城市淺埋隧道地表沉降規(guī)律與控制分析
本文選題:淺埋隧道 切入點:地表沉降 出處:《山東科技大學》2017年碩士論文 論文類型:學位論文
【摘要】:城市地鐵建設(shè)有效解決了交通擁堵問題,在全球范圍內(nèi)地鐵建設(shè)已經(jīng)成為開辟地下空間的主要方式。但是,地鐵隧道的開發(fā)建設(shè)也面臨著施工會產(chǎn)生周圍巖土層環(huán)境改變,鄰近建(構(gòu))筑物變形以及地表沉降變形。(1)隧道開挖不采取支護條件下,對不同覆跨比淺埋隧道地表沉降規(guī)律進行數(shù)值模擬分析。分析結(jié)果表明地表沉降變形在2.5倍H/D以內(nèi)逐漸增加,2.5倍H/D以外逐漸減小,確定覆跨比強影響區(qū)為隧道埋深2.5D以內(nèi),弱影響區(qū)為2.5D以外。(2)基于Midas/GTS對青島地鐵淺埋暗挖區(qū)段進行了不同支護方式選型與優(yōu)化,通過分析經(jīng)濟效果和控制效果確定采用加長錨桿、地層注漿、加厚二襯是最經(jīng)濟合理的支護方式。(3)對青島地鐵3號線淺埋暗挖段實測數(shù)據(jù)進行分析,其地表沉降規(guī)律與Peck經(jīng)驗公式基本一致,隧道地表沉降最大值發(fā)生在隧道中心點位置,向兩側(cè)逐漸減小。對實測橫斷面數(shù)據(jù)進行Peck公式反分析,確定該區(qū)段地表沉降槽寬度系i為8.47,有效摩擦角為46.54°,地層損失率約為1.15%。通過反分析得出參數(shù)確定預(yù)測Peck公式,對后續(xù)斷面進行預(yù)測分析,結(jié)果表明在相同地層條件和埋深下,預(yù)測公式能夠較準確預(yù)測變形,在不同區(qū)段不同埋深下,地表沉降預(yù)測效果較差,因此,Peck公式反分析應(yīng)在相同條件下進行。(4)地表沉降某一點隨時間變化規(guī)律與Logistic模型變化規(guī)律基本一致,通過線性擬合取得Logistic預(yù)測曲線,對測點后續(xù)時間變化進行預(yù)測,結(jié)果表明該模型在對最終結(jié)果的預(yù)測上誤差較小,中期誤差較大。在前期小樣本數(shù)據(jù)條件下,Logistic模型可以對施工中地表沉降隨時間變化的最終沉降進行預(yù)測。
[Abstract]:Urban subway construction has effectively solved the problem of traffic congestion, and subway construction has become the main way to open up underground space in the world. However, the development and construction of subway tunnel is also faced with the change of surrounding rock and soil environment. Adjacent building deformation and ground subsidence deformation. 1) the tunnel is excavated without support. The numerical simulation analysis of the surface settlement law of shallow buried tunnels with different overlying span ratio shows that the ground subsidence deformation gradually increases within 2.5 times of H / D and decreases gradually, and the influence area of overlying span ratio is within 2.5 D of buried depth. The weakly affected area is 2.5D.) based on Midas/GTS, different support methods are selected and optimized for the shallow underground excavation section of Qingdao Metro. By analyzing the economic effect and the control effect, it is determined to adopt the lengthened anchor rod and the stratum grouting. Thickening second lining is the most economical and reasonable supporting method. (3) the measured data of shallow underground excavation section of Qingdao Metro Line 3 are analyzed. The law of surface subsidence is basically consistent with Peck's empirical formula, and the maximum value of tunnel surface settlement occurs at the center of tunnel. It is found that the width system of surface subsidence trough I is 8.47, the effective friction angle is 46.54 擄, and the loss rate of formation is about 1.15 by the back analysis of the measured cross-section data. The Peck formula for predicting the parameters is obtained. The prediction results of subsequent sections show that under the same formation conditions and buried depth, the prediction formula can accurately predict deformation, and the prediction effect of surface subsidence is poor under different buried depths in different sections. Therefore, the back-analysis of Peck formula should be carried out under the same conditions. (4) the variation law of surface subsidence with time is basically the same as that of Logistic model. The prediction curve of Logistic is obtained by linear fitting to predict the change of subsequent time of measuring point. The results show that the prediction error of the final result is small and the medium term error is large. Under the condition of small sample data in the early stage, the Logistic model can predict the final settlement of surface subsidence with time in construction.
【學位授予單位】:山東科技大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:U455.4;P642.26
【參考文獻】
相關(guān)期刊論文 前10條
1 吳惠明;滕麗;于亞磊;葉冠林;;地面出入式盾構(gòu)隧道穩(wěn)定性控制措施有效性研究[J];現(xiàn)代隧道技術(shù);2014年05期
2 康佐;鄭甲佳;謝永利;;淺埋暗挖黃土地鐵隧道施工地層空間變位分析[J];鐵道工程學報;2014年03期
3 李倩倩;張頂立;張成平;房倩;;不同埋深下地鐵隧道圍巖破壞的試驗研究[J];現(xiàn)代隧道技術(shù);2013年06期
4 何川;李訊;江英超;方勇;譚準;;黃土地層盾構(gòu)隧道施工的掘進試驗研究[J];巖石力學與工程學報;2013年09期
5 周彥良;戴俊;曹東;;曲線隧道的震害機理及抗震分析方法探討[J];公路交通技術(shù);2013年02期
6 王萬平;韓常領(lǐng);李建斐;;超淺埋小間距隧道穿越既有公路變形規(guī)律模擬研究[J];現(xiàn)代隧道技術(shù);2013年02期
7 聶運菊;劉國祥;石金峰;于冰;程朋根;;基于PSI技術(shù)監(jiān)測上海市2009年~2010年區(qū)域地表沉降[J];遙感信息;2013年02期
8 李新志;李術(shù)才;李樹忱;李英勇;馮現(xiàn)大;袁超;;極淺埋大跨度連拱隧道地表沉降模型試驗研究[J];武漢理工大學學報(交通科學與工程版);2012年06期
9 阮慶松;周傳波;阮越興;阮明清;;地鐵盾構(gòu)隧道施工引起的地表變形特征研究[J];安全與環(huán)境工程;2012年05期
10 鮑金杰;汪云甲;;InSAR測量技術(shù)在礦區(qū)地表沉降監(jiān)測中的應(yīng)用[J];煤炭科學技術(shù);2012年05期
相關(guān)博士學位論文 前4條
1 朱澤兵;大跨超淺埋輕軌車站隧道施工控制技術(shù)研究[D];重慶大學;2010年
2 蘇潔;淺埋暗挖法隧道施工對鄰近樁基的影響及其控制[D];北京交通大學;2009年
3 姚宣德;淺埋暗挖法城市隧道及地下工程施工風險分析與評估[D];北京交通大學;2009年
4 施成華;城市隧道施工地層變形時空統(tǒng)一預(yù)測理論及應(yīng)用研究[D];中南大學;2007年
相關(guān)碩士學位論文 前9條
1 劉斌;軟弱圍巖隧道洞口段預(yù)加固技術(shù)研究[D];長安大學;2014年
2 賈永州;箱形地下結(jié)構(gòu)荷載對附近淺埋隧道開挖影響的數(shù)值分析[D];北京交通大學;2013年
3 丁凌;交通擁堵的分流方法研究[D];哈爾濱理工大學;2013年
4 許奎;新建地鐵隧道密貼下穿既有地鐵車站風險控制研究[D];北京交通大學;2012年
5 蔣博林;淺埋暗挖地鐵隧道施工安全性和風險分析研究[D];重慶交通大學;2011年
6 嚴濤;地鐵隧道開挖引起的地表沉降及地鐵運行引起的環(huán)境振動研究[D];西南交通大學;2010年
7 王宇峰;試驗用土壓平衡盾構(gòu)泡沫系統(tǒng)裝置及發(fā)泡機理的研究[D];中國地質(zhì)大學(北京);2009年
8 徐明星;淺埋大斷面管棚—箱涵法關(guān)鍵技術(shù)研究[D];同濟大學;2008年
9 張穎;盾構(gòu)隧道近距離穿越施工技術(shù)研究[D];同濟大學;2007年
,本文編號:1578233