爆破振動下埋地天然氣管道工況參數(shù)對管土振動特征的影響分析
本文選題:埋地天然氣管道 + 隧道爆破振動。 參考:《西南交通大學(xué)》2017年碩士論文
【摘要】:管道運輸是五大輸運方法之一,埋地管道以其運輸?shù)慕?jīng)濟(jì)和高效性被用于長距離輸送天然氣。隨著我國各地基礎(chǔ)設(shè)施的建設(shè),爆破技術(shù)已廣泛應(yīng)用于隧道、路基等工程開挖施工中,爆破產(chǎn)生的地震效應(yīng)可能對附近埋地管道安全構(gòu)成影響。因此,有必要進(jìn)行爆破地震作用下埋地管道及其地表的振動特征相關(guān)研究,為優(yōu)化爆破參數(shù)和建立爆破振動監(jiān)測標(biāo)準(zhǔn)以確保埋地管道安全運行提供理論基礎(chǔ)。以下穿蘭成渝埋地天然氣管道的西成客運專線仙女巖隧道出口段掘進(jìn)爆破工程為背景,建立包含管道、巖石、土體、天然氣和炸藥在內(nèi)的三維動力有限元計算模型,在驗證模型計算結(jié)果的準(zhǔn)確性基礎(chǔ)上,分析爆破振動下埋地天然氣管道的管徑、壁厚和埋深等參數(shù)對管道及地表振動特征和管道Von-Mises應(yīng)力的影響規(guī)律。按照現(xiàn)場管道與隧道的位置關(guān)系、工程地質(zhì)和爆破條件建立的三維動力有限元數(shù)值計算模型能較好地模擬管道及其地表的振動狀態(tài),其模擬得到的地震波形與相應(yīng)位置處的實測地震波具有較高的相似度,振動強度計算值與實測值的相對誤差小于11%。當(dāng)隧道埋深41.5m、隧道爆破的當(dāng)量裝藥量25kg時,巖體質(zhì)點的豎向振速隨著與爆源距離的增大而減小,且表現(xiàn)為距爆源越遠(yuǎn)、其衰減越為緩慢,在爆源上方巖土界面處的振動速度衰減至3cm/s左右;土體振速分別在管道附近以及地表存在兩個極值點。進(jìn)一步分析不同管徑、壁厚和埋深等參數(shù)時的管道與土體的動力響應(yīng)結(jié)果發(fā)現(xiàn),管道壁厚增加,管道質(zhì)點峰值振速減小,而地表土體的振速基本不變;隨著管道內(nèi)徑增加,管道的質(zhì)點峰值振速增加,地表振速也隨之減小;相同管道內(nèi)壓下管徑與壁厚的比值對于管道的Von-Mises應(yīng)力具有較大影響,管道埋深的影響則基本沒有;管道埋深增大,管道質(zhì)點峰值振速減小,但管道上方地表土體質(zhì)點的振速增大。
[Abstract]:Pipeline transportation is one of the five major transportation methods. Buried pipeline is used for long distance transportation of natural gas because of its economy and efficiency. With the construction of infrastructure in various parts of China, blasting technology has been widely used in the excavation of tunnels, subgrade and other projects. The seismic effect caused by blasting may affect the safety of buried pipelines nearby. Therefore, it is necessary to study the vibration characteristics of buried pipeline and its surface under blasting earthquake, so as to provide a theoretical basis for optimizing blasting parameters and establishing blasting vibration monitoring standard to ensure the safe operation of buried pipeline. Under the background of the blasting project of Xianyan Tunnel exit section of Xiancheng passenger dedicated Line, which passes through Lanzhou-Chengdu-Chongqing buried natural gas pipeline, a three-dimensional dynamic finite element calculation model including pipeline, rock, soil, natural gas and explosives is established. Based on the veracity of the model, the influence of pipe diameter, wall thickness and buried depth of buried natural gas pipeline under blasting vibration on the characteristics of pipeline and surface vibration and the Von-Mises stress of pipeline are analyzed. According to the location relationship between pipeline and tunnel, the 3D dynamic finite element numerical model established by engineering geology and blasting condition can simulate the vibration state of pipeline and its surface. The simulated seismic waveform has a high similarity with the measured seismic wave at the corresponding position, and the relative error between the calculated value of vibration intensity and the measured value is less than 11%. When the tunnel depth is 41.5 m and the equivalent charge of tunnel blasting is 25kg, the vertical vibration velocity of the rock mass decreases with the increase of the distance between the rock mass and the detonation source, and the further away from the detonation source, the slower the attenuation is. The vibration velocity at the interface of the rock and soil over the explosion source attenuates to about 3cm/s, and there are two extremum points in the vicinity of the pipeline and on the surface of the soil respectively. Through further analysis of the dynamic response of pipeline and soil with different pipe diameter, wall thickness and buried depth, it is found that the peak vibration velocity of pipe particle decreases with the increase of pipe wall thickness, while the vibration velocity of surface soil is basically unchanged. With the increase of peak particle velocity, the surface vibration velocity also decreases. The ratio of pipe diameter to wall thickness under the same pressure has a great effect on the Von-Mises stress of the pipeline, but the influence of the buried depth of the pipeline is almost no; the buried depth of the pipeline increases. The peak vibration velocity of the pipe particle decreases, but the vibration velocity of the topsoil over the pipeline increases.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TE973
【相似文獻(xiàn)】
相關(guān)期刊論文 前9條
1 易長平;盧文波;賀學(xué)文;;埋深對圓形洞室爆破臨界破壞振速的影響研究[J];武漢理工大學(xué)學(xué)報;2006年12期
2 王民壽,郭慶海;用雙隨機變量回歸改進(jìn)爆破振速回歸分析[J];爆炸與沖擊;1998年03期
3 陳壽如,宋光明;確定露天邊坡爆破震動臨界振速的一種方法[J];礦業(yè)研究與開發(fā);2001年S1期
4 劉松;黎勝;趙德有;;基于相位共軛方法識別結(jié)構(gòu)表面法向振速[J];中國艦船研究;2011年04期
5 張光權(quán);吳春平;施俊健;陶鐵軍;;金屬礦山臺階爆破振速預(yù)測研究[J];中國礦業(yè);2012年05期
6 柯吉懇;許德民;;振速計算中藥量指數(shù)的探討[J];金屬礦山;1982年02期
7 季月倫;牛尾巴隧道機動車道爆破振動觀測[J];爆破;1995年01期
8 張杰濤,汪建中,郭學(xué)彬;爆區(qū)附近巖土質(zhì)點振動的測試與分析[J];安全與環(huán)境學(xué)報;2003年02期
9 ;[J];;年期
相關(guān)會議論文 前1條
1 劉晶;莊金釗;馮林梅;劇錦三;;爆破振動對既有巖石巷道的影響研究[A];北京力學(xué)會第20屆學(xué)術(shù)年會論文集[C];2014年
相關(guān)碩士學(xué)位論文 前9條
1 李浩彬;施工爆破對既有病害隧道的振動響應(yīng)規(guī)律及安全控制技術(shù)研究[D];西南交通大學(xué);2015年
2 周剛;隧道爆破振動對天然氣管道影響規(guī)律研究[D];西南交通大學(xué);2016年
3 夏昌猛;新建隧道爆破震動對既有平行隧道影響研究[D];重慶交通大學(xué);2016年
4 舒懿東;爆破振動下埋地天然氣管道工況參數(shù)對管土振動特征的影響分析[D];西南交通大學(xué);2017年
5 劉朋;隧道與地下工程鉆爆法施工圍巖破壞臨界振速計算方法研究[D];北京交通大學(xué);2015年
6 郭新新;密集居民區(qū)城市隧道爆破施工對周邊構(gòu)筑物的振動響應(yīng)規(guī)律及安全控制技術(shù)研究[D];西南交通大學(xué);2014年
7 王鑫堯;城區(qū)基坑開挖逐孔起爆振動效應(yīng)與控制研究[D];昆明理工大學(xué);2014年
8 張振;大跨度淺埋隧道下穿文保建筑群爆破減震技術(shù)研究[D];合肥工業(yè)大學(xué);2014年
9 崔啟文;工業(yè)廠房的防振設(shè)計[D];河北工程大學(xué);2013年
,本文編號:1832458
本文鏈接:http://sikaile.net/kejilunwen/shiyounenyuanlunwen/1832458.html