基于關(guān)鍵鏈的輸變電工程進(jìn)度控制及優(yōu)化研究
[Abstract]:As an important key state-owned enterprise that has a bearing on the political stability, energy security and economic lifeline of the capital, the Beijing Electric Power Company of China Power Network has optimized the grid structure and enhanced the power supply capacity. Construction of clean energy facilities and other aspects of investment is also increasing, transmission and transformation projects are the most important investment direction. Schedule control and optimization is the focus of power transmission and transformation project management, and it is also one of the main factors that affect the success or failure of power transmission and transformation projects. The progress management level of some dependent power supply companies of Beijing Electric Power Company needs to be improved urgently. 110 kV Honolan Power Transmission and Transformation Project is organized and implemented by Beijing Miyun Power supply Company of State Power Network, which is an important core project of Miyun Power Grid in 2015. There are problems in the progress management of the project. In the project schedule management of power transmission and transformation projects, the critical chain technology is introduced to control and optimize the whole project schedule, which can solve some problems existing in the current project schedule management of power transmission and transformation projects to a certain extent. For example, loss of security time, excessive consumption of resources and so on. This paper adopts the methods of literature, case analysis, inductive analysis and so on, on the basis of expounding the related theories of project schedule management, and combining with the actual situation of project schedule management of power transmission and transformation projects, The characteristics of power transmission and transformation projects and the main methods of schedule control are combed. At the same time, this paper takes the 110kV Honolan power transmission and transformation project as an example, analyzes the present situation of the progress management of the power transmission and transformation project, the existing main problems, and the causes of the problems. On the basis of critical chain theory, the idea of schedule control and optimization of 110kV Honolan power transmission and transformer project is put forward, and the optimization scheme is worked out. The main innovation of this paper is that on the basis of combing the logical relationship of the engineering project, through the introduction of critical chain technology, the progress control optimization is carried out, and the concrete measures of progress control and optimization are put forward. This paper puts forward a feasible project schedule management method of power transmission and transformation project, and finally improves the management performance of the whole project by optimizing the project schedule.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM72
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳銘;;淺析110kV輸變電工程業(yè)主項(xiàng)目部管理[J];通訊世界;2016年20期
2 范偉達(dá);曾莎潔;;資源約束條件下工程項(xiàng)目進(jìn)度管理方法研究[J];建筑經(jīng)濟(jì);2016年10期
3 聶建明;;研究電力系統(tǒng)輸變電工程項(xiàng)目管理要點(diǎn)[J];科技與創(chuàng)新;2016年18期
4 王倩倩;;贏得值法在輸變電工程管理中的應(yīng)用分析[J];通訊世界;2016年16期
5 楊政雄;;農(nóng)村電網(wǎng)輸變電工程項(xiàng)目控制管理分析[J];中國(guó)高新技術(shù)企業(yè);2016年20期
6 白擎;;項(xiàng)目進(jìn)度管理在輸變電工程管理中的應(yīng)用研究[J];科技尚品;2016年01期
7 張棟;吳尚遠(yuǎn);王小濱;;基于目標(biāo)管理方法的輸變電線路工程管理優(yōu)化研究[J];經(jīng)營(yíng)管理者;2015年29期
8 陳楚群;;變電站電氣設(shè)備安裝及調(diào)試項(xiàng)目進(jìn)度管控探究[J];山東工業(yè)技術(shù);2015年20期
9 蔣劍川;;輸變電工程項(xiàng)目計(jì)劃管理研究[J];科技與企業(yè);2015年14期
10 徐必慶;;110kV變電站施工項(xiàng)目過(guò)程管理[J];通訊世界;2015年12期
相關(guān)碩士學(xué)位論文 前5條
1 楊娜;樓梓莊110kV輸變電工程進(jìn)度計(jì)劃與控制研究[D];華北電力大學(xué);2015年
2 王佳科;蟠龍500kV輸變電工程進(jìn)度管理優(yōu)化研究[D];華北電力大學(xué);2014年
3 陳永寧;110千伏玉井輸變電工程項(xiàng)目進(jìn)度管理研究[D];吉林大學(xué);2013年
4 孫震;河南省電網(wǎng)工程項(xiàng)目進(jìn)度管理研究[D];華北電力大學(xué);2013年
5 王翔;蒙特卡洛仿真在TD-SCDMA數(shù)據(jù)網(wǎng)管項(xiàng)目進(jìn)度管理中的應(yīng)用[D];上海交通大學(xué);2008年
,本文編號(hào):2439969
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2439969.html