[Abstract]:Hydropower has the characteristics of low cost, renewable, clean and pollution-free. It meets the requirements of national construction of resource-saving and environment-friendly society, and has been developed rapidly in recent years. With the construction and production of large units and giant river basin cascade power stations, people attach great importance to the economic optimal operation of cascade reservoirs in the basin, which has long been the focus of research. The emergency joint operation of cascade reservoirs in river basin is seldom involved in abnormal and fault situations, and the research object is mostly conventional cascade reservoir system, and the first and last connected cascade reservoir system is less involved. This paper focuses on the key problems existing in the safe and economic operation of cascade reservoirs in the first and last connected river basins. Taking the cascade reservoir system of the Yalong River basin as the main research object, this paper models the joint optimal operation of the cascade reservoirs in this type of watershed. The main contents of the research are as follows: firstly, the background and significance of the research on cascade reservoir hydropower joint optimal dispatching in river basin are expounded. The main problems existing in the optimal operation of cascade reservoirs and the main research progress in the optimal operation of reservoirs at home and abroad are discussed. Taking the cascade reservoir system of the Yalong River basin as an example, the cascade reservoir system of the first and last connected river basins and its main operating characteristics are introduced. Secondly, the typical mathematical model and algorithm flow of joint optimization of conventional cascade reservoir system in different time scales are analyzed, and the corresponding model is selected to carry out joint optimization calculation of cascade reservoir system in Yalong River basin. The results of optimization calculation are analyzed. Then, the cascade reservoir and its electric power supply system in Yalong River basin are introduced. The results of conventional optimal operation calculation of the cascade reservoir system are analyzed, and the problem of low safety operation margin in the calculation and dispatching scheme is pointed out. The objective function of safety margin is put forward and the optimal operation solution of this function is obtained. Based on this, a mathematical model for improving optimal operation of cascade reservoir system in the basin is proposed and an example is given to solve the problem. The calculation results show that the improved mathematical model of optimal scheduling is effective in solving the problem of low security margin and taking into account the risks of profit scheduling and security operation. Finally, the main risks in the safe operation of cascade reservoir system in the case of typical anomalies and accidents are analyzed, and the corresponding combined emergency control strategies for hydropower are put forward. Summing up and refining the key technology of combined operation under normal and extreme working conditions of the cascade reservoir system connected with head and tail, The feasibility of the combined emergency dispatching strategy of hydropower under extreme conditions of cascade reservoir system in river basin is verified by actual operation cases.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TM73
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 余平;蒲瑜;成建軍;;錦屏“一廠兩站”自動發(fā)電控制系統(tǒng)設(shè)計研究[J];中國農(nóng)村水利水電;2014年11期
2 陳鵬;余平;蒲瑜;;雅礱江流域下游梯級水電站聯(lián)合實時優(yōu)化調(diào)度探討[J];中國農(nóng)村水利水電;2014年09期
3 周建中;張睿;王超;張勇傳;;分區(qū)優(yōu)化控制在水庫群優(yōu)化調(diào)度中的應(yīng)用[J];華中科技大學(xué)學(xué)報(自然科學(xué)版);2014年08期
4 楊侃;周佳佳;王文卓;楊柳;;水電站最優(yōu)負(fù)荷分配改進(jìn)退火粒子群算法[J];華中科技大學(xué)學(xué)報(自然科學(xué)版);2014年02期
5 唐杰陽;張曉輝;毛成鋼;黃光倫;丁義;;流域梯級電站群集控模式下的應(yīng)急處置機(jī)制初探[J];四川水力發(fā)電;2013年05期
6 唐新華;周建軍;;梯級水電群聯(lián)合調(diào)峰調(diào)能數(shù)學(xué)模型[J];水力發(fā)電學(xué)報;2013年04期
7 鄭姣;楊侃;蔣詠;盧修元;;解空間遺傳算法在水電站廠內(nèi)經(jīng)濟(jì)運行中的研究[J];水力發(fā)電學(xué)報;2013年03期
8 汪亮;李成家;解建倉;王蕾;;電網(wǎng)直調(diào)水電站負(fù)荷分配模式研究[J];水力發(fā)電學(xué)報;2012年05期
9 徐剛;;梯級電站廠間負(fù)荷分配算法研究[J];水力發(fā)電學(xué)報;2012年03期
10 程雄;武新宇;程春田;郭希海;;松江跨流域引水梯級電站群長期優(yōu)化調(diào)度方法[J];水利學(xué)報;2012年04期
相關(guān)博士學(xué)位論文 前1條
1 李芳芳;大型梯級水電站調(diào)度運行的優(yōu)化算法[D];清華大學(xué);2011年