rock mechanics high geostress area HC method optimization pr
本文關(guān)鍵詞:高地應(yīng)力區(qū)水電工程圍巖分類(lèi)法系統(tǒng)研究,由筆耕文化傳播整理發(fā)布。
高地應(yīng)力區(qū)水電工程圍巖分類(lèi)法系統(tǒng)研究
A CLASSIFICATION METHOD OF SURROUNDING ROCK MASS IN HYDROPOWER PROJECT IN HIGH GEOSTRESS AREA
[1] [2] [3] [4] [5] [6]
SHEN Yanjun,XU Guangli,SONG Shengwu,LI Zhipeng,FENG Xuemin,DONG Jiaxing (1. College of Architecture and Civil Engineering, Xi'an University of Science and Technology, Xi' an , S
[1]西安科技大學(xué)建筑與土木工程學(xué)院,陜西西安710054; [2]中國(guó)地質(zhì)大學(xué)巖土鉆掘與防護(hù)教育部工程研究中心,湖北武漢430074; [3]中國(guó)電建集團(tuán)成都勘測(cè)設(shè)計(jì)研究院有限公司,四川成都610072; [4]昆明理工大學(xué)電力工程學(xué)院,云南昆明650500
文章摘要:高地應(yīng)力區(qū)大型水電硐室圍巖工程地質(zhì)特征較一般地應(yīng)力狀態(tài)下差異很大,相應(yīng)圍巖分類(lèi)評(píng)價(jià)思路及體系應(yīng)有所差異,但目前水電工程圍巖分類(lèi)法(簡(jiǎn)稱(chēng)HC法)對(duì)評(píng)價(jià)高地應(yīng)力區(qū)尚存在諸多缺陷,造成評(píng)價(jià)結(jié)果與真實(shí)情況存在一定差距。以高地應(yīng)力區(qū)HC法合理應(yīng)用為研究目的,首先,對(duì)該方法存在諸多問(wèn)題全面分析,并提出相應(yīng)修正建議;其次,通過(guò)廣泛搜集、整理目前大型水電工程地應(yīng)力狀況資料,對(duì)地應(yīng)力分類(lèi)評(píng)價(jià)指標(biāo)及標(biāo)準(zhǔn)提出新的建議;而后,針對(duì)HC法對(duì)高地應(yīng)力區(qū)的評(píng)價(jià)思路與方法進(jìn)行優(yōu)化,提出相應(yīng)優(yōu)化方法;最后,以在建的猴子巖水電站主廠房為分析實(shí)例,采用對(duì)比分析方法印證該優(yōu)化方法的適宜性。該研究方法對(duì)于推動(dòng)HC法滿(mǎn)足高地應(yīng)力區(qū)地下硐室圍巖質(zhì)量評(píng)價(jià)具有一定參考意義。
Abstr:The engineering geological characteristics of the surrounding rock of large hydropower caverns in high geostress areas are very different from those in the normal geostress area. So the rock classification and evaluation system should be different. However,the hydropower classification(HC) method of rock mass for evaluating the rocks in high geostress areas has still many defects,and has caused some deviations between the evaluated results and the real situations. The purpose of this paper is to correct and optimize the HC method in high geostress areas. Firstly,the problems existed in the HC method were analyzed comprehensively,and some appropriate amendments were proposed. Secondly,some new proposals for ground stress evaluation and classification criteria were proposed through extensive collecting and collating of the information of high geostress of the current large-scale hydropower projects. Then,the evaluation ideas and methods of HC for high geostress areas were optimized systematically and the corresponding methods of optimization were proposed. Finally,the plant of Houziyan hydropower station under construction was analyzed,and the comparative analysis was made to confirm the suitability of this optimization method.
文章關(guān)鍵詞:
Keyword::rock mechanics high geostress area HC method optimization proposals Houziyan hydropower station
課題項(xiàng)目:國(guó)家自然科學(xué)基金資助項(xiàng)目(41302228); 陜西省重點(diǎn)科技創(chuàng)新團(tuán)隊(duì)項(xiàng)目(2014KCT–30); 中國(guó)博士后科學(xué)基金面上項(xiàng)目(2014T70931)
作者信息:會(huì)員可見(jiàn)
本文關(guān)鍵詞:高地應(yīng)力區(qū)水電工程圍巖分類(lèi)法系統(tǒng)研究,,由筆耕文化傳播整理發(fā)布。
本文編號(hào):179539
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/179539.html