D90半潛鉆井平臺建造項(xiàng)目復(fù)盤研究

發(fā)布時間:2018-02-21 08:26

  本文關(guān)鍵詞: 項(xiàng)目評價(jià) 項(xiàng)目復(fù)盤 進(jìn)度 成本 出處:《青島大學(xué)》2017年碩士論文 論文類型:學(xué)位論文


【摘要】:項(xiàng)目管理是每個項(xiàng)目重要的管理手段,項(xiàng)目評價(jià)作為項(xiàng)目管理全生命周期管理中最后一個環(huán)節(jié),是一個項(xiàng)目的結(jié)束,也意味著一個項(xiàng)目的開始?偨Y(jié)前序項(xiàng)目不足,找出風(fēng)險(xiǎn)點(diǎn),在后續(xù)項(xiàng)目中進(jìn)行風(fēng)險(xiǎn)規(guī)避。項(xiàng)目復(fù)盤是項(xiàng)目評價(jià)的一種方式,在建造超深水鉆井平臺方面,尤其是D90項(xiàng)目屬于一系列建造項(xiàng)目方面,運(yùn)用項(xiàng)目復(fù)盤顯得尤為重要。該論文從D90半潛鉆井平臺建造項(xiàng)目復(fù)盤研究入手,從進(jìn)度、成本兩條主線貫穿全文首先介紹項(xiàng)目復(fù)盤的相關(guān)理論基礎(chǔ),然后針對D90項(xiàng)目過程中進(jìn)行進(jìn)度復(fù)盤,主要包括項(xiàng)目進(jìn)度現(xiàn)狀,項(xiàng)目計(jì)劃和實(shí)際比較,項(xiàng)目挑戰(zhàn)綜述,拖期事件分析,采取措施,進(jìn)度提升事件,復(fù)盤總結(jié)等方面。再對D90項(xiàng)目過程中成本進(jìn)行復(fù)盤。通過項(xiàng)目復(fù)盤對技術(shù)、生產(chǎn)、采購等部門提出建議和要求。最后總結(jié)降成本、提高效率、縮短周期的機(jī)制和方法。理論結(jié)合實(shí)際識別項(xiàng)目風(fēng)險(xiǎn),采用前后對比方法對項(xiàng)目已經(jīng)實(shí)施部分產(chǎn)生的實(shí)際效果與決策時期的計(jì)劃目標(biāo)比較,找出風(fēng)險(xiǎn)點(diǎn),為優(yōu)化管理資源與后期風(fēng)險(xiǎn)規(guī)避提供了依據(jù)。從D90 1#項(xiàng)目的全生命周期管理的過程中可以得出一系列項(xiàng)目的全周期管理模式,可以有效的預(yù)防和有針對性的采取措施,使項(xiàng)目的順利完成交付。通過對相同項(xiàng)目的全生命周期的檢查,識別風(fēng)險(xiǎn)控制已發(fā)生或者潛在發(fā)生的控制缺陷,作為下一個相同項(xiàng)目或者類似項(xiàng)目的風(fēng)險(xiǎn)預(yù)防的有力經(jīng)驗(yàn)。制定理論與企業(yè)實(shí)際項(xiàng)目相匹配的防范措施,為項(xiàng)目進(jìn)度和成本進(jìn)行分類分級管理,體現(xiàn)項(xiàng)目評價(jià)管理的最重要價(jià)值。
[Abstract]:Project management is an important management tool for every project. As the last link in the whole life cycle management of project management, project evaluation is the end of a project, which also means the beginning of a project. Identify risk points and risk aversion in subsequent projects. Project review is a way of project evaluation. In the construction of ultra-deep water drilling platforms, especially the D90 project, which is a series of construction projects, The application of project review is particularly important. This paper starts with the retrospect research of D90 semi-submersible drilling platform construction project, and introduces the relevant theoretical basis of project review from two main lines of schedule and cost. Then review the progress of the D90 project, including the status of the project progress, project planning and actual comparison, project challenges summary, analysis of delayed events, take measures, progress improvement events, Review and summarize. Then review the cost of D90 project. Through the project review to the technical, production, procurement and other departments put forward suggestions and requirements. Finally, summarize the cost reduction, improve efficiency, The mechanism and method of shortening the period. The theory combines with the practice to identify the project risk, and to compare the actual effect of the implemented part of the project with the planning goal in the decision-making period, and find out the risk point. From the whole life cycle management process of D901# project, we can get the whole cycle management model of a series of projects, which can effectively prevent and take targeted measures. Make the project complete and deliver smoothly. By examining the entire life cycle of the same project, identify control defects that have occurred or are potentially occurring in risk control, As a strong experience in risk prevention for the next same project or similar project. Formulate preventive measures that match the theory with the actual project of the enterprise, and manage the progress and cost of the project in a classified and hierarchical manner, Reflect the most important value of project evaluation management.
【學(xué)位授予單位】:青島大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TE52

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 王萌萌;史慕天;;城市軌道交通科研項(xiàng)目評價(jià)方法研究[J];都市快軌交通;2015年04期

2 楊奕;;復(fù)盤:行動學(xué)習(xí)的利器[J];銷售與市場(評論版);2015年06期

3 張朝陽;;關(guān)于衛(wèi)生項(xiàng)目評價(jià)應(yīng)用思考[J];中國衛(wèi)生政策研究;2014年10期

4 張宗理;陳承凱;;復(fù)盤在培訓(xùn)項(xiàng)目管理中的應(yīng)用[J];經(jīng)營管理者;2014年15期

5 柳傳志;;復(fù)盤是最好的學(xué)習(xí)方式[J];中國人力資源開發(fā);2013年24期

6 孟慶軍;蔣勤勤;;基于層次分析法的中小企業(yè)私募股權(quán)投資的項(xiàng)目評價(jià)研究[J];項(xiàng)目管理技術(shù);2013年12期

7 ;柳傳志:聯(lián)想的復(fù)盤[J];中國人力資源開發(fā);2013年12期

8 張小平;;戰(zhàn)略“復(fù)盤”:找到正確的方向[J];董事會;2012年04期

9 周援軍;;基于AHP-RE賦權(quán)和灰色理論的經(jīng)濟(jì)適用房項(xiàng)目評價(jià)研究[J];科技管理研究;2011年09期

10 亓春紅;;國民經(jīng)濟(jì)評價(jià)在項(xiàng)目評價(jià)中的作用[J];現(xiàn)代商業(yè);2010年20期

相關(guān)碩士學(xué)位論文 前4條

1 李桂林;項(xiàng)目評價(jià)在河南電力營銷技術(shù)支持系統(tǒng)中的應(yīng)用[D];華北電力大學(xué)(北京);2011年

2 佘金龍;基于循環(huán)經(jīng)濟(jì)的公路項(xiàng)目評價(jià)[D];長安大學(xué);2010年

3 焦會麗;社會科學(xué)研究中的定性與定量問題[D];山西大學(xué);2009年

4 高偉;企業(yè)信息化績效評價(jià)體系分析[D];北京交通大學(xué);2007年



本文編號:1521481

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/shiyounenyuanlunwen/1521481.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶c74cc***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com