天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 電氣論文 >

首尾相連型流域梯級(jí)水庫(kù)水電聯(lián)合調(diào)度研究

發(fā)布時(shí)間:2018-11-05 16:22
【摘要】:水電具有成本低、可再生、清潔無(wú)污染等特點(diǎn),符合國(guó)家建設(shè)資源節(jié)約型、環(huán)境友好型社會(huì)要求,近年來(lái)獲得了快速發(fā)展。隨著大機(jī)組、巨型流域梯級(jí)電站的相繼建成投產(chǎn),流域梯級(jí)水庫(kù)的經(jīng)濟(jì)優(yōu)化調(diào)度受到了人們的高度重視,長(zhǎng)期以來(lái)一直是研究的熱點(diǎn),研究?jī)?nèi)容主要集中于興利調(diào)度,較少涉及異常及故障情況下流域梯級(jí)水庫(kù)應(yīng)急聯(lián)合調(diào)度,且研究對(duì)象多為常規(guī)梯級(jí)水庫(kù)系統(tǒng),較少涉及首尾相連型梯級(jí)水庫(kù)系統(tǒng)。本文圍繞首尾相連型流域梯級(jí)水庫(kù)安全經(jīng)濟(jì)運(yùn)行存在的關(guān)鍵問(wèn)題,以雅礱江流域梯級(jí)水庫(kù)系統(tǒng)為主要研究對(duì)象,對(duì)該類型流域梯級(jí)水庫(kù)聯(lián)合優(yōu)化調(diào)度建模、求解方法和異常及事故情況下應(yīng)急聯(lián)合調(diào)度開(kāi)展研究,主要研究?jī)?nèi)容如下:首先,闡述了流域梯級(jí)水庫(kù)水電聯(lián)合優(yōu)化調(diào)度研究的背景和意義、梯級(jí)水庫(kù)優(yōu)化調(diào)度運(yùn)行存在的主要問(wèn)題和國(guó)內(nèi)外水庫(kù)優(yōu)化調(diào)度的主要研究進(jìn)展,并以雅礱江流域梯級(jí)水庫(kù)系統(tǒng)為例介紹了首尾相連型流域梯級(jí)水庫(kù)系統(tǒng)及其主要運(yùn)行特點(diǎn)。其次,分析了不同時(shí)間尺度上常規(guī)流域梯級(jí)水庫(kù)系統(tǒng)聯(lián)合優(yōu)化典型調(diào)度數(shù)學(xué)模型及優(yōu)化求解算法流程,選取了相應(yīng)模型對(duì)雅礱江流域梯級(jí)水庫(kù)系統(tǒng)進(jìn)行聯(lián)合優(yōu)化計(jì)算,并對(duì)優(yōu)化計(jì)算結(jié)果進(jìn)行了分析。接下來(lái),介紹了雅礱江流域首尾相連梯級(jí)水庫(kù)及其電力送出系統(tǒng),分析了該梯級(jí)水庫(kù)系統(tǒng)常規(guī)優(yōu)化調(diào)度計(jì)算結(jié)果,指出計(jì)算調(diào)度方案存在安全運(yùn)行裕度偏低問(wèn)題,提出了安全裕度目標(biāo)函數(shù)并求解出該函數(shù)最優(yōu)運(yùn)行解,以此為基礎(chǔ)提出了適合該流域梯級(jí)水庫(kù)系統(tǒng)改進(jìn)優(yōu)化調(diào)度數(shù)學(xué)模型并進(jìn)行了實(shí)例求解,計(jì)算結(jié)果驗(yàn)證了改進(jìn)優(yōu)化調(diào)度數(shù)學(xué)模型在解決常規(guī)興利調(diào)度中安全裕度偏低問(wèn)題、兼顧興利調(diào)度與安全運(yùn)行風(fēng)險(xiǎn)的有效性。最后,分析了典型異常及事故情況下首尾相連型流域梯級(jí)水庫(kù)系統(tǒng)安全運(yùn)行存在的主要風(fēng)險(xiǎn),提出了相應(yīng)的水電聯(lián)合應(yīng)急調(diào)控策略,總結(jié)提煉出首尾相連型梯級(jí)水庫(kù)系統(tǒng)正常及極端工況下的聯(lián)合調(diào)度運(yùn)行關(guān)鍵技術(shù),并以實(shí)際運(yùn)行案例驗(yàn)證了異常及事故情況發(fā)生時(shí)流域梯級(jí)水庫(kù)系統(tǒng)極端工況下水電聯(lián)合應(yīng)急調(diào)度策略的可行性。
[Abstract]:Hydropower has the characteristics of low cost, renewable, clean and pollution-free. It meets the requirements of national construction of resource-saving and environment-friendly society, and has been developed rapidly in recent years. With the construction and production of large units and giant river basin cascade power stations, people attach great importance to the economic optimal operation of cascade reservoirs in the basin, which has long been the focus of research. The emergency joint operation of cascade reservoirs in river basin is seldom involved in abnormal and fault situations, and the research object is mostly conventional cascade reservoir system, and the first and last connected cascade reservoir system is less involved. This paper focuses on the key problems existing in the safe and economic operation of cascade reservoirs in the first and last connected river basins. Taking the cascade reservoir system of the Yalong River basin as the main research object, this paper models the joint optimal operation of the cascade reservoirs in this type of watershed. The main contents of the research are as follows: firstly, the background and significance of the research on cascade reservoir hydropower joint optimal dispatching in river basin are expounded. The main problems existing in the optimal operation of cascade reservoirs and the main research progress in the optimal operation of reservoirs at home and abroad are discussed. Taking the cascade reservoir system of the Yalong River basin as an example, the cascade reservoir system of the first and last connected river basins and its main operating characteristics are introduced. Secondly, the typical mathematical model and algorithm flow of joint optimization of conventional cascade reservoir system in different time scales are analyzed, and the corresponding model is selected to carry out joint optimization calculation of cascade reservoir system in Yalong River basin. The results of optimization calculation are analyzed. Then, the cascade reservoir and its electric power supply system in Yalong River basin are introduced. The results of conventional optimal operation calculation of the cascade reservoir system are analyzed, and the problem of low safety operation margin in the calculation and dispatching scheme is pointed out. The objective function of safety margin is put forward and the optimal operation solution of this function is obtained. Based on this, a mathematical model for improving optimal operation of cascade reservoir system in the basin is proposed and an example is given to solve the problem. The calculation results show that the improved mathematical model of optimal scheduling is effective in solving the problem of low security margin and taking into account the risks of profit scheduling and security operation. Finally, the main risks in the safe operation of cascade reservoir system in the case of typical anomalies and accidents are analyzed, and the corresponding combined emergency control strategies for hydropower are put forward. Summing up and refining the key technology of combined operation under normal and extreme working conditions of the cascade reservoir system connected with head and tail, The feasibility of the combined emergency dispatching strategy of hydropower under extreme conditions of cascade reservoir system in river basin is verified by actual operation cases.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM73

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 余平;蒲瑜;成建軍;;錦屏“一廠兩站”自動(dòng)發(fā)電控制系統(tǒng)設(shè)計(jì)研究[J];中國(guó)農(nóng)村水利水電;2014年11期

2 陳鵬;余平;蒲瑜;;雅礱江流域下游梯級(jí)水電站聯(lián)合實(shí)時(shí)優(yōu)化調(diào)度探討[J];中國(guó)農(nóng)村水利水電;2014年09期

3 周建中;張睿;王超;張勇傳;;分區(qū)優(yōu)化控制在水庫(kù)群優(yōu)化調(diào)度中的應(yīng)用[J];華中科技大學(xué)學(xué)報(bào)(自然科學(xué)版);2014年08期

4 楊侃;周佳佳;王文卓;楊柳;;水電站最優(yōu)負(fù)荷分配改進(jìn)退火粒子群算法[J];華中科技大學(xué)學(xué)報(bào)(自然科學(xué)版);2014年02期

5 唐杰陽(yáng);張曉輝;毛成鋼;黃光倫;丁義;;流域梯級(jí)電站群集控模式下的應(yīng)急處置機(jī)制初探[J];四川水力發(fā)電;2013年05期

6 唐新華;周建軍;;梯級(jí)水電群聯(lián)合調(diào)峰調(diào)能數(shù)學(xué)模型[J];水力發(fā)電學(xué)報(bào);2013年04期

7 鄭姣;楊侃;蔣詠;盧修元;;解空間遺傳算法在水電站廠內(nèi)經(jīng)濟(jì)運(yùn)行中的研究[J];水力發(fā)電學(xué)報(bào);2013年03期

8 汪亮;李成家;解建倉(cāng);王蕾;;電網(wǎng)直調(diào)水電站負(fù)荷分配模式研究[J];水力發(fā)電學(xué)報(bào);2012年05期

9 徐剛;;梯級(jí)電站廠間負(fù)荷分配算法研究[J];水力發(fā)電學(xué)報(bào);2012年03期

10 程雄;武新宇;程春田;郭希海;;松江跨流域引水梯級(jí)電站群長(zhǎng)期優(yōu)化調(diào)度方法[J];水利學(xué)報(bào);2012年04期

相關(guān)博士學(xué)位論文 前1條

1 李芳芳;大型梯級(jí)水電站調(diào)度運(yùn)行的優(yōu)化算法[D];清華大學(xué);2011年

,

本文編號(hào):2312625

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2312625.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶968b5***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com