延煉S-Zorb催化汽油吸附脫硫裝置項目投資控制研究
發(fā)布時間:2018-06-26 19:38
本文選題:S-Zorb項目 + 投資控制。 參考:《西安石油大學(xué)》2015年碩士論文
【摘要】:石油化工工程有效控制建設(shè)投資,提高投資效益是當(dāng)前石油化工產(chǎn)業(yè)的重要問題。本論文緊密結(jié)合我國石油化工工程建設(shè)投資管理體制和延長石油集團(tuán)180萬噸/年S-Zorb催化汽油吸附脫硫裝置項目工程實際,對其投資控制進(jìn)行了比較深入的探討和研究。主要研究內(nèi)容如下:在項目前期決策階段,利用工程經(jīng)濟(jì)評價的方法進(jìn)行初步設(shè)計方案的優(yōu)選,從工程建設(shè)的規(guī)模、效益、安全、環(huán)保四個方面評價方案的功能,并結(jié)合方案的成本進(jìn)行綜合分析論證,選擇合理的優(yōu)化設(shè)計方案,為項目全壽命周期投資控制奠定了良好的基礎(chǔ)。在施工準(zhǔn)備階段,結(jié)合工程實際特點,采用施工總承包的承包模式,并通過計價費率招標(biāo)、合同控制乙供材料的方法,控制合同價格,以達(dá)到進(jìn)一步有效控制工程投資的目的。在施工階段,通過編制資金使用計劃、控制采購過程、控制工程計量、支付、工程變更、索賠以及工程風(fēng)險管理與控制等方法,有效控制施工階段的投資額。在工程竣工階段,對整個項目的設(shè)計、招投標(biāo)及施工過程的投資控制效果進(jìn)行了分析和評價,總結(jié)本論文研究成果,為后續(xù)工程積累經(jīng)驗。
[Abstract]:The effective control of the investment in the construction of petrochemical engineering and the improvement of the investment benefit are the important problems in the current petrochemical industry. In this paper, the investment control of the petrochemical engineering construction investment management system and the 1 million 800 thousand ton / year S-Zorb catalytic gasoline sorption desulfurization unit project are closely combined in our country. The main research contents are as follows: in the early decision stage of the project, the preliminary design scheme is optimized by the method of engineering economic evaluation, the function of the project is evaluated from four aspects of the scale, benefit, safety and environmental protection of the project, and the comprehensive analysis and demonstration are carried out in combination with the cost of the project, and the rational optimization design is selected. The scheme has laid a good foundation for the project full life cycle investment control. In the construction preparation stage, combined with the actual characteristics of the project, the contract mode of the construction general contract is adopted, and the price of the contract is controlled by the valuation rate for the method of controlling the contract price, so as to achieve the purpose of further effective control of the project investment. Section, through the preparation of the fund use plan, control the procurement process, control engineering measurement, payment, engineering change, claim and engineering risk management and control methods, effectively control the investment in the construction stage. In the completion stage of the project, the overall project design, bidding and construction process of the investment control effect was analyzed and evaluated. Conclusion the research results of this thesis will accumulate experience for subsequent projects.
【學(xué)位授予單位】:西安石油大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TE96;F426.72
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 羅胤;;淺析工程設(shè)計階段的投資控制[J];中國資源綜合利用;2013年06期
2 蔡兆霖;關(guān)于建立投資控制系統(tǒng)的探討[J];煤礦設(shè)計;1988年02期
3 楊天金,,高澤林;對改擴(kuò)建礦井投資控制的體會[J];建井技術(shù);1993年05期
4 陳明明;施工階段的建設(shè)監(jiān)理與投資控制[J];有色金屬設(shè)計;1998年03期
5 彭艷;;海上工程項目平臺建造中的投資控制研究[J];行政事業(yè)資產(chǎn)與財務(wù);2014年15期
6 吳為群,朱正華;淺談監(jiān)理中的投資控制[J];西部探礦工程;2001年S1期
7 陳敏;400億元投資控制三峽污染[J];w攣胖蕓
本文編號:2071181
本文鏈接:http://sikaile.net/kejilunwen/shiyounenyuanlunwen/2071181.html
最近更新
教材專著