主井箕斗帶平衡錘提升機(jī)電氣控制系統(tǒng)研究
本文選題:十二脈波整流器 + 礦井提升機(jī); 參考:《北京服裝學(xué)院》2017年碩士論文
【摘要】:鐵礦石開采是國民經(jīng)濟(jì)重要支柱性產(chǎn)業(yè),為繁榮國民經(jīng)濟(jì)作出突出了貢獻(xiàn),而礦井提升機(jī)作為鐵礦石開采運(yùn)輸?shù)难屎碓O(shè)備,自誕生以來,對(duì)提高礦物開采量和開采效率起著舉足輕重的作用。本篇論文是以河北邢臺(tái)中關(guān)鐵礦項(xiàng)目為背景,通過實(shí)際項(xiàng)目調(diào)研,分析現(xiàn)場(chǎng)數(shù)據(jù)參數(shù)進(jìn)行的主井提升機(jī)設(shè)計(jì)。本項(xiàng)目設(shè)計(jì)采用了當(dāng)今先進(jìn)的全數(shù)字直流調(diào)速方案、可靠的可編程邏輯控制系統(tǒng),以及安全的算法邏輯方案,全程以“安全第一”為原則來設(shè)計(jì)硬件結(jié)構(gòu)和控制系統(tǒng),在保證人車安全和優(yōu)異設(shè)計(jì)的基礎(chǔ)上,實(shí)現(xiàn)了節(jié)約成本的目的。論文主要闡述了中關(guān)鐵礦主井提升機(jī)的設(shè)計(jì)參數(shù),分析了提升機(jī)控制系統(tǒng)工藝要求,介紹了提升機(jī)工作流程和控制工藝,介紹了提升機(jī)的速度-行程控原理以及相關(guān)速度計(jì)算和行程計(jì)算,介紹了礦井提升機(jī)的設(shè)備布局方案。在此基礎(chǔ)之上,首先,闡述了十二脈整流器方案原理、諧波分析和處理、整流器參數(shù)設(shè)定值及不同參數(shù)的影響;其次,闡述了礦井提升機(jī)的硬件結(jié)構(gòu)和設(shè)計(jì)原理;再次,闡述了礦井提升機(jī)的工藝算法設(shè)計(jì)原理;最后,闡述了現(xiàn)場(chǎng)調(diào)試的過程和遇到的問題,以及問題的解決方案。另外,在本項(xiàng)目中嘗試了具體工程先采用平臺(tái)仿真,然后分析控制方案可行性,最后將具體設(shè)計(jì)方案應(yīng)用到實(shí)際工程的模式。這種模式不僅節(jié)約了設(shè)計(jì)成本,而且避免了許多現(xiàn)場(chǎng)調(diào)試事故,減少器件損壞數(shù)量,并借助虛擬儀器彌補(bǔ)了設(shè)計(jì)方案的潛在性漏洞,在具體工程項(xiàng)目中效果顯著,F(xiàn)場(chǎng)調(diào)試表明,主井提升機(jī)系統(tǒng)工作可靠、響應(yīng)速度快、控制精度高,能夠完全勝任現(xiàn)場(chǎng)各項(xiàng)工作任務(wù)。
[Abstract]:Iron ore mining is an important pillar industry of the national economy and has made outstanding contributions to the prosperity of the national economy. Since its birth, the mine hoist has been used as a throat equipment for iron ore mining and transportation. It plays an important role in improving mineral exploitation and mining efficiency. Based on the project of Zhongguan Iron Mine in Xingtai, Hebei Province, this paper analyzes the design of main shaft hoist based on actual project investigation and analysis of field data parameters. The design of this project adopts the advanced all digital DC speed regulation scheme, the reliable programmable logic control system, and the safe algorithm logic scheme. The hardware structure and control system are designed based on the principle of "safety first". On the basis of the safety and excellent design of the guarantor, the purpose of cost saving is realized. This paper mainly describes the design parameters of the hoist in the main shaft of Zhongguan Iron Mine, analyzes the technological requirements of the hoist control system, and introduces the work flow and control technology of the hoist. This paper introduces the principle of speed-travel control of hoist, the calculation of relative speed and stroke, and the layout scheme of mine hoist. On this basis, firstly, the principle of the 12-pulse rectifier scheme, harmonic analysis and treatment, the parameter setting value of the rectifier and the influence of different parameters are expounded. Secondly, the hardware structure and design principle of the mine hoist are expounded. Thirdly, The design principle of technological algorithm for mine hoist is expounded, and finally, the process of field debugging, the problems encountered and the solutions to the problems are expounded. In addition, the platform simulation is used in the project, and then the feasibility of the control scheme is analyzed. Finally, the concrete design scheme is applied to the actual engineering mode. This mode not only saves the design cost, but also avoids many on-site debugging accidents, reduces the number of device damage, and makes up the potential loophole of the design scheme with the help of virtual instrument. Field debugging shows that the main shaft hoist system is reliable, fast response, high control precision, and can be fully competent for all kinds of work tasks in the field.
【學(xué)位授予單位】:北京服裝學(xué)院
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TD633;TP273
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 沈力民;平煤集團(tuán)五礦主井提升機(jī)故障處理分析[J];礦山機(jī)械;2005年09期
2 陳艷新;李克清;;主井提升機(jī)的數(shù)字化、網(wǎng)絡(luò)化改造[J];工礦自動(dòng)化;2006年04期
3 王峰;何鳳有;郭峰;;主井提升機(jī)系統(tǒng)的數(shù)字化與信息化改造[J];煤礦機(jī)械;2008年04期
4 張方成;;安慶銅礦主井提升機(jī)主軸裝置的改造實(shí)踐[J];礦山機(jī)械;2012年07期
5 程配稷,甘登俐;更換主井提升機(jī)的幾種方式[J];煤礦設(shè)計(jì);1998年08期
6 李良曙,趙輝;棗莊局柴里礦主井提升機(jī)電控改造簡(jiǎn)介[J];煤礦設(shè)計(jì);1999年09期
7 潘龍剛;郭本利;;新田嶺鎢礦主井提升機(jī)電控及設(shè)備布置設(shè)計(jì)[J];現(xiàn)代礦業(yè);2014年01期
8 趙春祥,馬德國,楊喜盛;主井提升機(jī)電控低頻電源的技術(shù)改造[J];有色冶金節(jié)能;2001年01期
9 雷雨;主井提升機(jī)滿倉保護(hù)改造[J];煤礦機(jī)械;2002年10期
10 馮舒,張瑩,李金海,田玉杲;主井提升機(jī)提升能力的改造[J];煤礦安全;2003年05期
相關(guān)會(huì)議論文 前6條
1 王磊;劉亞偉;周俊杰;;矢量控制技術(shù)在車集礦主井提升機(jī)上的應(yīng)用[A];第十一屆全國煤礦自動(dòng)化學(xué)術(shù)年會(huì)論文專輯[C];2001年
2 馬德國;印德惠;;主井提升機(jī)運(yùn)行電控系統(tǒng)技術(shù)改造問題[A];第六屆全國采礦學(xué)術(shù)會(huì)議論文集[C];1999年
3 王廣祿;陳有力;李輝;高洪強(qiáng);吳國義;劉洋;張衛(wèi)星;;西馬礦主井提升機(jī)電控系統(tǒng)的轉(zhuǎn)子變頻應(yīng)用[A];第22屆全國煤礦自動(dòng)化與信息化學(xué)術(shù)會(huì)議暨第4屆中國煤礦信息化與自動(dòng)化高層論壇論文集[C];2012年
4 周德順;宋利;李曄;張維可;王軍;佟志強(qiáng);王重;;基于OPC通訊技術(shù)的主井提升機(jī)遠(yuǎn)程監(jiān)控系統(tǒng)[A];第22屆全國煤礦自動(dòng)化與信息化學(xué)術(shù)會(huì)議暨第4屆中國煤礦信息化與自動(dòng)化高層論壇論文集[C];2012年
5 林如山;;DCS600在梅山1號(hào)主井提升機(jī)中的應(yīng)用[A];第八屆全國采礦學(xué)術(shù)會(huì)議論文集[C];2009年
6 李守渠;辛芳;;大平煤業(yè)主井提升機(jī)電控自動(dòng)化變頻改造[A];第23屆全國煤礦自動(dòng)化與信息化學(xué)術(shù)會(huì)議暨第5屆中國煤礦信息化與自動(dòng)化高層論壇論文集[C];2013年
相關(guān)重要報(bào)紙文章 前1條
1 陳平;朱莊礦主井提升機(jī)智能化[N];中國煤炭報(bào);2000年
相關(guān)碩士學(xué)位論文 前1條
1 夏近洋;主井箕斗帶平衡錘提升機(jī)電氣控制系統(tǒng)研究[D];北京服裝學(xué)院;2017年
,本文編號(hào):1835066