基于關(guān)鍵鏈的輸變電工程進(jìn)度控制及優(yōu)化研究

發(fā)布時(shí)間:2019-03-14 12:15
【摘要】:作為關(guān)系首都北京政治穩(wěn)定、能源安全和經(jīng)濟(jì)命脈的國(guó)有重要骨干企業(yè),國(guó)網(wǎng)北京市電力公司對(duì)于優(yōu)化電網(wǎng)網(wǎng)架結(jié)構(gòu)、提升供電能力、建設(shè)清潔能源配套設(shè)施等方面的投入也在持續(xù)增加,輸變電工程是最重要的投資方向。而進(jìn)度控制及優(yōu)化則是輸變電工程項(xiàng)目管理的重點(diǎn),也是影響輸變電工程項(xiàng)目成敗的主要因素之一。國(guó)網(wǎng)北京市電力公司的部分屬地供電公司對(duì)輸變電工程項(xiàng)目的進(jìn)度管理水平亟待提高。110kV檀營(yíng)輸變電工程由國(guó)網(wǎng)北京密云供電公司組織實(shí)施,是密云電網(wǎng)2015年的重要核心工程,項(xiàng)目的進(jìn)度管理存在問(wèn)題。而在輸變電工程項(xiàng)目進(jìn)度管理之中,引入了關(guān)鍵鏈技術(shù)來(lái)對(duì)整個(gè)項(xiàng)目的進(jìn)度進(jìn)行控制優(yōu)化,能夠在一定程度上解決目前輸變電工程項(xiàng)目進(jìn)度管理中存在的一些問(wèn)題,比如說(shuō)安全時(shí)間丟失、資源消耗過(guò)多等等。本文采用文獻(xiàn)資料法、案例分析法、歸納分析法等研究方法,在對(duì)工程項(xiàng)目進(jìn)度管理相關(guān)理論進(jìn)行闡述的基礎(chǔ)上,結(jié)合輸變電工程項(xiàng)目進(jìn)度管理的實(shí)際情況,對(duì)輸變電工程項(xiàng)目的特點(diǎn)及其進(jìn)度控制的主要方法進(jìn)行了梳理。同時(shí)本文以110kV檀營(yíng)輸變電工程項(xiàng)目為案例,對(duì)輸變電工程項(xiàng)目進(jìn)度管理的現(xiàn)狀以及存在的主要問(wèn)題、問(wèn)題產(chǎn)生的原因進(jìn)行了分析。并以關(guān)鍵鏈理論為基礎(chǔ),提出了110kV檀營(yíng)輸變電工程項(xiàng)目進(jìn)度控制以及優(yōu)化的思路,制定了優(yōu)化方案。本文的主要?jiǎng)?chuàng)新點(diǎn)是在梳理工程項(xiàng)目的邏輯關(guān)系的基礎(chǔ)上,通過(guò)關(guān)鍵鏈技術(shù)的引進(jìn)來(lái)進(jìn)行進(jìn)度控制優(yōu)化,提出進(jìn)度控制以及優(yōu)化的具體措施,提出較為可行的輸變電工程項(xiàng)目進(jìn)度管理方法,最終通過(guò)項(xiàng)目進(jìn)度的優(yōu)化來(lái)提高整個(gè)項(xiàng)目的管理績(jī)效。
[Abstract]:As an important key state-owned enterprise that has a bearing on the political stability, energy security and economic lifeline of the capital, the Beijing Electric Power Company of China Power Network has optimized the grid structure and enhanced the power supply capacity. Construction of clean energy facilities and other aspects of investment is also increasing, transmission and transformation projects are the most important investment direction. Schedule control and optimization is the focus of power transmission and transformation project management, and it is also one of the main factors that affect the success or failure of power transmission and transformation projects. The progress management level of some dependent power supply companies of Beijing Electric Power Company needs to be improved urgently. 110 kV Honolan Power Transmission and Transformation Project is organized and implemented by Beijing Miyun Power supply Company of State Power Network, which is an important core project of Miyun Power Grid in 2015. There are problems in the progress management of the project. In the project schedule management of power transmission and transformation projects, the critical chain technology is introduced to control and optimize the whole project schedule, which can solve some problems existing in the current project schedule management of power transmission and transformation projects to a certain extent. For example, loss of security time, excessive consumption of resources and so on. This paper adopts the methods of literature, case analysis, inductive analysis and so on, on the basis of expounding the related theories of project schedule management, and combining with the actual situation of project schedule management of power transmission and transformation projects, The characteristics of power transmission and transformation projects and the main methods of schedule control are combed. At the same time, this paper takes the 110kV Honolan power transmission and transformation project as an example, analyzes the present situation of the progress management of the power transmission and transformation project, the existing main problems, and the causes of the problems. On the basis of critical chain theory, the idea of schedule control and optimization of 110kV Honolan power transmission and transformer project is put forward, and the optimization scheme is worked out. The main innovation of this paper is that on the basis of combing the logical relationship of the engineering project, through the introduction of critical chain technology, the progress control optimization is carried out, and the concrete measures of progress control and optimization are put forward. This paper puts forward a feasible project schedule management method of power transmission and transformation project, and finally improves the management performance of the whole project by optimizing the project schedule.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM72

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 陳銘;;淺析110kV輸變電工程業(yè)主項(xiàng)目部管理[J];通訊世界;2016年20期

2 范偉達(dá);曾莎潔;;資源約束條件下工程項(xiàng)目進(jìn)度管理方法研究[J];建筑經(jīng)濟(jì);2016年10期

3 聶建明;;研究電力系統(tǒng)輸變電工程項(xiàng)目管理要點(diǎn)[J];科技與創(chuàng)新;2016年18期

4 王倩倩;;贏得值法在輸變電工程管理中的應(yīng)用分析[J];通訊世界;2016年16期

5 楊政雄;;農(nóng)村電網(wǎng)輸變電工程項(xiàng)目控制管理分析[J];中國(guó)高新技術(shù)企業(yè);2016年20期

6 白擎;;項(xiàng)目進(jìn)度管理在輸變電工程管理中的應(yīng)用研究[J];科技尚品;2016年01期

7 張棟;吳尚遠(yuǎn);王小濱;;基于目標(biāo)管理方法的輸變電線路工程管理優(yōu)化研究[J];經(jīng)營(yíng)管理者;2015年29期

8 陳楚群;;變電站電氣設(shè)備安裝及調(diào)試項(xiàng)目進(jìn)度管控探究[J];山東工業(yè)技術(shù);2015年20期

9 蔣劍川;;輸變電工程項(xiàng)目計(jì)劃管理研究[J];科技與企業(yè);2015年14期

10 徐必慶;;110kV變電站施工項(xiàng)目過(guò)程管理[J];通訊世界;2015年12期

相關(guān)碩士學(xué)位論文 前5條

1 楊娜;樓梓莊110kV輸變電工程進(jìn)度計(jì)劃與控制研究[D];華北電力大學(xué);2015年

2 王佳科;蟠龍500kV輸變電工程進(jìn)度管理優(yōu)化研究[D];華北電力大學(xué);2014年

3 陳永寧;110千伏玉井輸變電工程項(xiàng)目進(jìn)度管理研究[D];吉林大學(xué);2013年

4 孫震;河南省電網(wǎng)工程項(xiàng)目進(jìn)度管理研究[D];華北電力大學(xué);2013年

5 王翔;蒙特卡洛仿真在TD-SCDMA數(shù)據(jù)網(wǎng)管項(xiàng)目進(jìn)度管理中的應(yīng)用[D];上海交通大學(xué);2008年

,

本文編號(hào):2439969

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2439969.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶f26c8***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com