耦合S曲線和貝葉斯網(wǎng)絡(luò)的水利工程成本-進(jìn)度仿真分析及應(yīng)用
發(fā)布時(shí)間:2018-03-16 19:19
本文選題:工程仿真 切入點(diǎn):S曲線 出處:《中國農(nóng)村水利水電》2017年10期 論文類型:期刊論文
【摘要】:針對工程施工成本優(yōu)化與進(jìn)度風(fēng)險(xiǎn)分析問題,提出了耦合S曲線和貝葉斯網(wǎng)絡(luò)的施工成本-進(jìn)度仿真分析方法。根據(jù)成本-進(jìn)度S曲線對施工成本進(jìn)行優(yōu)化與控制;利用貝葉斯風(fēng)險(xiǎn)分析方法研究小型水利工程因工期短而普遍存在的進(jìn)度風(fēng)險(xiǎn)問題,通過貝葉斯網(wǎng)絡(luò)對進(jìn)度風(fēng)險(xiǎn)的敏感性分析確定關(guān)鍵進(jìn)度風(fēng)險(xiǎn)因素,為工程施工成本與進(jìn)度管理提供有力依據(jù)。該方法成功應(yīng)用于某河渠防護(hù)工程中,河渠防護(hù)工程成本優(yōu)化及關(guān)鍵進(jìn)度風(fēng)險(xiǎn)因素的確定為施工成本與進(jìn)度定量分析提供有效支持。
[Abstract]:In order to solve the problem of engineering construction cost optimization and schedule risk analysis, a method of coupling S curve and Bayesian network is put forward. The construction cost is optimized and controlled according to the cost schedule S curve. Bayesian risk analysis method is used to study the schedule risk of small water conservancy projects because of the short construction period, and the key schedule risk factors are determined by the sensitivity analysis of Bayesian network to schedule risk. This method has been successfully applied to a river canal protection project. The optimization of channel protection project cost and the determination of key schedule risk factors provide effective support for quantitative analysis of construction cost and schedule.
【作者單位】: 天津大學(xué)水利工程仿真與安全國家重點(diǎn)實(shí)驗(yàn)室;廊坊市水務(wù)局;
【分類號】:TV51
【相似文獻(xiàn)】
相關(guān)期刊論文 前4條
1 王卓甫,楊志勇,楊建基;水利水電工程施工進(jìn)度風(fēng)險(xiǎn)規(guī)定下的投資優(yōu)化[J];河海大學(xué)學(xué)報(bào)(自然科學(xué)版);2000年06期
2 王卓甫,歐陽紅祥,李紅仙;水利水電施工搭接網(wǎng)絡(luò)進(jìn)度風(fēng)險(xiǎn)計(jì)算[J];水利學(xué)報(bào);2003年01期
3 歐陽斌,王琳,黃敬東;港口工程進(jìn)度風(fēng)險(xiǎn)分析研究[J];水運(yùn)工程;2005年01期
4 李果;強(qiáng)茂山;;利用S曲線模型分析水利工程資金流[J];水力發(fā)電學(xué)報(bào);2011年04期
,本文編號:1621300
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1621300.html
最近更新
教材專著