水利工程非農(nóng)業(yè)供水水價(jià)現(xiàn)狀及改革建議
發(fā)布時(shí)間:2019-01-27 17:00
【摘要】:鑒于水利工程非農(nóng)業(yè)供水水價(jià)改革道路曲折難行,并缺乏相應(yīng)的理論基礎(chǔ),基于南京市2009~2013年的水利工程非農(nóng)業(yè)供水?dāng)?shù)據(jù),采用全成本模型測(cè)算現(xiàn)行供水成本,并對(duì)水價(jià)執(zhí)行情況及實(shí)際工作中存在的問(wèn)題進(jìn)行實(shí)地調(diào)研和分析。研究結(jié)果表明,現(xiàn)行水利工程非農(nóng)業(yè)供水水價(jià)標(biāo)準(zhǔn)時(shí)效滯后,所占供水成本不足10%,同時(shí)在水價(jià)制定、監(jiān)督管理、公眾參與及各類補(bǔ)償?shù)确矫娴捏w制機(jī)制仍有待完善。據(jù)此,提出優(yōu)化分類定價(jià)及相應(yīng)改革措施。
[Abstract]:In view of the twists and turns of the road of water price reform of water conservancy project non-agricultural water supply and the lack of corresponding theoretical foundation, based on the data of non-agricultural water supply of water conservancy project in Nanjing from 2009 to 2013, the full cost model is used to calculate the current water supply cost. And the implementation of water prices and practical problems in the field investigation and analysis. The results show that the current water price standard for non-agricultural water supply in water conservancy projects lags behind, accounting for less than 10 percent of the water supply cost. At the same time, the system and mechanism of water price formulation, supervision and management, public participation and various kinds of compensation still need to be improved. Based on this, the paper puts forward the optimization of classified pricing and corresponding reform measures.
【作者單位】: 南京大學(xué)地球科學(xué)與工程學(xué)院;南京水利科學(xué)研究院水文水資源與水利工程科學(xué)國(guó)家重點(diǎn)實(shí)驗(yàn)室;南京市水資源管理中心;
【分類號(hào)】:F323.213
本文編號(hào):2416487
[Abstract]:In view of the twists and turns of the road of water price reform of water conservancy project non-agricultural water supply and the lack of corresponding theoretical foundation, based on the data of non-agricultural water supply of water conservancy project in Nanjing from 2009 to 2013, the full cost model is used to calculate the current water supply cost. And the implementation of water prices and practical problems in the field investigation and analysis. The results show that the current water price standard for non-agricultural water supply in water conservancy projects lags behind, accounting for less than 10 percent of the water supply cost. At the same time, the system and mechanism of water price formulation, supervision and management, public participation and various kinds of compensation still need to be improved. Based on this, the paper puts forward the optimization of classified pricing and corresponding reform measures.
【作者單位】: 南京大學(xué)地球科學(xué)與工程學(xué)院;南京水利科學(xué)研究院水文水資源與水利工程科學(xué)國(guó)家重點(diǎn)實(shí)驗(yàn)室;南京市水資源管理中心;
【分類號(hào)】:F323.213
【相似文獻(xiàn)】
相關(guān)期刊論文 前5條
1 劉恒;童坤;耿雷華;姜蓓蕾;;水中長(zhǎng)期供求規(guī)劃實(shí)施對(duì)云南省農(nóng)業(yè)供水安全影響分析[J];中國(guó)農(nóng)村水利水電;2014年04期
2 謝祖國(guó);樂(lè)至縣農(nóng)業(yè)供水水價(jià)調(diào)查[J];四川水利;2000年06期
3 冼昌清;搞好農(nóng)業(yè)供水收費(fèi)經(jīng)營(yíng)管理機(jī)制改革的幾點(diǎn)看法[J];中國(guó)農(nóng)村水利水電;1998年12期
4 ;農(nóng)業(yè)供水和排水中的有毒物質(zhì)——記第二屆泛美地區(qū)灌溉會(huì)議[J];農(nóng)田水利與小水電;1989年11期
5 張星;李艷榮;宋佩儒;;深化群管體制改革勢(shì)在必行[J];現(xiàn)代農(nóng)業(yè);2014年04期
相關(guān)重要報(bào)紙文章 前1條
1 記者 彭青林 通訊員 潘瓊芳;我省今年冬修水利獲機(jī)遇[N];海南日?qǐng)?bào);2008年
,本文編號(hào):2416487
本文鏈接:http://sikaile.net/kejilunwen/nykj/2416487.html
最近更新
教材專著