm sand diameter aggregates are carried out. The sensitivity of the evolution of overburden water-conducting fractures to the change of model aggregate particle size is obtained, and the fracture and stress evolution law of fully mechanized caving mining in weak overburden is revealed. The results show that the smaller the aggregate diameter of similar material is, the greater its strength is, and with the increase of sand diameter, the failure of similar material specimen gradually changes from shear leading type to tension-oriented type, and the larger the sand diameter, the smaller the fracture step distance of overburden rock in similar simulation. The more fully developed overburden fissures, the smaller the sand diameter is, which is not conducive to the evolution of overburden water conductivity fissures.) the strong aquifer of weak overburden rocks in Mindong No. 1 Mine and the water prevention system of fully mechanized caving mining under similar conditions are constructed. First of all, to prevent aquifer from collapsing water and sand, secondly to avoid overflowing water from working face, and finally to supplement roof water thinning and falling technology, and to put forward the "combination of top water mining and draining or thinning mining, first and then mining and edge mining," By combining dryness or thinning of boreholes with dryness or thinning of mining, and controlling mining thickness by stages, the total scheme of water prevention and control can effectively ensure the safety of fully mechanized caving mining in coal mines.
【學位授予單位】:中國礦業(yè)大學
【學位級別】:博士
【學位授予年份】:2017
【分類號】:TD745;TD325

【相似文獻】

相關期刊論文 前10條

1 李劍鋒;東灘礦綜采放頂煤工作面覆巖注漿減沉試驗成功[J];礦山測量;1997年01期

2 傅先杰;特殊推覆體下開采覆巖破壞特性淺析[J];礦業(yè)安全與環(huán)保;2000年S1期

3 傅先杰;特殊推覆體下開采覆巖破壞及其地表沉降特征淺析[J];煤炭科技;2001年03期

4 石文球;特殊推覆體下開采覆巖破壞及其地表沉降特征淺析[J];煤炭技術;2005年08期

5 張華興,張剛艷,許延春;覆巖破壞裂縫探測技術的新進展[J];煤炭科學技術;2005年09期

6 檀雙英;康永華;劉治國;張玉軍;張剛艷;;祁東煤礦綜采覆巖破壞特征[J];煤炭科學技術;2006年09期

7 葛英豪;肖建輝;劉文中;馮士安;;許疃煤礦8223工作面開采覆巖破壞特征的研究[J];煤礦安全;2009年03期

8 王金安;紀洪廣;張燕;;不整合地層下開采覆巖移動變異性研究[J];煤炭學報;2010年08期

9 張玉軍;;鉆孔電視探測技術在煤層覆巖裂隙特征研究中的應用[J];煤礦開采;2011年03期

10 劉凱;;地面電磁法探測覆巖破壞的應用[J];科技資訊;2012年02期

相關會議論文 前10條

1 金洪偉;許家林;朱衛(wèi)兵;;覆巖移動的拱-梁組合結構模型的初步研究[A];自主創(chuàng)新與持續(xù)增長第十一屆中國科協(xié)年會論文集(1)[C];2009年

2 孫如華;李文平;李小琴;;疊加開采頂板覆巖變形破壞研究[A];第八屆全國工程地質大會論文集[C];2008年

3 張慶松;高延法;劉松玉;;覆巖結構破壞度模型及其應用研究[A];中國土木工程學會第九屆土力學及巖土工程學術會議論文集(下冊)[C];2003年

4 楊逾;范學理;劉文生;趙德深;;覆巖離層注漿中注漿量的確定[A];新世紀 新機遇 新挑戰(zhàn)——知識創(chuàng)新和高新技術產業(yè)發(fā)展(下冊)[C];2001年

5 李培現(xiàn);譚志祥;閆麗麗;鄧喀中;;采動覆巖裂隙發(fā)育數(shù)值模擬力學參數(shù)反演[A];巖石力學與工程的創(chuàng)新和實踐:第十一次全國巖石力學與工程學術大會論文集[C];2010年

6 劉昆輪;張傳玖;;寬溝煤礦覆巖活動及應力演化的數(shù)值模擬研究[A];煤炭開采新理論與新技術——中國煤炭學會開采專業(yè)委員會2012年學術年會論文集[C];2012年

7 李剛;梁冰;;采場覆巖層滲流場形成機理及其應用[A];第九屆全國滲流力學學術討論會論文集(二)[C];2007年

8 易德禮;康永華;趙開全;;祁東煤礦高水壓裂隙巖體綜采覆巖破壞規(guī)律研究[A];礦山地質災害成災機理與防治技術研究與應用[C];2009年

9 楊居友;;覆巖(離層)注漿工程自動監(jiān)測系統(tǒng)的研究[A];開灤礦區(qū)采礦技術與實踐文集[C];2009年

10 耿養(yǎng)謀;;礦山開采覆巖應力拱演化規(guī)律研究[A];2009礦山災害預防控制學術研討會論文集[C];2009年

相關博士學位論文 前10條

1 劉生優(yōu);軟弱覆巖強含水層下綜放開采覆巖運移規(guī)律及水砂防控技術研究[D];中國礦業(yè)大學;2017年

2 于輝;近距離煤層開采覆巖結構運動及礦壓顯現(xiàn)規(guī)律研究[D];中國礦業(yè)大學(北京);2015年

3 金志遠;淺埋近距煤層重復擾動區(qū)覆巖導水裂隙發(fā)育規(guī)律及其控制[D];中國礦業(yè)大學;2015年

4 賈凱軍;超高水材料袋式充填開采覆巖活動規(guī)律與控制研究[D];中國礦業(yè)大學;2015年

5 黃剛;羅河鐵礦充填開采覆巖穩(wěn)定性及地表沉降研究[D];北京科技大學;2016年

6 尹士獻;構造應力場與采動應力場協(xié)同作用下對覆巖變形影響研究[D];河南理工大學;2015年

7 安百富;固體密實充填回收房式煤柱圍巖穩(wěn)定性控制研究[D];中國礦業(yè)大學;2016年

8 李西蒙;快速推進長壁工作面覆巖失穩(wěn)運動的動態(tài)時空規(guī)律研究[D];中國礦業(yè)大學;2015年

9 馮美生;淺埋煤層采動覆巖破斷規(guī)律研究[D];遼寧工程技術大學;2014年

10 劉世奇;厚煤層開采覆巖破壞規(guī)律及粘土隔水層采動失穩(wěn)機理研究[D];中國礦業(yè)大學(北京);2016年

相關碩士學位論文 前10條

1 李東雷;深部采煤采動階段覆巖運動規(guī)律及多因素耦合致災機理研究[D];河北工程大學;2015年

2 周璇;采動條件下覆巖地電場響應特征研究[D];中國礦業(yè)大學;2015年

3 陳現(xiàn)輝;大同礦區(qū)雙系煤層開采覆巖大范圍運動規(guī)律及結構特征研究[D];中國礦業(yè)大學;2015年

4 郭金帥;大傾角綜采面覆巖活動規(guī)律研究[D];中國礦業(yè)大學;2015年

5 程晉國;停采線側村莊壓煤采動覆巖隔離注漿充填鉆孔布置的研究[D];中國礦業(yè)大學;2015年

6 劉星輝;覆巖結構大面積異常來壓規(guī)律及巖石聲發(fā)射預測機理探討[D];山東農業(yè)大學;2015年

7 韓佩博;三維采動應力條件下煤層覆巖及底板裂隙場演化規(guī)律與瓦斯運移特征研究[D];重慶大學;2015年

8 劉家云;深部仰斜開采工作面覆巖變形破壞規(guī)律研究[D];太原理工大學;2016年

9 王凱;厚黃土地區(qū)煤礦開采對上覆松散含水層影響的機理研究[D];太原理工大學;2016年

10 鄧康宇;孫疃礦1026孤島采場覆巖運動規(guī)律及礦壓顯現(xiàn)研究[D];安徽理工大學;2016年

,

本文編號:1925846

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/shoufeilunwen/gckjbs/1925846.html


Copyright(c)文論論文網All Rights Reserved | 網站地圖 |

版權申明:資料由用戶4501e***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com
女同伦理国产精品久久久| 亚洲专区中文字幕在线| 大香蕉久久精品一区二区字幕 | 国产麻豆精品福利在线| 午夜精品久久久免费视频| 操白丝女孩在线观看免费高清| 欧美自拍系列精品在线| 精品国产91亚洲一区二区三区| 久久福利视频视频一区二区| 国产又粗又猛又爽色噜噜| 久久国内午夜福利直播| 欧美性高清一区二区三区视频| 成人精品日韩专区在线观看| 国产精品一区二区成人在线| 午夜直播免费福利平台| 熟女中文字幕一区二区三区| 国产又黄又猛又粗又爽的片| 日韩精品一区二区亚洲| 国产精品伦一区二区三区四季| 亚洲一区二区三区国产| 一区二区三区日韩经典| 亚洲精品国产第一区二区多人| 沐浴偷拍一区二区视频| 欧美大黄片在线免费观看| 亚洲最新中文字幕在线视频| 91人妻人人揉人人澡人| 无套内射美女视频免费在线观看| 精品国产品国语在线不卡| 国产欧美日韩综合精品二区| 一区二区三区四区亚洲另类| 亚洲国产av一二三区| 在线免费国产一区二区| 九九热最新视频免费观看| 香蕉久久夜色精品国产尤物| 国内尹人香蕉综合在线| 精品人妻一区二区三区在线看 | 久久本道综合色狠狠五月| 欧美性欧美一区二区三区| 永久福利盒子日韩日韩| 九九热这里有精品20| 国产欧美日韩不卡在线视频|