半潛式鉆井平臺(tái)錨泊系統(tǒng)設(shè)計(jì)與試驗(yàn)驗(yàn)證
[Abstract]:A multi-point extended mooring system is designed for a deep water semi-submersible drilling platform. The coupled dynamic response of ship hull and mooring system is calculated by numerical method, and the results are verified by tank model test. The results show that the maximum horizontal deviation and mooring tension of the platform meet the requirements of the specification. By comparing the calculated results with the experimental results, it is found that the mass inertia and the fluid load of the mooring rope are underestimated by the equivalent truncation method in the pool test, which leads to the calculation of the mooring tension slightly larger than that of the experimental results.
【作者單位】: 中海油研究總院;
【基金】:國(guó)家科技重大專項(xiàng)項(xiàng)目
【分類號(hào)】:P751
【相似文獻(xiàn)】
相關(guān)期刊論文 前8條
1 張松濤,張鵬,王殿龍,苗華明,劉偉偉,張軍,馬延德,劉承民;大型半潛式鉆井平臺(tái)高壓配電系統(tǒng)的開(kāi)發(fā)研究[J];中國(guó)海洋平臺(tái);2002年01期
2 ;書訊[J];海洋工程裝備與技術(shù);2014年01期
3 梁園華,鄭云龍,劉剛,馬延德,關(guān)偉姝;BINGO9000半潛式鉆井平臺(tái)結(jié)構(gòu)強(qiáng)度分析[J];中國(guó)海洋平臺(tái);2001年Z1期
4 金德賢;李潤(rùn)培;顧永寧;韓繼文;;半潛式鉆井平臺(tái)錨泊系統(tǒng)靜力分析[J];上海交通大學(xué)學(xué)報(bào);1981年02期
5 嚴(yán)錦林,竇鈞,高真所,姜福茂;BinGO 9000半潛式鉆井平臺(tái)主體結(jié)構(gòu)建造工藝問(wèn)題研究[J];中國(guó)海洋平臺(tái);2001年02期
6 張輝;;深水半潛式鉆井平臺(tái)電力系統(tǒng)的設(shè)計(jì)研究[J];電工技術(shù);2010年04期
7 馬延德;大型半潛式鉆井平臺(tái)結(jié)構(gòu)設(shè)計(jì)關(guān)鍵技術(shù)研究[J];中國(guó)海洋平臺(tái);2002年01期
8 ;[J];;年期
相關(guān)會(huì)議論文 前1條
1 胡志強(qiáng);崔維成;;多學(xué)科優(yōu)化設(shè)計(jì)在半潛式鉆井平臺(tái)設(shè)計(jì)中的應(yīng)用[A];2007年度海洋工程學(xué)術(shù)會(huì)議論文集[C];2007年
相關(guān)重要報(bào)紙文章 前1條
1 劉鴻琪;首座深水半潛式鉆井平臺(tái)開(kāi)建[N];地質(zhì)勘查導(dǎo)報(bào);2008年
相關(guān)碩士學(xué)位論文 前2條
1 李長(zhǎng)東;深水半潛式鉆井平臺(tái)水動(dòng)力性能分析及響應(yīng)控制[D];中國(guó)海洋大學(xué);2014年
2 潘方豪;深水半潛式鉆井平臺(tái)錨泊定位系統(tǒng)研究[D];上海交通大學(xué);2006年
,本文編號(hào):2132681
本文鏈接:http://sikaile.net/kejilunwen/haiyang/2132681.html