水泥聯(lián)合粉磨生產(chǎn)過程控制系統(tǒng)研發(fā)
[Abstract]:Cement grinding is a key link in the production of new dry cement, which not only relates to the power consumption of cement production, but also determines the quality of cement finished products. The combined grinding system has the characteristics of strong coupling, large time-delay and time-varying, which makes it difficult to control the production process, and it is difficult to guarantee the output and quality of cement products by relying solely on the related process parameters and the test results of specific surface area. With the aid of Malvern particle size analyzer, a cement combined grinding process control system is developed based on particle size distribution and mill load. Supported by the key technology research and application demonstration project of intelligent factory (2015ZDXX0101F01), the work of this paper is as follows: (1) in order to establish a reasonable control scheme, on the basis of in-depth analysis of the combined grinding process, The control points of mill load and cement particle size distribution are determined. The key technological parameters affecting the load and particle size distribution of the mill are determined, and the corresponding control ideas and strategies are put forward. (2) in order to overcome the characteristics of time-varying, coupling and time-delay of grinding system, Bang-Bang control is used to adjust the opening of cold air valve according to different working conditions of mill load; According to the different working conditions of particle size distribution, the control method of combining Bang-Bang and dynamic matrix control is used to adjust the separator and other equipment. After filtering the field data, two models of particle size content less than 3 渭 m and 32 渭 m grain size content were established by least square method. On this basis, the particle size controller of cement combined grinding system is designed. After prediction model, rolling optimization, feedback correction, the controller parameters are determined and verified by simulation. The controller is encapsulated into a dynamic link library file for mixed programming. (3) in order to realize the process control of cement combined grinding production, the production line DCS and the OPC Server, of cement granularity analyzer are configured, and the OPC client based on C # is developed, which realizes the data exchange between different platforms. On the basis of (1) and (2), the production process control system of cement combined grinding is developed. The effectiveness of the control system for cement combined grinding process was analyzed from three aspects of mill load, particle size distribution and 28 days compressive strength combined with engineering application.
【學(xué)位授予單位】:濟南大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TQ172.632;TP273
【參考文獻】
相關(guān)期刊論文 前10條
1 陳柏林;梁喜琴;;2016年水泥行業(yè)經(jīng)濟運行分析及2017年展望[J];中國水泥;2017年02期
2 李琛;;2016年水泥工業(yè)科技發(fā)展報告——水泥工業(yè)科技發(fā)展政策解讀與挑戰(zhàn)機遇[J];中國水泥;2017年02期
3 陳江涌;;談水泥行業(yè)的進與退[J];中國建材;2017年01期
4 李蓉;;淺析我國水泥行業(yè)發(fā)展情況[J];江西建材;2016年11期
5 石國平;徐向升;;雙圈流水泥粉磨系統(tǒng)與半終水泥粉磨系統(tǒng)之比較[J];中國水泥;2016年06期
6 本刊編輯部;;水泥工業(yè)粉磨系統(tǒng)優(yōu)化改造大有作為——2016中國水泥工業(yè)粉磨系統(tǒng)優(yōu)化改造技術(shù)研討會綜述[J];新世紀水泥導(dǎo)報;2016年03期
7 董劍;王迪;陳施華;趙青林;;我國水泥工業(yè)產(chǎn)能及能耗現(xiàn)狀淺析[J];新世紀水泥導(dǎo)報;2016年02期
8 劉建;楊遠剛;于波;;輥壓機水泥半終粉磨技術(shù)的發(fā)展及應(yīng)用[J];新世紀水泥導(dǎo)報;2015年03期
9 竇艷艷;錢蕾;馮金龍;;基于Matlab的模糊PID控制系統(tǒng)設(shè)計及仿真[J];電子科技;2015年02期
10 賈華平;;水泥粉磨新型節(jié)能工藝的發(fā)展現(xiàn)狀[J];四川水泥;2014年03期
相關(guān)博士學(xué)位論文 前1條
1 梁偉平;球磨機制粉系統(tǒng)智能控制算法的研究及應(yīng)用[D];華北電力大學(xué);2000年
相關(guān)碩士學(xué)位論文 前10條
1 任俊超;球磨機系統(tǒng)先進控制算法研究及應(yīng)用[D];中國科學(xué)技術(shù)大學(xué);2015年
2 代桃桃;聯(lián)合粉磨系統(tǒng)的模糊預(yù)測控制[D];濟南大學(xué);2015年
3 魏孝吉;水泥粉磨自動控制系統(tǒng)的開發(fā)[D];濟南大學(xué);2015年
4 許斐;水泥聯(lián)合粉磨系統(tǒng)的智能控制研究[D];濟南大學(xué);2015年
5 王亞壘;電加熱鍋爐DCS系統(tǒng)的設(shè)計與實現(xiàn)[D];西安科技大學(xué);2014年
6 蔡學(xué)云;水泥生產(chǎn)生料立磨智能控制系統(tǒng)研究[D];濟南大學(xué);2014年
7 袁慕;基于PCS7的水泥生產(chǎn)全集成自動控制系統(tǒng)設(shè)計[D];武漢理工大學(xué);2014年
8 申漢杰;水泥廠DCS控制系統(tǒng)設(shè)計[D];武漢理工大學(xué);2013年
9 胡紅澤;新型干法水泥生產(chǎn)過程優(yōu)化控制策略研究[D];浙江大學(xué);2012年
10 邵云鵬;基于OPC技術(shù)的通信協(xié)議轉(zhuǎn)換平臺的設(shè)計與實現(xiàn)[D];西安電子科技大學(xué);2011年