基于全壽命周期對變電站二次設(shè)計管理的研究
[Abstract]:Based on the analysis of the problems existing in the design, construction and equipment of the secondary system in the existing substation, and referring to the actual operation and maintenance experience, this paper puts forward some suggestions for improvement in each stage of the project construction from the point of view of the designer, so as to ensure the safe operation and reliable power supply of the power grid. The concept of whole life cycle is introduced, and the modular design of substation secondary design is put forward in order to reduce the influence of transformation and expansion on the operation of the whole station during the whole life cycle of substation. It is concluded that the life of the equipment is closely related to the operating environment, and the measures to improve the environment are put forward from the design point of view, and some reasonable suggestions for the design of the equipment are put forward. Based on the whole life cycle cost, considering the secondary equipment electronics of substation and the fast replacement speed of microcomputer equipment, this paper analyzes the life cycle of vulnerable components by using "bath basin curve", and puts forward that the designer signs the equipment maintenance service cycle in the technical agreement, and clarifies the quantity of spare parts in the whole project. By putting forward a new storage mode, it provides a more feasible scheme for the long-term preservation of spare parts.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2016
【分類號】:TM63
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李麗娟;;全壽命周期成本理論在電網(wǎng)規(guī)劃中的應(yīng)用分析[J];貴州電力技術(shù);2013年10期
2 王紅光;;變電站智能輔助監(jiān)控系統(tǒng)[J];電子產(chǎn)品世界;2011年10期
3 韓豫;胡繼軍;查申森;成虎;;變電站全壽命周期設(shè)計的理論及應(yīng)用[J];中國電力;2011年03期
4 黃莉;張雪松;楊衛(wèi)星;;變電站二次設(shè)備全壽命周期費(fèi)用與可靠性關(guān)系模型[J];浙江電力;2011年02期
5 吳云飛;汪濤;;資產(chǎn)全壽命周期管理在建設(shè)智能電網(wǎng)中的應(yīng)用[J];湖北電力;2010年S1期
6 馬榮方;束娜;崔海鵬;;沐山變電站二次系統(tǒng)全壽命周期設(shè)計研究[J];中國新技術(shù)新產(chǎn)品;2010年21期
7 黃少雄;;全壽命周期管理理念在變電站設(shè)計中的應(yīng)用[J];科學(xué)之友;2010年20期
8 林輝;陳巍;張穎;;全壽命周期成本分析在變電站設(shè)計建設(shè)中的應(yīng)用研究[J];中國科技信息;2009年23期
9 李璐;;電力一次設(shè)備全壽命周期組合化管理模式及實(shí)施[J];供用電;2009年02期
10 賴佳棟;楊秀苔;;供電企業(yè)中電力設(shè)備全壽命周期費(fèi)用模型研究[J];管理觀察;2008年14期
相關(guān)碩士學(xué)位論文 前4條
1 宋挺;基于全壽命周期的電網(wǎng)建設(shè)項(xiàng)目成本控制研究[D];華北電力大學(xué)(北京);2011年
2 楊秀峰;全壽命周期管理在電網(wǎng)建設(shè)項(xiàng)目中的應(yīng)用研究[D];華北電力大學(xué)(北京);2010年
3 李成金;基于全壽命期理論的變電站設(shè)計管理研究[D];鄭州大學(xué);2010年
4 張俊;基于全壽命周期成本(LCC)的變電站建設(shè)的決策分析[D];重慶大學(xué);2007年
,本文編號:2503867
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2503867.html