天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 科技論文 > 化工論文 >

預制混凝土構件生產物料重調配路徑規(guī)劃方法

發(fā)布時間:2018-05-15 04:09

  本文選題:遺傳算法 + 優(yōu)化 ; 參考:《同濟大學學報(自然科學版)》2017年10期


【摘要】:分析預制混凝土構件生產中物料重調配路徑規(guī)劃問題的優(yōu)化目標和限制條件,建立載具路徑規(guī)劃模型(vehicle routing model for redispatching parts of precast components,VRM-RPP)及其求解方法.該方法通過優(yōu)化分配和利用載具資源,合理規(guī)劃行進路徑,以提高重調配工作效率,確保車間盡早開工.算例驗證結果表明,該方法可用于優(yōu)化預制生產中物料重調配路徑.
[Abstract]:This paper analyzes the optimization objectives and limiting conditions of the material redistribution path planning problem in the production of precast concrete members, and establishes the vehicle routing model for redispatching parts of precast components / VRM-RPPs model and its solution method. By optimizing the allocation and utilization of carrier resources, the method can reasonably plan the route to improve the efficiency of redeploying and ensure the workshop to start as soon as possible. The simulation results show that this method can be used to optimize the reallocation path of materials in prefabrication production.
【作者單位】: 清華大學土木工程系;
【基金】:國家“八六三”高技術研究發(fā)展計劃(2013AA041307)
【分類號】:TU528.7


本文編號:1890891

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/huagong/1890891.html


Copyright(c)文論論文網All Rights Reserved | 網站地圖 |

版權申明:資料由用戶8776d***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com