油氣勘探測(cè)井工程項(xiàng)目風(fēng)險(xiǎn)管理研究
[Abstract]:Since the 1980s, the scale of oil and gas exploration has gradually become smaller in the world, and the exploration difficulty has gradually increased for various reasons, so the exploration risk has gradually increased. My company is the American Petroleum Service Company. Some of my businesses are geological evaluation, seismic interpretation and analysis, logging engineering, logging interpretation for foreign oil companies in oil and gas exploration and development. In this paper, the risk analysis method and evaluation system of oil and gas exploration logging project are established. On the basis of consulting a lot of documents, this paper makes a detailed analysis on the present situation of oil and gas logging industry and company, points out the existing problems, and proves the necessity of studying the risk management of oil and gas exploration logging. The risk identification and classification of oil and gas exploration logging engineering projects are made by RBS method of risk structure decomposition combined with expert interview. The probability influence matrix method is used to analyze the identified risk factors qualitatively to determine their risk grade and risk quantification value, and then the analytic hierarchy process (AHP) is introduced to determine the weight of the risk factors. Combining the quantitative risk value of probability influence matrix with the weight value of AHP, the comprehensive risk evaluation of oil and gas exploration logging engineering project is carried out, and the risk degree of oil and gas exploration logging engineering project is medium risk. The risk factors identified by oil and gas exploration logging project are classified according to quadrant, and the risk countermeasures are put forward one by one for each quadrant. Through the establishment of the risk management system of the oil and gas exploration logging project in this paper, the existing risk management problems in the company can be effectively solved and the risk management of the company can be positively affected.
【學(xué)位授予單位】:中國(guó)科學(xué)院大學(xué)(工程管理與信息技術(shù)學(xué)院)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:P631.81
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 柴大勝;申金升;李根柱;;基于WBS-RBS和AHP方法的虛擬物流組織風(fēng)險(xiǎn)研究[J];北京交通大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2006年03期
2 李舒亮;張書(shū)軍;;項(xiàng)目風(fēng)險(xiǎn)損失程度的估計(jì)方法研究[J];燕山大學(xué)學(xué)報(bào);2006年03期
3 王眾;匡建超;曾劍毅;;國(guó)內(nèi)外油氣勘探風(fēng)險(xiǎn)評(píng)價(jià)研究現(xiàn)狀及發(fā)展趨勢(shì)[J];國(guó)土資源科技管理;2009年02期
4 林凜;林元慶;;基于風(fēng)險(xiǎn)矩陣的個(gè)貸風(fēng)險(xiǎn)評(píng)估[J];福建工程學(xué)院學(xué)報(bào);2009年04期
5 呂洪波;風(fēng)險(xiǎn)評(píng)價(jià)在油氣勘探開(kāi)發(fā)中的應(yīng)用、存在問(wèn)題及建議[J];安全、健康和環(huán)境;2005年07期
6 李海凌;項(xiàng)勇;;基于風(fēng)險(xiǎn)矩陣的工程項(xiàng)目投標(biāo)風(fēng)險(xiǎn)排序[J];西華大學(xué)學(xué)報(bào)(自然科學(xué)版);2009年02期
7 王國(guó)林;彭軍;王潔;;油氣勘探風(fēng)險(xiǎn)分析方法及其應(yīng)用[J];石油勘探與開(kāi)發(fā);1989年04期
8 張永峰,楊樹(shù)鋒,賈承造,陳漢林,凌春華;用于油氣勘探項(xiàng)目戰(zhàn)略經(jīng)濟(jì)評(píng)價(jià)的實(shí)物期權(quán)法[J];石油學(xué)報(bào);2003年01期
9 程鶴;耿雙軍;;模糊綜合評(píng)價(jià)的改進(jìn)模型[J];統(tǒng)計(jì)與決策;2007年13期
10 張永峰;陳漢林;賈承造;楊樹(shù)鋒;李小地;張國(guó)生;;油氣勘探開(kāi)發(fā)項(xiàng)目實(shí)物期權(quán)復(fù)合模型研究[J];天然氣工業(yè);2006年03期
,本文編號(hào):2245826
本文鏈接:http://sikaile.net/kejilunwen/diqiudizhi/2245826.html