基于CCPM的IT機(jī)房建設(shè)項(xiàng)目進(jìn)度管理研究
[Abstract]:At present, in many developed countries, project management has been widely used in all walks of life, project management in various fields have been widely recognized and achieved some application results, in many industries, project management bearers play a pivotal role, especially in information engineering, software engineering, production industries. Because of the one-sidedness and inefficiency of traditional project schedule management methods, it is more and more difficult to adapt to the requirements of modern project schedule management. Therefore, this paper chooses the new project management theory of Critical Chain Project Management (CCPM). The essence of CCPM is to overcome the problem of project management with resource constraints, and its project environment is more inclined to projects with greater resource uncertainty. CCPM project management advocates dynamic management as the core of the project implementation process. The continuous improvement of project management process is a process of recursion and optimization. Compared with the traditional theory, CCPM concentrates the safety time of each activity at the end of the project on the basis of the key chain sequencing, and constructs a buffer to offset the uncertainty of the project and protect the key chain, so as to achieve the effect of sharing risks. With the continuous development of the Internet industry, the IT computer room data center, as one of the important business service centers, provides a large number of stable and efficient network resources and services. In this paper, by studying the method of using critical chain technology in project management and combining with the research results of former scholars, we apply it to the construction project of IT computer room, and put forward reasonable and effective methods and models to provide powerful technical tools for the construction project of IT computer room. The efficiency difference between CCPM and CCPM in schedule management of computer room construction project shows that CCPM has high economic value in the field of IT room construction.
【學(xué)位授予單位】:深圳大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TP308
【相似文獻(xiàn)】
相關(guān)期刊論文 前2條
1 張艷;;試分析網(wǎng)絡(luò)技術(shù)、CCPM、DSM各自的特點(diǎn)[J];科技創(chuàng)新導(dǎo)報;2008年36期
2 ;[J];;年期
相關(guān)碩士學(xué)位論文 前8條
1 殷志科;CCPM理論在T公司制冷切片機(jī)轉(zhuǎn)移項(xiàng)目進(jìn)度管理中的應(yīng)用[D];華東理工大學(xué);2016年
2 周曉;CCPM在Y市物流公共信息服務(wù)平臺開發(fā)中的應(yīng)用研究[D];電子科技大學(xué);2016年
3 林遠(yuǎn)君;基于CCPM的IT機(jī)房建設(shè)項(xiàng)目進(jìn)度管理研究[D];深圳大學(xué);2017年
4 王至明;基于CCPM的船舶建造項(xiàng)目計(jì)劃管理系統(tǒng)設(shè)計(jì)與實(shí)現(xiàn)[D];哈爾濱工業(yè)大學(xué);2013年
5 郭海燕;基于質(zhì)量約束的CCPM緩沖區(qū)動態(tài)管理研究[D];河北工程大學(xué);2013年
6 莊紀(jì)美;DSIC船舶生產(chǎn)計(jì)劃CCPM應(yīng)用研究[D];大連理工大學(xué);2014年
7 李筱磊;CCPM在造船項(xiàng)目計(jì)劃管理中的應(yīng)用研究[D];大連理工大學(xué);2010年
8 任平;基于CCPM的大型復(fù)雜工程項(xiàng)目進(jìn)度管理研究[D];青島理工大學(xué);2014年
,本文編號:2198093
本文鏈接:http://sikaile.net/kejilunwen/jisuanjikexuelunwen/2198093.html