大藤峽水利工程巖溶探測(cè)中地球物理方法研究與應(yīng)用
本文選題:大藤峽水利工程 + 巖溶 ; 參考:《吉林大學(xué)》2017年碩士論文
【摘要】:由于巖溶發(fā)育的不均一性,傳統(tǒng)的鉆探方法在巖溶調(diào)查進(jìn)行過(guò)程中,不僅耗費(fèi)大量時(shí)間與財(cái)力,而且由于鉆孔數(shù)量有限,控制點(diǎn)稀少、信息量小,不易于全面掌握工區(qū)巖溶發(fā)育情況。為了使巖溶探測(cè)工作更加高效、準(zhǔn)確、經(jīng)濟(jì)、全面,多種地球物理方法在實(shí)際探測(cè)中得到廣泛應(yīng)用,并取得了良好的探測(cè)效果。目前,巖溶探測(cè)主要地球物理方法包括瞬變電磁法(TEM)、可控源音頻電磁法(CSAMT)、探地雷達(dá)法(GPR)、高密度電阻率法、淺層地震波法(折射、反射)、電磁波CT法、地震波CT法、聲波CT法及鉆孔電視數(shù)字成像法等方法。然而,巖溶屬于隱蔽災(zāi)害地質(zhì)體,探測(cè)起來(lái)特別困難和復(fù)雜。探測(cè)對(duì)象的復(fù)雜性,即地形條件復(fù)雜、邊界條件復(fù)雜。巖溶多沿地質(zhì)構(gòu)造裂面發(fā)育,發(fā)育強(qiáng)度與水聚集、補(bǔ)給、循環(huán)、排泄條件相關(guān),且不同巖性的巖層巖溶發(fā)育強(qiáng)度有明顯差別。每種方法的適用條件不同、要達(dá)到的目的不同,因此如何選擇勘察方法顯得尤為重要。本文首先依據(jù)大藤峽水利工程地質(zhì)概況、現(xiàn)場(chǎng)情況及物性特征,對(duì)不同工程部位選取不同的地球物理方法組合。其中船閘和消力池基礎(chǔ)現(xiàn)已開(kāi)挖至基巖且地形起伏小,選用探地雷達(dá)法探測(cè)兩個(gè)工區(qū)整體巖溶發(fā)育情況,電磁波CT法輔助查明重要工程部位巖溶。泄水閘尾水渠、廠房尾水渠及下引航道工區(qū)面積大、地形起伏大、施工干擾大,選用對(duì)地面地形條件要求低、探測(cè)深度大,探測(cè)高阻背景中的低阻地質(zhì)體效果好的瞬變電磁法探測(cè)巖溶發(fā)育情況,再根據(jù)探測(cè)獲得異常區(qū)進(jìn)行鉆探驗(yàn)證。其次分別介紹三種地球物理方法的理論基礎(chǔ)和工作原理基礎(chǔ)上,結(jié)合大藤峽水利工程工區(qū)建立物理參數(shù)模型,進(jìn)行探地雷達(dá)和瞬變電磁正演模擬,并對(duì)TEM模擬數(shù)據(jù)進(jìn)行反演計(jì)算,探討不同工程部位巖溶探測(cè)中地球物理方法選擇的可行性。根據(jù)野外工作實(shí)踐,確定三種地球物理方法的數(shù)據(jù)處理流程和異常判別的標(biāo)準(zhǔn)。并完成工程部位探測(cè)數(shù)據(jù)分析,確定施工區(qū)覆蓋層厚度、地質(zhì)構(gòu)造,重點(diǎn)研究巖溶、土洞發(fā)育的規(guī)模、走向、類(lèi)別及易塌陷區(qū)范圍,為巖溶處理提供依據(jù)。最后通過(guò)本次工程的大量實(shí)地工作,以及對(duì)其他水利工程巖溶區(qū)勘察經(jīng)驗(yàn)的歸納及總結(jié),建立對(duì)于不同工程地質(zhì)條件下地球物理勘探方法的選擇體系:在水庫(kù)、壩區(qū)、帷幕、地下洞室等工程部位前期勘查過(guò)程中,根據(jù)地形情況可適當(dāng)?shù)倪x用瞬變電磁法、EH4、可控音頻大地電磁測(cè)深法及高密度電法等探測(cè)深部巖溶的發(fā)育情況,如工區(qū)基巖出露,可選用探地雷達(dá)探測(cè)淺部巖溶的發(fā)育情況。同時(shí)可以利用已有鉆孔布置電磁波CT法、地震波CT法、聲波CT法及鉆孔電視數(shù)字成像法詳細(xì)探測(cè)巖溶的位置、規(guī)模、延伸、充填情況。
[Abstract]:Because of the heterogeneity of karst development, the traditional drilling method not only consumes a lot of time and financial resources in the process of karst investigation, but also because of the limited number of boreholes, the few control points and the small amount of information. It is not easy to master the karst development in the working area. In order to make karst exploration more efficient, accurate, economical and comprehensive, a variety of geophysical methods have been widely used in practical exploration, and good results have been obtained. At present, the main geophysical methods for karst exploration include transient electromagnetic method, controllable source audio frequency electromagnetic method, ground penetrating radar method, high density resistivity method, shallow seismic wave method (refraction, reflection, electromagnetic wave CT method, seismic wave CT method). Acoustic CT and borehole TV digital imaging. However, karst is a concealed disaster geological body, which is very difficult and complex to detect. The complexity of detecting object, that is, the terrain condition is complex, the boundary condition is complex. Karst develops along the fracture surface of geological structure, and the development intensity is related to water accumulation, recharge, circulation and discharge condition, and the karst development intensity of different lithology is obviously different. Each method has different applicable conditions and different aims, so how to select the method of investigation is particularly important. In this paper, according to the geological situation, field situation and physical characteristics of Dadengxia water conservancy project, different geophysical methods are selected for different engineering sites. The foundation of shiplock and stilling pool has been excavated to the bedrock and the topography is small. The ground penetrating radar method is used to detect the whole karst development in the two working areas and the electromagnetic wave CT method is used to help identify the karst in the important engineering area. The working area of the tailwater canal, the powerhouse tailwater channel and the lower approach channel are large, the topography fluctuates greatly, the construction interference is large, the selection requires low topographic conditions on the ground, and the detection depth is large. Transient electromagnetic method (TEM), which is effective in detecting low resistivity geological bodies in high resistivity background, is used to detect karst development, and drilling verification is carried out on the basis of abnormal areas. Secondly, on the basis of the theoretical basis and working principle of three geophysical methods, combined with the physical parameter model of Dadengxia water conservancy project area, the ground penetrating radar and transient electromagnetic forward modeling are carried out. The feasibility of geophysical method selection in karst exploration of different engineering sites is discussed by inversion calculation of TEM simulation data. According to the field work practice, the data processing flow of three geophysical methods and the criteria of anomaly discrimination are determined. The data analysis of engineering site detection is completed to determine the overburden thickness and geological structure of the construction area, and to study the scale, trend, category and easy collapse area of karst and soil cave development, which provides the basis for karst treatment. Finally, through a great deal of field work of this project, as well as summing up the exploration experience of other water conservancy projects in karst area, the selection system of geophysical exploration methods under different engineering geological conditions is established: reservoir, dam area, curtain, During the Prophase exploration of underground caverns and other engineering sites, according to the topographic conditions, the transient electromagnetic method (EH4), controllable audio frequency magnetotelluric sounding method and high-density electric method can be used to detect the development of deep karst, such as the outburst of bedrock in the working area. The ground penetrating radar can be used to detect the development of shallow karst. At the same time, the location, scale, extension and filling of karst can be detected in detail by using the existing drilling arrangement electromagnetic wave CT method, seismic wave CT method, acoustic wave CT method and borehole television digital imaging method.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:P631;TV221.2
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 P.V.夏馬;佘詩(shī)剛;;地質(zhì)學(xué)中的地球物理方法[J];巖土力學(xué);1987年03期
2 葉騰飛;龔育齡;能昌信;董路;陳勇;;環(huán)境地球物理方法在污染場(chǎng)地調(diào)查中的應(yīng)用[J];南華大學(xué)學(xué)報(bào)(自然科學(xué)版);2008年03期
3 林金鑫;田鋼;王幫兵;許德樹(shù);劉菁華;趙文軻;;良渚遺址古水系調(diào)查中的綜合地球物理方法[J];浙江大學(xué)學(xué)報(bào)(工學(xué)版);2011年05期
4 王舒畋;;地球物理方法在水域工程地質(zhì)調(diào)查中的應(yīng)用[J];海岸工程;1987年02期
5 肖柏勛;;地球物理方法在安科納大滑坡研究中的作用[J];人民長(zhǎng)江;1988年04期
6 張成海;;綜合地球物理方法在找礦方面的應(yīng)用[J];科技創(chuàng)業(yè)家;2012年22期
7 趙亞臣;;淺析地球物理方法在勘察煤礦地質(zhì)災(zāi)害中的應(yīng)用[J];科技創(chuàng)新與應(yīng)用;2012年06期
8 潘仁芳;金吉能;;斷層和裂縫尺度識(shí)別的地球物理方法探討[J];長(zhǎng)江大學(xué)學(xué)報(bào)(自然科學(xué)版);2011年03期
9 王靜;地球物理方法在白蟻蟻穴探查中的應(yīng)用[J];人民長(zhǎng)江;2003年07期
10 ;水利工程隱患與地球物理方法[J];地質(zhì)裝備;2001年03期
相關(guān)會(huì)議論文 前10條
1 劉光鼎;趙永貴;;工程地球物理方法的新發(fā)展與亟待解決的問(wèn)題[A];1997年中國(guó)地球物理學(xué)會(huì)第十三屆學(xué)術(shù)年會(huì)論文集[C];1997年
2 趙文軻;田鋼;王幫兵;石戰(zhàn)結(jié);;地球物理方法在良渚古城建筑遺址勘查中的應(yīng)用[A];中國(guó)地球物理·2009[C];2009年
3 于師建;孫振鵬;吳戈;;開(kāi)采沉陷反問(wèn)題解算時(shí)地球物理方法的應(yīng)用[A];1993年中國(guó)地球物理學(xué)會(huì)第九屆學(xué)術(shù)年會(huì)論文集[C];1993年
4 方方;李寬良;侯新生;張雄飛;王小琴;;核地球物理方法在核廢物庫(kù)環(huán)境評(píng)價(jià)中的應(yīng)用[A];2001年中國(guó)地球物理學(xué)會(huì)年刊——中國(guó)地球物理學(xué)會(huì)第十七屆年會(huì)論文集[C];2001年
5 龐緒貴;姜相洪;;綜合地球物理方法在工程勘察中的應(yīng)用[A];中國(guó)地球物理學(xué)會(huì)第二十屆年會(huì)論文集[C];2004年
6 潘國(guó)富;;中美光纜網(wǎng)絡(luò)系統(tǒng)海洋路由調(diào)查中的工程地球物理方法及其應(yīng)用[A];寸丹集——慶賀劉光鼎院士工作50周年學(xué)術(shù)論文集[C];1998年
7 吳其■;路鳳香;;淺析地球物理方法在原生金剛石找礦中存在的問(wèn)題[A];第四屆全國(guó)青年地質(zhì)工作者學(xué)術(shù)討論會(huì)論文集[C];1999年
8 竇林名;谷德鐘;;采礦地球物理方法的應(yīng)用前景[A];第六屆全國(guó)采礦學(xué)術(shù)會(huì)議論文集[C];1999年
9 劉士毅;呂國(guó)印;袁柄強(qiáng);段清波;;使用地球物理方法勘查秦始皇陵地宮[A];中國(guó)地球物理學(xué)會(huì)第二十屆年會(huì)論文集[C];2004年
10 敬榮中;曾高福;黃理善;曾暉;;危機(jī)礦山深邊部找礦地球物理方法與應(yīng)用研究[A];2011(昆明)中西部第四屆有色金屬工業(yè)發(fā)展論壇論文集[C];2011年
相關(guān)重要報(bào)紙文章 前2條
1 記者 李超;走出象牙塔 牽手黃金礦[N];中國(guó)黃金報(bào);2001年
2 榮思遠(yuǎn);如何預(yù)測(cè)和找到金礦[N];中國(guó)黃金報(bào);2003年
相關(guān)博士學(xué)位論文 前2條
1 陳雄;地球物理方法在干熱巖勘查中的應(yīng)用研究[D];吉林大學(xué);2016年
2 李耀華;地球物理方法在云岡石窟表層裂隙檢測(cè)中的應(yīng)用研究[D];中國(guó)地質(zhì)大學(xué)(北京);2012年
相關(guān)碩士學(xué)位論文 前5條
1 楊嘉明;大藤峽水利工程巖溶探測(cè)中地球物理方法研究與應(yīng)用[D];吉林大學(xué);2017年
2 張寒韜;武山銅多金屬礦深部及外圍找礦綜合地球物理方法研究[D];東華理工大學(xué);2013年
3 譚大龍;綜合地球物理方法在斷層勘察中的研究與應(yīng)用[D];成都理工大學(xué);2011年
4 劉文博;綜合地球物理方法在探測(cè)采空區(qū)中的應(yīng)用研究[D];內(nèi)蒙古科技大學(xué);2015年
5 孫聰;地球物理方法在混凝土連續(xù)墻滲漏檢測(cè)中的應(yīng)用研究[D];吉林大學(xué);2014年
,本文編號(hào):2018458
本文鏈接:http://sikaile.net/kejilunwen/diqiudizhi/2018458.html