海外資源嚴重匱乏地區(qū)大體積混凝土澆筑施工技術(shù)淺談
本文關(guān)鍵詞: 大體積混凝土 澆筑 資源匱乏 施工技術(shù) 出處:《施工技術(shù)》2014年S2期 論文類型:期刊論文
【摘要】:印尼公主港煙囪基礎(chǔ)共計5 460m3,設(shè)計要求一次澆筑完成,不留置施工縫,施工難度大,給施工組織管理提出較高要求,而且當(dāng)?shù)刭Y源嚴重匱乏,在這樣惡劣的環(huán)境下通過因地制宜的施工組織,挖掘當(dāng)?shù)噩F(xiàn)有的資源條件,終于澆筑完畢,經(jīng)檢測后質(zhì)量優(yōu)良,深受業(yè)主的好評。
[Abstract]:The chimney foundation of princesses port in Indonesia is 5 460m 3 in total. The design requires the completion of one-time construction without retaining the construction joint, the construction is very difficult, the construction organization and management are required to be higher, and the local resources are in serious shortage. In such a harsh environment through the construction organization according to local conditions, excavating the existing local resources conditions, finally finished pouring, after testing the quality of good, well received by the owners.
【作者單位】: 上海電氣電站集團工程公司;
【分類號】:TU755
【正文快照】: 1工程概況印尼公主港3×350MW燃煤機組是2007年印尼政府為解決全國嚴重的用電缺口,利用中國政府提供融資興建10 000MW一攬子燃煤電站項目中單筆金額最大的一個。由上海電氣(SEC)EPC總承包管理。其中煙囪基礎(chǔ)直徑約45.6m,高5.0m,近似圓臺結(jié)構(gòu),混凝土體積共計5 460m3,設(shè)計要求一
【共引文獻】
相關(guān)期刊論文 前10條
1 吳建紅;馮光榮;羅啟名;;西藏建銀大廈轉(zhuǎn)換層模板施工方案及分析[J];四川建筑科學(xué)研究;2006年03期
2 翟國政;焦雷;盛文考;;防射線大體積混凝土施工技術(shù)[J];四川建筑科學(xué)研究;2007年01期
3 朱凱;何平;;某大體積筏板基礎(chǔ)混凝土施工溫度的控制[J];四川建筑科學(xué)研究;2008年04期
4 劉桐;劉友忠;羅斌;;2.55m厚防輻射大體積混凝土施工[J];四川建筑科學(xué)研究;2012年01期
5 蔡輝;;跨高速公路既有線現(xiàn)澆連續(xù)梁門架檢算[J];安徽建筑;2008年03期
6 熊慶華;;跨秦淮河特大橋水中墩臨時支護施工技術(shù)研究[J];安徽建筑;2010年02期
7 陶玉武;;淺談高層住宅轉(zhuǎn)換層模板及支撐施工技術(shù)[J];安徽建筑;2011年02期
8 章世鵬;;大跨度梁板高支模支撐應(yīng)力分析及工程應(yīng)用[J];安徽建筑;2011年03期
9 王龍;;高支模板在西安地鐵施工中的應(yīng)用研究[J];安徽建筑;2011年06期
10 楊翼;;合肥鐵路樞紐128m系桿拱橋施工技術(shù)研究[J];安徽建筑;2012年02期
相關(guān)會議論文 前10條
1 包志剛;;防輻射厚墻混凝土溫度裂縫控制[A];中國混凝土進展2010[C];2010年
2 李e,
本文編號:1445603
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/1445603.html