嵌入式系統(tǒng)項目需求風(fēng)險評估應(yīng)用研究
本文選題:嵌入式系統(tǒng) + 需求風(fēng)險。 參考:《華南理工大學(xué)》2012年碩士論文
【摘要】:近年來,隨著嵌入式技術(shù)的不斷發(fā)展,,基于嵌入式系統(tǒng)的產(chǎn)品隨處可見。系統(tǒng)項目能否按時保質(zhì)的完成就成為了要解決的重要問題。由于嵌入式系統(tǒng)開發(fā)過程的獨特性和不確定性,如何評估項目的需求風(fēng)險是一個重點也是一個難點。在項目的開發(fā)周期中,發(fā)現(xiàn)問題的時間與修復(fù)問題所花費的成本是成正比的。發(fā)現(xiàn)問題越早,那么修復(fù)問題的成本就越低,而需求階段恰恰是項目實施的第一個階段。如果能在需求階段評估出項目的風(fēng)險并針對風(fēng)險制定相應(yīng)的措施進行規(guī)避,那么就能在最大程度上保證項目按時保質(zhì)的完成。但是目前針對嵌入式系統(tǒng)的可具體應(yīng)用的需求風(fēng)險評估方法還都比較單一,在全面有效的評估嵌入式系統(tǒng)項目的需求風(fēng)險上還需要不斷的深入研究。 本文在介紹了嵌入式系統(tǒng)的開發(fā)過程和開發(fā)特點的基礎(chǔ)上結(jié)合及需求風(fēng)險的成因和倍增效應(yīng)研究,針對嵌入式系統(tǒng)項目在特定的開發(fā)環(huán)境下因為需求風(fēng)險導(dǎo)致項目延期的問題,研究構(gòu)建了嵌入式系統(tǒng)項目的需求風(fēng)險評估指標(biāo)體系,并在此指標(biāo)體系的基礎(chǔ)上提出了基于模糊層次分析法的需求風(fēng)險評估方法的應(yīng)用,實現(xiàn)了對嵌入式系統(tǒng)項目需求風(fēng)險的全面有效的評估。文章通過對某公司的Aimer37項目運用了該指評估標(biāo)體系和風(fēng)險評估方法,進一步驗證了評標(biāo)指標(biāo)體系和風(fēng)險評估方法的可用性。
[Abstract]:In recent years, with the development of embedded technology, products based on embedded system can be seen everywhere. Whether the system project can be completed on time has become an important problem to be solved. Because of the uniqueness and uncertainty of the embedded system development process, how to evaluate the requirement risk of the project is an important and difficult point. In the development cycle of the project, the time to find the problem is proportional to the cost of fixing the problem. The earlier the problem is discovered, the lower the cost of fixing the problem, and the requirement phase is the first phase of project implementation. If we can evaluate the risk of the project in the requirement stage and make corresponding measures to avoid the risk, then we can ensure the completion of the project on time and quality to the maximum extent. However, at present, the requirements risk assessment method for embedded system can be applied in a single way, and it needs to be studied deeply in evaluating the demand risk of embedded system project in a comprehensive and effective way. Based on the introduction of the development process and characteristics of embedded system, this paper combines the research on the causes of requirement risk and multiplying effect, aiming at the problem that the embedded system project is delayed because of the requirement risk under the specific development environment. In this paper, the requirement risk assessment index system of embedded system project is constructed, and the application of requirement risk assessment method based on fuzzy analytic hierarchy process is put forward on the basis of this index system. It realizes the comprehensive and effective evaluation of embedded system project demand risk. This paper applies the index system and the risk assessment method to the Aimer37 project of a company, and further verifies the usability of the evaluation index system and the risk assessment method.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2012
【分類號】:TP368.1
【參考文獻】
相關(guān)期刊論文 前10條
1 呂京建,肖海橋;面向21世紀(jì)的嵌入式系統(tǒng)[J];半導(dǎo)體技術(shù);2001年01期
2 李志軍;陳麗娟;劉建霞;張劍飛;;實現(xiàn)SOPC的嵌入式軟硬件協(xié)同設(shè)計平臺[J];單片機與嵌入式系統(tǒng)應(yīng)用;2011年05期
3 李曉紅;劉強;;基于Tropos模型的需求風(fēng)險分析[J];電子學(xué)報;2010年S1期
4 王延明;寒楓;肖伯旭;那瓊瀾;;一種軟件需求風(fēng)險評價模型[J];華北電力大學(xué)學(xué)報;2006年06期
5 付玉,邱冠周,馮其明,高陽;應(yīng)用軟件開發(fā)的需求風(fēng)險及控制[J];計算機工程與應(yīng)用;2005年13期
6 楊皎平;趙宏霞;;基于灰色模糊理論的軟件需求風(fēng)險評估分析[J];價值工程;2008年12期
7 萬燾;;軟件開發(fā)的需求風(fēng)險分析綜述[J];科技廣場;2011年01期
8 孫艷崇;;Windows CE嵌入式操作系統(tǒng)的特點及開發(fā)要點[J];科技信息;2010年21期
9 錢愛武;;淺析軟件項目的需求風(fēng)險及應(yīng)對措施[J];科學(xué)大眾;2007年03期
10 薛凌燕;李凌云;李寰;;基于ARM9的嵌入式系統(tǒng)的開發(fā)[J];聊城大學(xué)學(xué)報(自然科學(xué)版);2010年01期
相關(guān)碩士學(xué)位論文 前1條
1 李節(jié);管理信息系統(tǒng)需求分析階段的風(fēng)險評估模型研究[D];哈爾濱工業(yè)大學(xué);2009年
本文編號:1840858
本文鏈接:http://sikaile.net/kejilunwen/jisuanjikexuelunwen/1840858.html