水電站負荷優(yōu)化分配的分解聚合原理及應(yīng)用
發(fā)布時間:2018-11-20 16:28
【摘要】:廠內(nèi)經(jīng)濟運行是提高水電站水能效率的關(guān)鍵,但復(fù)雜水力聯(lián)系和約束條件是制約水電站負荷優(yōu)化分配數(shù)學(xué)模型求解的難點。針對這一問題,以復(fù)雜引水系統(tǒng)的漳河水庫水電站群為例,通過引水系統(tǒng)水力聯(lián)系與動力指標關(guān)系分析,以分流結(jié)點為依據(jù)將系統(tǒng)分解為不同層次的子系統(tǒng),建立了復(fù)雜引水系統(tǒng)水電站負荷優(yōu)化分配數(shù)學(xué)模型;以相同機組段水頭(或機組流量)為依據(jù),將子系統(tǒng)內(nèi)并(或串)聯(lián)機組段聚合成"等效機組",提出了分層次遞階結(jié)構(gòu)化的模型求解方法。該原理和方法不僅具有簡潔清晰的特點,而且具有靈活性、實用性及通用性的優(yōu)點,對于并行計算等現(xiàn)代技術(shù)解決大規(guī)模水電站群系統(tǒng)短期優(yōu)化問題具有廣闊的應(yīng)用前景。實例應(yīng)用驗證了方法的有效性、穩(wěn)定性和適應(yīng)性。
[Abstract]:The economic operation in the plant is the key to improve the hydraulic efficiency of hydropower stations, but complex hydraulic connections and constraints are the difficulties to solve the mathematical model of optimal load distribution of hydropower stations. In order to solve this problem, taking Zhanghe reservoir hydropower station group of complex diversion system as an example, by analyzing the relationship between hydraulic connection and dynamic index of diversion system, the system is decomposed into subsystems at different levels based on the distributary node. A mathematical model for optimal load distribution of hydropower stations in complex diversion system is established. Based on the water head (or unit flow) of the same unit section, the unit section in the sub-system and (or series) is aggregated into "equivalent unit", and a hierarchical and structured model solution method is proposed. The principle and method are not only simple and clear, but also have the advantages of flexibility, practicability and versatility. It has a broad application prospect for solving short-term optimization problems of large-scale hydropower group systems by modern techniques such as parallel computing. The effectiveness, stability and adaptability of the method are verified by an example.
【作者單位】: 水資源與水電工程科學(xué)國家重點實驗室;武漢大學(xué)水利水電學(xué)院;上海市政工程設(shè)計研究總院(集團)第六設(shè)計院有限公司;
【基金】:國家自然科學(xué)基金項目(51479141) 國家重點研發(fā)計劃項目(2016YFC0402709)
【分類號】:TV737
[Abstract]:The economic operation in the plant is the key to improve the hydraulic efficiency of hydropower stations, but complex hydraulic connections and constraints are the difficulties to solve the mathematical model of optimal load distribution of hydropower stations. In order to solve this problem, taking Zhanghe reservoir hydropower station group of complex diversion system as an example, by analyzing the relationship between hydraulic connection and dynamic index of diversion system, the system is decomposed into subsystems at different levels based on the distributary node. A mathematical model for optimal load distribution of hydropower stations in complex diversion system is established. Based on the water head (or unit flow) of the same unit section, the unit section in the sub-system and (or series) is aggregated into "equivalent unit", and a hierarchical and structured model solution method is proposed. The principle and method are not only simple and clear, but also have the advantages of flexibility, practicability and versatility. It has a broad application prospect for solving short-term optimization problems of large-scale hydropower group systems by modern techniques such as parallel computing. The effectiveness, stability and adaptability of the method are verified by an example.
【作者單位】: 水資源與水電工程科學(xué)國家重點實驗室;武漢大學(xué)水利水電學(xué)院;上海市政工程設(shè)計研究總院(集團)第六設(shè)計院有限公司;
【基金】:國家自然科學(xué)基金項目(51479141) 國家重點研發(fā)計劃項目(2016YFC0402709)
【分類號】:TV737
【相似文獻】
相關(guān)期刊論文 前10條
1 李建華;陳森林;藍家萬;潘紅中;萬偉;;水電站廠內(nèi)負荷優(yōu)化分配的通用算法研究[J];中國農(nóng)村水利水電;2006年04期
2 李安強;王麗萍;李崇浩;紀昌明;李文武;;基于免疫粒子群優(yōu)化算法的梯級水電廠間負荷優(yōu)化分配[J];水力發(fā)電學(xué)報;2007年05期
3 趙廷紅;齊學(xué)義;滿自斌;;基于多因素的改進MSS-PGA及其在水電站負荷優(yōu)化分配中的應(yīng)用[J];水力發(fā)電學(xué)報;2009年02期
4 許新發(fā),李效文,徐e,
本文編號:2345397
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2345397.html
最近更新
教材專著