基于IEC61850技術(shù)的智能變電站二次回路安全隔離措施研究
[Abstract]:With the large-scale construction of intelligent substation and the application of new technology, the application of new technology in intelligent substation still needs to be improved, and the principle of GOOSE secondary circuit based on IEC61850 standard is not well grasped. At the present stage, there are a lot of intelligent substation reconstruction and extension projects. At the same time, some of the early intelligent substations are undergoing gradual transformation because of the equipment quality, operation life, design quality, etc., and the reconstruction and extension projects are being carried out in the operation substations. It is necessary to ensure a good separation between the operation equipment and the maintenance equipment, and in recent years, there have been frequent accidents of protection misoperation, refusal accidents and various lessons caused by improper operation of the operation and inspection personnel in the field work, which has caused us to ponder deeply. It also promotes the deep research on the secondary circuit isolation technology of intelligent substation. Taking 105 sets of combined units and the replacement of intelligent terminals in the whole station of 500kV Mahui Ling Substation of Jiangxi Power Grid as an example, the requirement of secondary circuit isolation is put forward in this paper. In order to better understand the related principle of GOOSE loop in intelligent substation, the data information model of IEC61850 is put forward, and the data model and principle of GOOSE loop transmission mechanism, GOOSE message meaning, GOOSE virtual terminal, GOOSE sending soft voltage board and so on are analyzed. On this basis, the advantages and disadvantages of different GOOSE circuit isolation techniques are analyzed, and the two isolation measures of SV sampling circuit are also summarized, and the principle of secondary equipment in intelligent substation and the matters needing attention are obtained. Finally, in the example of the transformation of 500kV Mahualing substation, the paper puts forward a way of choosing the isolation measures of intelligent substation. Combined with the conclusion of the principle of switching and retreating before, it clarifies the contents of specific safety measures, and at the same time, through a series of safeguard measures, To ensure the smooth implementation of the project. The research results of this paper have a good exemplary role and provide theoretical guidance and technical basis for all kinds of intelligent substation reconstruction projects in the future.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TM63;TM76
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 丁宣文;王平;;500kV智能變電站二次設(shè)備改造方案研究[J];四川電力技術(shù);2016年06期
2 倪賽賽;梅姚;劉科;劉巍;;智能站合并單元智能終端改造與試驗(yàn)驗(yàn)證[J];電氣自動化;2016年05期
3 嚴(yán)浩軍;姚勤豐;許欣;;智能變電站二次回路可視化研究與應(yīng)用[J];浙江電力;2015年09期
4 樊陳;倪益民;申洪;劉有為;徐明;楊威;;中歐智能變電站發(fā)展的對比分析[J];電力系統(tǒng)自動化;2015年16期
5 韓衛(wèi)恒;郝偉;孫瑞浩;;智能變電站合并單元智能終端整改方案的探討[J];山西電力;2015年03期
6 趙永生;劉海峰;梁文武;李輝;;智能變電站同步整組試驗(yàn)方法[J];中國電力;2015年05期
7 何祥文;馮正偉;汪銘峰;鄒暉;楊鑫;祝碧賢;;500kV智能變電站智能終端更換方案探討[J];浙江電力;2015年04期
8 張曼;;智能變電站設(shè)備檢修的二次安全控制措施[J];湖北電力;2015年02期
9 彭少博;鄭永康;周波;李小鵬;;220kV智能變電站檢修二次安措優(yōu)化研究[J];電力系統(tǒng)保護(hù)與控制;2014年23期
10 郝偉;馬振國;張群英;;220kV母線保護(hù)智能化改造方案的探討[J];山西電力;2014年02期
相關(guān)碩士學(xué)位論文 前3條
1 魏本成;智能變電站驗(yàn)收及運(yùn)檢方法研究[D];山東大學(xué);2015年
2 孫志鵬;智能變電站安全措施及其可視化技術(shù)研究[D];華北電力大學(xué);2014年
3 柴從信;智能變電站運(yùn)行管理研究[D];華北電力大學(xué);2013年
,本文編號:2426167
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2426167.html