建筑工程前期階段造價(jià)的控制與管理
發(fā)布時(shí)間:2018-04-03 03:11
本文選題:建筑工程 切入點(diǎn):造價(jià) 出處:《科技與企業(yè)》2016年08期
【摘要】:造價(jià)控制與管理是建筑工程開展前的重要內(nèi)容,如果工程造價(jià)不合理,不僅阻礙建筑工程的順利進(jìn)行,而且會(huì)損害建筑企業(yè)的經(jīng)濟(jì)效益,因此,對(duì)工程前期造價(jià)進(jìn)行合理控制和管理至關(guān)重要。雖然我建筑工程行業(yè)規(guī)范已逐步完善,但是在實(shí)際情況中,很多制度規(guī)范已經(jīng)難以適應(yīng)社會(huì)的發(fā)展形勢(shì),而且有關(guān)部門執(zhí)行不力,一些建筑企業(yè)又不具有較好的工程造價(jià)管理意識(shí),致使建筑工程的開展出現(xiàn)了較多問題。本文主要對(duì)建筑工程前期階段造價(jià)的控制與管理進(jìn)行分析,提出了一些建議。
[Abstract]:Cost control and management is an important content before the construction project is carried out. If the construction cost is unreasonable, it will not only hinder the smooth progress of the construction project, but also damage the economic benefits of the construction enterprise.It is very important to control and manage the construction cost reasonably.Although the code of our construction engineering industry has been gradually improved, in the actual situation, many institutional norms have become difficult to adapt to the development of society, and the relevant departments have not implemented them well.Some construction enterprises do not have a good sense of project cost management, resulting in a lot of problems in the development of construction engineering.This paper mainly analyzes the cost control and management in the early stage of construction engineering, and puts forward some suggestions.
【作者單位】: 河北興冀工程項(xiàng)目管理有限公司;
【分類號(hào)】:TU723.3
【相似文獻(xiàn)】
相關(guān)期刊論文 前5條
1 李艷云;;建筑工程項(xiàng)目前期投資估算的重要性研究[J];山西建筑;2014年21期
2 彭壽長;;市政道路工程前期階段快速組價(jià)方法與動(dòng)態(tài)調(diào)整[J];鐵路工程造價(jià)管理;2012年02期
3 徐宏燕;;淺談全過程工程造價(jià)的管理及控制[J];科技與企業(yè);2014年05期
4 于o';云南臨滄第三系硅藻土的研究[J];云南建材;1989年01期
5 ;[J];;年期
相關(guān)碩士學(xué)位論文 前1條
1 黃志挺;建筑工程前期階段造價(jià)的控制與管理[D];浙江大學(xué);2013年
,本文編號(hào):1703351
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/1703351.html
最近更新
教材專著